How to Balance NERC CIPv6 vs. CIPv5 Compliance

Preview:

Citation preview

How to Balance NERC CIPv6 vs. NERC CIPv5 Compliance

2

Nick SantoraCEO

Curriculanick@getcurricula.com

Twitter: @curricula

Tim ErlinSr. Director, Product Management

Tripwire

terlin@tripwire.com

Twitter: @terlin

3

Agenda

CIPv6 Changes

How CIPv6 Affects Your Personnel

Three Critical Steps to Take Before July

Q&A

4

Changes in CIPv6

WORDSWORDSWORDS

Reading standards can be difficult

5

Changes in CIPv6

Low Impact Assets Transient Devices and Removable Media

Logical Controls for Physical Security

Identifies, assesses and corrects

• CIP 003-6 • CIP-004-6• CIP-010-2

• CIP-006-6 • CIP-004-6• CIP-007-6• CIP-009-6• CIP-011-2

6

Changes in CIPv6Low Impact Assets Transient Devices and

Removable MediaLogical Controls for Physical Security

Identifies, assesses and corrects

• CIP 003-6 • CIP-004-6• CIP-010-2

• CIP-006-6 • CIP-004-6• CIP-007-6• CIP-009-6• CIP-011-2

Attachment 1 Cyber Security Awareness Physical Security Controls Electronic Access Controls Cyber Security Incident

Response

7

Changes in CIPv6Low Impact Assets Transient Devices and

Removable MediaLogical Controls for Physical Security

Identifies, assesses and corrects

• CIP 003-6 • CIP-004-6• CIP-010-2

• CIP-006-6 • CIP-004-6• CIP-007-6• CIP-009-6• CIP-011-2

Attachment 1 Cyber Security Awareness Physical Security Controls Electronic Access Controls Cyber Security Incident

Response

Attachment 2 Documentation Documentation Documentation Documentation

8

Changes in CIPv6Low Impact Assets Transient Devices and

Removable MediaLogical Controls for Physical Security

Identifies, assesses and corrects

• CIP 003-6 • CIP-004-6• CIP-010-2

• CIP-006-6 • CIP-004-6• CIP-007-6• CIP-009-6• CIP-011-2

If you use transient cyber assets and removable media ….

…Then you need a plan for:• Transient Asset Management• Transient Asset Authorization• Vulnerability Mitigation• Malicious Code Mitigation• Unauthorized Use Mitigation

Removable Media Authorization

Removable Media Malicious Code Mitigation

9

Changes in CIPv6Low Impact Assets Transient Devices and

Removable MediaLogical Controls for Physical Security

Identifies, assesses and corrects

• CIP 003-6 • CIP-004-6• CIP-010-2

• CIP-006-6 • CIP-004-6• CIP-007-6• CIP-009-6• CIP-011-2

If you use transient cyber assets and removable media ….

…Then you need a plan for:• Transient Asset Management• Transient Asset Authorization• Vulnerability Mitigation• Malicious Code Mitigation• Unauthorized Use Mitigation

Removable Media Authorization

Removable Media Malicious Code Mitigation … and training!

Effective Date Now April 1st 2017

10

Changes in CIPv6Low Impact Assets Transient Devices and

Removable MediaLogical Controls for Physical Security

Identifies, assesses and corrects

• CIP 003-6 • CIP-004-6• CIP-010-2

• CIP-006-6 • CIP-004-6• CIP-007-6• CIP-009-6• CIP-011-2

If you can’t implement the required physical controls, you can implement compensating logical controls: - Encryption- Monitoring- “an equally effective logical control”

“The entity is under no obligation to justify or explain why it chose logicalprotections over physical protections identified in the requirement.”

11

Changes in CIPv6Low Impact Assets Transient Devices and

Removable MediaLogical Controls for Physical Security

Identifies, assesses and corrects

• CIP 003-6 • CIP-004-6• CIP-010-2

• CIP-006-6 • CIP-004-6• CIP-007-6• CIP-009-6• CIP-011-2

FERC Order 791:

“[T]he Commission is concerned that the proposed language is overly-vague, lacking basic definition and guidance that is needed, for example, to distinguish a successful internal control program from one that is inadequate.”

12

CIPv6 Compliance DatesIt’s not all about July 1st 2016

July 1st 2016

CIP-003-6 1.2 4/1/2017CIP-003-6 R2 4/1/2017CIP-003-6 A1-1 4/1/2017CIP-003-6 A1-2 9/1/2018CIP-003-6 A1-3 9/1/2018CIP-003-6 A1-4 4/1/2017CIP-006-6 1.10 7/1/2016 or 4/1/2017CIP-007-6 1.2 7/1/2016 or 4/1/2017CIP-010-2 R4 4/1/2017

Low Impact Assets

Conditional Deadlines

Transient/Removable

13

How CIPv6 Affects Your Personnel

• Training program

• Awareness program

• Transient and Removable

• Risks to education

14

Training Program

15

What Is Required?

9 Objective Statements

16

What Is Required?

Training Prior To Access

17

What is Required?

Re-train Every CIP Year

18

What Will Auditors Look For?

“Regurgitating the Requirement language does not constitute developing a policy, program,process, or procedure.”

WECC Presentation

19

Role Based Training

20

Awareness Program

21

Awareness Program

High and Medium Low

22

Transient and Removable

What Is Required?

23

Transient and Removable

When?

24

Transient and Removable

Why implement after training?

25

Risks in Education

Not It Million Dollar Filing Cabinet

26

Three Critical Steps

NERC CIPv5 Preparation

April 1st

27

Three Critical Steps

NERC CIPv5 Preparation FOUND TIME

April 1st July 1st

28

Three Critical Steps

NERC CIPv5 Preparation FOUND TIME

April 1st July 1st

What should you do with the time remaining before the July deadline?

29

Critical Step 1: Conduct a Mock AuditThere is no compliance without audit

Identify areas of weakness in compliance or evidence.

Establish responses for actual audit Develop mitigation plans for non-compliance

30

Critical Step 2: Review Your Training Programs

31

Critical Step 3: Automate Or Die

Compliant Automated

32

www.getcurricula.com www.tripwire.com

tripwire.com | @TripwireInc

Q & A

Recommended