case study
CHEO Foundation Dream Home
www.smartrink.com 1
the clients
The Foundation of the Children’s Hospital of Eastern Ontario (CHEO) hosts a dream home lottery each year. They asked us to design and build a SmartRink™ synthetic ice rink as part of their latest project.
www.smartrink.com 2
why synthetic ice
SmartRink™ synthetic ice offers the excitement of being able to skate inside or outside twelve months of the year.
It was one of the highlightsof this year’s dream home.
www.smartrink.com 3
the challenge
• A tight working space. • Coordinating schedules with trades.• Basement stairs, surrounded by finished walls.• A July heat wave and no air-conditioning.
www.smartrink.com 4
our products
ProFast8000-SG premium synthetic ice.
These jigsaw panels connect with a dovetail jointsystem and are 1 meter x 1 meter in size.
This product includes a dry slip additive and an infused silicon oil glide enhancer, providing a continuous and unmatched glideexperience— for the life of the panel.
www.smartrink.com 5
This system is optimally used with a level concrete surface.
It installs easily and quickly —even in a tight working space.
www.smartrink.com 6
We needed hockey boards that would maximize space and be mobile enough to get down a flight of stairs.
The Prolite series(Omni Sport) was the perfect solution.
www.smartrink.com 9
The Ottawa Senators were involved with the project and provided an image of their fans that served as a mural on the side wall.
www.smartrink.com 8
the result
A fun project. An incredible cause. A happy client.