PARSIPANY II EXPANSION PROJECT UPDATES

Steady progress on the Net Access Parsippany II data center expansion. Once completed it will give us 70,000 gross sq. ft. of additional building

space, with the capacity for 1,500 new cabinets. Look for our Grand Opening in Q1 2015!

November 2014 – Security Wall Construction

September 2014 - First Floor Poured Concrete Slab

3

August 2014 – Advanced Cooling System Install

July 2014

June 2014 - 1st Floor Rebar Foundation

June 2014 – ‘Drone’s Eye’ View

May 2014

March 2014

January 2015

Parsippany II, Phase II (WBR2)

• 70,000 gross sq. ft. of additional building space (120,000 total sq. ft.)• Capacity for 1,500 new Cabinets• Powered by two additional Power Systems with over 5MG of usable UPS power• Onsite JCP&L Power Substation• Available for occupancy in Q1 2015

11

Parsippany II Data Center – Overview (WBR)• Owned, purpose-built, state-of-the-art

facility – 2 mirrored UPS rooms supported by 2

mirrored generator rooms– 4 independent N+1 electrical systems– N+1 cooling redundancy– 4.9 megawatts of useable UPS at capacity

• Advanced, ultra efficient N+1 cooling • Hot air discharged via cabinet

chimneys – hot/cold air don’t mix

• Hot air exchanged with cooler outside air

• Full portfolio of Onsite FLEXServices for hybrid IT solution implementations