Royal Commission in Jubail
RC Contract 098-C58
AZMEEL IN ASSOCIATION WITH
A.ABU NAYYAN & SAUDI TUMPANE
098-C58 EPC of JIC Cooling Plant EHS Report
098-C58
Month: May 2013 Jun 2013Accumulated man-hour: 379860 387770Days worked since project commenced: 689 696Accumulated man-day lost: 0 0Cumulative Accident Frequency Rate: 0 0
Safety is everyone’sResponsibility.
ALL are an important stakeholder !
SAFETY STATISTICS
098-C58
Pre Task Meeting
Pre task meeting for lifting activity Lifting cooling tower components
Safety consideration in Planning Stage – Participation in Pre-work meetings
098-C58
SAFETY INDUCTION TO NEW HIRE
INDUCTIONT
RAINING
Site Specific Safety Induction Current Month
No. of class 06
No. of Attendee 25
098-C58
SAFETY TRAINING
098-C58
Weekly Safety Toolbox Meeting
098-C58
SAFETY & HEALTH & ENVIRONMENTAL ASSURANCE
098-C58
FIRE SAFETY AND FIRE EXTINGUISHER
On lay down and Construction site fire prevention measures are taken with full standard. Fire extinguishers and sand buckets are installed in different areas of work according to their need.
098-C58
FIRE EXTINGUISHER RECORDArea: Laydown office and Construction Site 098-C58
Series No. TYPE BUILDING
No.001-5 POWDER ABC 5Nos of Fire Extinguisher are installed in 1st Azmeel office
No.006-9 POWDER ABC 4Nos of Fire Extinguishers are installed in RC Office
No.010 POWDER ABC With Smoking shelter at laydown area.
No.011 POWDER ABC Water shelter at laydown area
No.012-13 POWDER ABC 2nd Azmeel office (Accounts Section)
No.014 POWDER ABC Near the Toilet area
No.015 POWDER ABC One with Generator area at Laydown
No.016 POWDER ABC In Store main entrance
No.017 POWDER ABC Chemical Store
No.018 POWDER ABC Mosque
No.019 POWDER ABC Smoking Shelter at laydown area
No.020-21 POWDER ABC 2 Nos of Fire Extinguisher with Portable Generators
No.022-25 POWDER ABC Fire Point
098-C58
With Generator With Generator
With Portable GeneratorNear Latrine / Ablution area.
098-C58
098-C58 Project Site Office Entrance 098-C58 Project Site Office Exit
Azmeel Account Office EntranceAzmeel Account Office Exit
098-C58
Fire Point Construction Site Water / Rest Shelter
Smoking area Site Office Water / Rest Shelter Site Office
098-C58
BULLETIN BOARDThere is no doubt that safety in the workplace, legal compliance, and friendly working environments are key elements that employers must continually work to improve. An attractive, well organized safety bulletin board are placed in both construction site and at project office site to promote safety in the workplace.
098-C58
HOUSE KEEPINGWe value Housekeeping and its not just cleanliness. We are maintaining halls and floors free of slip and trip hazards; and removing of waste materials (e.g., paper, cardboard) and other fire hazards from work areas. We pay great attention to important details such as the layout of the whole workplace, aisle marking, the adequacy of storage facilities, and maintenance. Good housekeeping is also a basic part of accident and fire prevention.
098-C58
Good Examples
098-C58
Good Examples
098-C58
Good Examples
098-C58
Good Examples
098-C58
Good Examples
098-C58
Good Examples
098-C58
WASTE MANAGEMENTWe are deeply concerned with waste, our efforts are related to materials produced by human activity, and the process is generally undertaken to reduce their effect on health, the environment. Putting separate skips for different material and space for concrete washout.
098-C58
PEDESTRIAN/WALKWAYSPedestrian /walk ways are installed in both laydown and construction site for employees to lead them from site office / parking area to construction site. Walkways are increased inside the construction site to prevent the man and machine impediment.
098-C58
Thanks for watching!!
THE END
098-C58