Pinnacle Corporate Centre V--Class A Office Building

Preview:

Citation preview

Pinnacle Corporate Centre V

Tomahawk Creek Parkway, Leawood, Kansas

Pinnacle Corporate Centre V – 114th Street & Tomahawk Creek Parkway

Leawood, Kansas

Gross Rentable: 69,890 gross sfNet Rentable Area: 66,520 rentable sf

Elevations – Three Stories

Developer – Block Development Company, Inc.

Building Summary• Description:

– The Pinnacle Corporate Centre V building will be a 3-story, high image office

building composed of multiple shades of brick, pre-cast stone and reflective glass. Superior construction and building systems, convenient interstate access, ample parking, along with the south Johnson County location makes the Pinnacle Corporate Centre V an ideal long-term office building location.• Tenancy:

– Corporate tenants desiring quality, state of the art, suburban office space in a

park-like setting.• Parking:

– The property will contain 282 surface parking spaces or 4.3 spaces per 1,000

square feet of rentable area.

Building Profile• Building Description:

– The Pinnacle Corporate Centre V building will be a 3-story, high image corporate office building. Convenient interstate access, ample parking, along with the south Johnson County.

• Completion Date: – As demand justifies

• Land Area: – 179,590 square feet

• Building Data: – Gross Building Area: 69,890 +/- gross square feet– Gross Net Rentable Area: 66,520 +/- net rentable square feet

Building Profile• On-Site Parking:

– The property will contain 282 surface parking spaces or 4.3 spaces per 1,000 square feet of rentable area.

• Elevators: – The building will feature two Otis high speed hydraulic passenger elevators.

The elevators will have a capacity of 3,500 pounds with a speed of 150 fpm.• Roof:

– The roof will be mechanically fastened TPO Membrane roofing system.• HVAC:

– The building will be climate controlled by two 90-ton Trane Intelipac units distributed by a variable air volume system. A direct digital control (DDC), with Trane Tracer Summit system, HVAC system will be installed in the building to provide multiple zones per floor. An energy management system with wireless VAV box controls will also be installed to insure energy efficiency.

For more information contact:

• Hunter Johnson– 816.412.5878– hjohnson@blockllc.com

• Kenneth G. Block, SIOR, CCIM– 816.932.5551– kblock@blockllc.com

• Max Wasserstrom– 816.412.8428– mwasserstrom@blockllc.com

Recommended