Site Progress for Mid February

Date: 02-12-09

By: Gene Lynch

Duplex Filter RemovalFor Lube Oil Flush.

Engine 6

Duplex Filter Removal & Inspection. Engine 6

02-06-09

Crank Web Deflection/Engine 6 02-06-09

Engine Alignment/Engine 6 02-09-09

Alignment/Engine 6

Alternator Alignment/Engine 6

Alternator Alignment/Engine 6

Alternator Alignment/Engine 6

Lube Oil Flush ConnectionEngine 6

Power Block ABuilding Erection

Sub Transformer

Station Transformer A

Neutral Grounding Resistor

Station Transformer AMedium Line Termination

Power Block A

Power Block A Radiator Cooling Water Piping Fabrication

HT/LT Cooling Water Piping

Inside Block A

Power Block AEngine 6 Side

Engine 6 IntakeExhaust

Power Block A

Overall Site 02-11-09

Sub Station 02-11-09

Tank Farm Fabrication Shop 02-11-09

Paint Shops & Steel Lay Down Yard 02-11-09

West Side of Power Block A 02-11-09

Security Headquarters 02-11-09

Road Detour To Keep Civilian Traffic Away FromFront Entrance To Site. 02-11-09

Power Block B ExhaustStack Foundations 02-12-09

Covering for Sub Base Pourof Thermal Boilers. 02-12-09

West Wall Construction forPower Block C 02-12-09

North Wall ConstructionPower Block C 02-12-09

Shelter Being Erected for the 5th Engine FoundationPour for Power Block C. 02-12-09

Afghan Water Truck 02-12-09

Tower Erection 02-08-09

Tower Erection 02-01-09

Tower Erection 02-02-09

Material Air DropAt 100MW Site

Aborted Air Drop Due To Ground Conditions

Golf In Kabul For The Adventurous Type

Local Fruit Stand

Local Village NearSite

Local Vegetable Shop

Local School HouseNear The Site

Local Transport Plenty Of Room

WOW

Recommended