Utah Highway Users Fall Meeting

Preview:

DESCRIPTION

UDOT Director Carlos Bracers presented to the Utah Highway Users on September 11, 2013.

Citation preview

Vision for UDOT’s FutureUtah Highways Users | September 11, 2013

Final Four Strategic Goals

Preserve Infrastructure

OptimizeMobility

ZeroFatalities

Strengthen the economy

Integrated TransportationEmphasis Area

CollaborationEmphasis Area

EducationEmphasis Area

TransparencyEmphasis Area

QualityEmphasis Area

Operational ExcellenceEmphasis Area

UDOT’s Core Values

• Innovation• Dedication• Integrity• Public Responsiveness• Passion• Fiscal Responsibility

Future Unified Plan Projects

Phase 1 (to 2020)Phase 2 (2021 to 2030)

Mountain View CorridorUtah County

Future Construction

Salt Lake CountyFunded

Mountain View Corridor

Mountain View Corridor

Southern Parkway

West Davis Corridor

• EIS considered 46 alternatives

• New 20-mile 4-lane highway fromFarmington to Hooper

• Draft EIS is out for public comment until August 23rd

• Will reduce future regional congestion by 60%

• Meets latest air quality standards

• Estimated at $600 million

West Davis Corridor

Recommended Alternative

• Serves more traffic per mile

• A better interchange at I-15/Legacy

• Lower impacts to 4f resources

• Lower impacts to farmlands, APAs

• Lower impacts to residences

• Lower cost

• Most consistent with city plans

Uintah Basin Energy Transportation Study

Potential Production Loss Due to Transportation Constraints

Vision for UDOT’s FutureUtah Highways Users | September 11, 2013

Recommended