• Doug Nelson – Executive Director of Development & Construction, UCSF Benioff Children’s Hospital Oakland

• Richard West and Tony Solano – JLL

• Darrel Graef – Project Superintendent, Turner Construction Company

• Ed Walsh and Abhishek Gupta – Turner Construction Company

Welcome

3

UCSF Benioff Children’s Hospital / Turner – General Discussion

Project Communication

Upcoming Construction Activities

Local Business Utilization

Pre-Apprenticeship Programs

Agenda

4

• Project Communication

• Project Communication– Darrel Graef (Turner Supt) 510-764-3059– Flyers and Project Website

• notifications of change to site conditions as it pertains to the neighborhood

• http://chonext100.org

• Concerns/Issue Reporting—Contact information are posted on Site Signage and Project

Website

Communication & Reporting

5

• Finalize west elevation work at MLK garage entrance (Painting, Signage)

• Start constructing temporary barrier walls in OPC 1.• Middle of December is anticipated start for excavation of the OPC2 site

and start working on foundations/drill piers.

Upcoming Major Construction Activities

6

• Garage entrance and exit is now on MLK, old garage entrance for vehicles and pedestrians is closed.

• Waiting for city approval to install new crosswalk from temp ramp to main hospital.

• MLK will be the truck route for off-hauling the excavated dirt.• Interior work inside OPC1 to proceed during off hours.

Construction Logistics

Overall Site Plan

New Garage Logistics

Construction Sequencing

MLK JR Way(Sidewalk Closed)

Phase 2A OPC2 Earthwork/FoundationConstruction Status• Site Excavation• 100% Foundation

Logistics ItemsA. Potential Temporary Bus Stop

Location B. Temporary FenceC. Entrance GateD. Pedestrian Travel RedirectionE. Parking Structure New

EntranceF. Trailer/Laydown

B

C

B

D

A

C

E

F

10

Projected Business Participation*Local Goal = 35% Projected = 44%

Oakland Contractors = 13%Small Contractors = 37%

Minority Contractors = 8%Women Contractors = 1%

*based on actual and expected contract awards to 31 prime subcontractors through September 2015

11

Local Business UtilizationTurner attained a 44% Local business utilization far exceeding the 35% minimum goal as directed by CHO. This was a direct outcome of our extensive outreach efforts which resulted in a total of 247 contractors responding to our outreach efforts (123 submitted bids and 124 declined to submit a bid).

Of the 123 submitted bids:• 45 are Local firms (25 are from Oakland) • 12 are Minority owned firms • 6 are Women owned firms • 12 are Small business firms

12

Questions/Discussion?

13

13Proposed RPP Boundary

RPP Boundary Map

Oakland Children’s Hospital

Oakland Children’s Hospital