BUILDING SERVICES TWO (BLD60503)

HVAC Systems & Building

Page 2: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation

Prepared by Tan Hee Chai

Page 3: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation RequirementsThe effect of air on health and comfort depends upon:Movements;Humidity andTemperature

Page 4: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Page 5: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Page 6: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation systemRatio Main Elements in Dry atmospheric

Oxygen 21%

Carbon dioxide 0.03%

Nitrogen NeonHelium HydrogenWater Vapour79%

Page 7: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation Requirements

Air change important for two reasons:

1.Maintain a satisfactory level of oxygen content – essential for life2.To remove impurities

Page 8: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation Requirements

Page 9: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)Ventilation System

Rate of air change = ratio of fresh air supplied each hour to volume of the enclosed space

Page 10: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation System Example: A private office of 30 m3 volume designed for 2 persons:Recommended m3/hour per person is 43

43/30 x 2 = 2.86 air change per hour

Page 11: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation System

Ordinary conditions

Fresh air supply of 30 -35m3 per person per hour

• 1.5 air changes per hour for family of 4

Normal living room 45 m3:

Page 12: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation System

Page 13: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation SystemVentilation rates requirements:Normally based on recommendations by authorities or code of practice e.g:•Department of Occupational Safety & Health (DOSH)•Malaysian Standard Code of Practice

Page 14: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation System

Apart from fresh air, movement of air over surface of body necessary to remove surplus •heat, •water vapour, •carbon dioxide and •organic vapours from body

Page 15: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)Ventilation System

Desirable characteristics of atmosphere:•Cool •Dry •Diverse in temperature in different parts and at different times •Moving

Undesirable characteristics of atmosphere:•Hot•Damp•Uniform and Monotonous•Still

Page 16: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation System

Desirable characteristics of atmosphere:•Air change•Proper means of ventilation

Undesirable characteristics of atmosphere:•Cubic space•Excessive cubic space

Page 17: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation SystemVentilation principles:

To prevent undue concentrations of odours,

Bacteria carrying particles andNoxious gases

Page 18: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation SystemVentilation principles:

To remove heat from products of combustionBody heat and heat from electrical equipment, motors, heat from solar radiation etc

Page 19: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation SystemVentilation principles:

To remove fumes, dust etc produced by industrial process

Page 20: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)Ventilation System

Ventilation principles:To maintain the relative humidity within reasonable limits

Page 21: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation SystemVentilation principles:Percentage saturation = Weight of moisture in the air/weight of moisture if air were saturated at the same temperature x 100%Relative humidity (RH) = Vapour pressure of moisture present/ Vapour pressure if air were saturated at the same temperature x 100%

Page 22: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation SystemVentilation principles: Relative Humidity

Page 23: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation principles:

To create air movement

Page 24: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Natural Ventilation

• Natural ventilation systems rely on pressure differences to move fresh air through buildings.

• Pressure differences can be caused by wind or the buoyancy effect created by temperature differences or differences in humidity.

Page 25: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Natural Ventilation

Page 26: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Pressure Patterns caused by wind

Page 27: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Passive stack ventilation (PSV)

PSV Consist of Extract grilles at ceiling height Ducts to terminal at roof

Page 28: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Passive stack ventilation (PSV) Types of vent

Page 29: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Natural Ventilation System

Page 30: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Building Regulation

Habitable or occupiable rooms located on an external wall

Requirements require a window

opening with permanent background ventilation

Natural Ventilation System

Non-habitable rooms in domestic buildings

Maybe ventilated mechanically or by passive stack ventilation system

Page 31: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Building Regulation

Rooms with no openable windows in non-domestic buildings

Requirements Mechnical ventilated

or air-conditioning

Natural Ventilation System

Kitchen,bathrooms,utility rooms etc

Open window and mechanical extract ventilation or by passive stack ventilation system

Page 32: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Mechanical Ventilation System

Artificial methods of preserving the purity and controlling the temperature of the atmosphere.

Page 33: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Mechanical Ventilation System

Method: Extract Supply Combined extract and input

Page 34: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Extractor fan system

Page 35: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Extractor fan

Page 36: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Extract system

• Cheap to install and operate• Definite volume of air is removed from

buildings• Air entering to replace cannot be controlled.• Draughts are created

Page 37: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Supply system

Page 38: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Supply system

Page 39: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

• Air delivered under pressure.

• Include air heater battery with automatic

control over temperature of air delivered

into rooms

• An air filtration device

Supply system

Page 40: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

• Easy to install in existing buildings• Can be included when designing new

building.• Eliminates draughts by building up

pressure inside the spaces

Supply system

Page 41: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Combined supply & extract system with propeller fans

Page 42: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Combined supply & extract system with propeller fans

Page 43: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503) Heat Exchanger

Page 44: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503) Heat Exchanger

Page 45: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Mechanical Ventilation System

Components:FanFiltersDuctworkFire dampersDiffusers

Page 46: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Mechanical Ventilation System

Types of Fan Cross-flow or tangential Propeller Axial flow Centrifugal

Page 47: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Wall mounted propeller fan

Page 48: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Axial-flow fan

Page 49: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Bifurcated axial flow fan

Page 50: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Centrifugal fan

Page 51: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Centrifugal fan

Page 52: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Centrifugal fan

Page 53: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Cross-flow or tangential fan

Page 54: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Filters

Dry Filter made of •Paper•Fine woven fabrics•Foamed plastics or fibreglass

Page 55: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Dry Filters

Page 56: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Filters

Viscous or Wet Filter made of •A bank or rows of corrugated metal sheets with surface coated in non-flammable, non-toxic odourless oil

Page 57: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Viscous or Wet Filter

Page 58: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Electrostatic Filterconsist of •Pre-filter•Power pack•Ioniser•Rows of opposing charged plates

Page 59: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Electrostatic Filter

Page 60: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Electrostatic Filter

Page 61: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Activated carbon Filter

Page 62: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Activated carbon Filter

made of •Disposable elements of glass fibrous matting containing charcoal granular

Page 63: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Page 64: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Page 65: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation duct design

Page 66: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Factors influencing the size of ducts for air transport are:

The volume of flow rate of the air The friction of the air against the walls of

the ducts and any turns and protrusions. The pressure available for the movement of

air.

Page 67: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Page 68: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Calculation of air volume flow rate:

Q = Room volume x air changes per hour/time in seconds

Where • Q is the volume of flow rate in

m3/s

Ventilation duct design

Page 69: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)Ventilation duct design

Page 70: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation duct design - Chart

Page 71: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation duct design

Page 72: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)Ventilation duct design

Page 73: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)Ventilation duct design

Page 74: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation duct design

Page 75: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation Design – Duct conversion

Page 76: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

Ventilation Design – Duct conversion chart

Page 77: BS2 Hvac ventilation 1

BUILDING | SERVICES | TWO (BLD60503)

The End