Ringer Library Expansion

Preview:

Citation preview

Larry J. Ringer Library Expansion

City Council Workshop December 10, 2015

Ringer Library Expansion

• 2008 General Obligation Bonds• Total Project Budget – $8,385,000• Existing – 16,000 sf• Proposed – Addition of 12,000 sf• Existing Parking – 78 spaces (66 front, 12 back)• Proposed Parking – 145 spaces (111 front, 34

back)

Ringer Library Expansion

• September 2, 2015 – Presented conceptual plan to Library Advisory Board and Friends of the Library

• September 2, 2015 – Presented conceptual plan to the public

• Conceptual plan was completed with input from library staff, public comments, Library Audit Report and architect

Conceptual Site Plan

Conceptual Site Plan

Conceptual Floor Plan

Conceptual Design

Conceptual Design

Recommendation

• We recommend moving forward with final design based on conceptual plans presented

Recommended