M&A at Younicos

Preview:

Citation preview

Let the fossils rest in peace

Obrigado!

Younicos System Control and Energy Management System

Energy Management and SCADA SystemEnergy Management and SCADA System

CommunicationCommunication ForecastForecastDispatchDispatch

Data LoggingData Logging VisualizationVisualization

Consumers

User InputUser Input

U, fU, f U, f U, f

Y ControllerY ControllerY Interface & Local ControlY Interface & Local Control

Y Interface & Local ControlY Interface & Local Control

Y Interface & Local ControlY Interface & Local Control

Back up

Optimization Optimization

Electrical Network (U, f)

Cent

ral u

nit

dece

ntra

lized

m, h, d

µs, ms, s

IEC 61850

VISION: Future energy supply shall rely on Renewable Energy (RE) worldwide Example: European RE targets (20% in 2020, 30% in 2030, ….)

European Renewable Energy Goals

0%

20%

40%

60%

80%

100%

2010

2020

2030

2040

2050

2060

2070

2080

2090

2100

Year

Ren

ewab

le E

ner

gy

Fra

ctio

n

European Renewable Energy Goals

0%

20%

40%

60%

80%

100%

20102020

20302040

20502060

20702080

20902100

YearR

enew

able E

nerg

y Fractio

n

For a stable grid based on renewable energies

• Storage Technologies

• New Control strategies

are required

StableInstable

NaS Battery Features

High Energy Density About 3 x that of Lead-Acid

High Capacity Up to 6 Hours continuous discharging

Long Expected Life Up to15 years, 4500 cycles

High Energy Efficiency 85% DC Efficiency

No Self Discharge

No Memory Effect

Proven Technology 270 MW installation records

Easy Maintenance Inspection every 3 years only

Fast Response 2 ms

Operating Temperature 300 °C

Recommended