View
168
Download
1
Category
Tags:
Preview:
Citation preview
Welcome to CDOTWelcome to CDOTGreater South Loop AssociationGreater South Loop Association
May 17, 2014May 17, 2014y ,y ,
The Honorable Rahm Emanuel, MayorThe Honorable Rahm Emanuel, Mayoryy
Rebekah Scheinfeld, Commissioner, CDOTRebekah Scheinfeld, Commissioner, CDOT
CDOT is the City Department that Oversees
the Public Way in Chicagothe Public Way in Chicago• Streets
• Sidewalks• Sidewalks
• Alleys
Pl• Plazas
• Bridges
• Medians
• Curb and G ttGutter
f• Responsible for most ground-transportation infrastructure — planning, design, construction, maintenance and operationmaintenance and operation
• Annual capital budget: approx. $400 million -$650 million
• Total employees: about 1 000• Total employees: about 1,000
• Projects receive Federal, State and local funding
Public Way Construction
Design, Construction and Maintenance of
y
and Maintenance of
• Streets
• Sidewalks
• Alleys
• Curbs and Gutters
Arterial Resurfacing• Approximately 990 miles of arterial streets in Chicago
• Typical cost for resurfacing 1 mile of arterial: $1,650,000 Includes design, construction and ADA ramps
• Mix of Federal (STP, ARRA), State and local FundsState and local Funds
• Ideally: 40 miles per year
Bridge & Viaduct Construction,
Operation and Maintenance•36 operable
movable bridges
Operation and Maintenance
• More than 300it d b id movable bridges,
more than anyother City in the
city-owned bridgeand viaductstructures
U.S.
Street Signs Pavement Markings• Fabrication
• Installation
• Installation
• Maintenance
• Maintenance
Public Way PermitsPublic Way Permits• Permission for
construction, parades,special events
Public Way Public Way Inspection• Survey public way
conditions, checkpermits
Transit Program• Reconstruction andmodernization of downtown elevateddowntown elevatedand subway railtransit stations
• Reconstruction of asubway station: subway station: $70 million
• 15 Year Transit Station• 15 Year Transit StationProgram: $533 million
BRT in Chicago
Bicycle Program• Chicago is recognized as one of the Chicago is recognized as one of the
most bike-friendly cities in the U.S.
Bike lanes trails and routes – Bike lanes, trails and routes 148 miles of bike lanes241 miles of signed routes42 il f t il42 miles of trails
Bike racks – over 12,000 installed
Outreach and education efforts –Bike Ambassadors
Dearborn Protected Bike Lane
Bike Sharing in ChicagoChi ’ N t T it S t !Chicago’s Newest Transit System!
4 000 bikes @ 400 stations4,000 bikes @ 400 stations
Pedestrian Program
• Design and Construction Crosswalks Crosswalks Traffic Calming Pedestrian Countdown
Sig lSignals
•Education and Awareness Programs
Cooperative Efforts with Chicago Police with Chicago Police Dept
Planter and Median Construction and Maintenance
• More than 85 milesf l d d di iof landscaped medians in
Chicago
• Environmental Benefits: improved air quality reduced temperatures reduced temperatures stormwater management
Freight Program
• Rail CREATE Program
• Trucks Truck route system
• Water • Water Movable Bridges
Streetscapes
• Streetscapesiimproveneighborhoodcommercial districtswith infrastructureupgrades anddecorative elementsdecorative elements
• Community identifiers reflecti hb h d hi t &neighborhood history &
composition
Traffic Calming
“Calms” traffic by Calms traffic by slowing down vehicles, improving pedestrian and bicycling environment.
• Speed HumpsT ffi Ci l• Traffic Circles
• Curb Bump-outs• Cul-de-sacs
Traffic Signals and Street Lights
• Design, install and maintain moreDesign, install and maintain morethan 2,800 signalized intersections
• Install and maintain 200 000 • Install and maintain 200,000 street lights and 67,000 alley lights
•Automated Enforcement Programs Redlight Running Speed EnforcementSpeed Enforcement
CDOT “Green” Initiatives
• Recycled concrete and asphalt
• Permeable pavements Allow stormwater to drain into ground instead Allow stormwater to drain into ground instead
of collecting on hard surfaces
• Landscaped medians/sidewalk planters Trees and plants help clean air and absorb
stormwaterstormwater
• LED traffic signalsmore energy-efficient, longer-lasting
CDOT Green Initiatives
Green Alleys
• Permeable pavements -asphalt, concrete andasphalt, concrete andpavers
• High albedo pavement • High-albedo pavement -reflects sunlight,reducing urban heatisland effect
• Recycled materialsRecycled materials
CDOT Green Initiatives
Other Green Initiatives
• Warm-mix asphalt
• Solar-powered bus shelters
• Streetscapes
• Bike and pedestrian programs• Bike and pedestrian programs Environmentally friendly alternatives
to automobile; help reduce congestionand pollution
CDOT Policy/Legislative Outreach
CDOT works with:
• Elected Officials (U S Congress Illinois General• Elected Officials (U.S. Congress, Illinois GeneralAssembly, County and Local Officials)
• Appointed Officials (USDOT, IDOT, Staff toU.S. Congressional Committees)
• Metropolitan Planning Organization (CMAP)
• Advocacy Organizations
CDOT Policy/Legislative Outreach
Project Funding Needs and Project Funding Needs and Policy & Legislative Objectives
F d l Ag d• Federal Agenda Chicago D.C. Office
• State Agenda Chicago Springfield Officeg p g
• City Agenda City Council and other City Departments
THANK YOU!THANK YOU!
Website Twitter Facebookchicagodot org @CDOTNe s facebook com/CDOTNe swww.chicagodot.org @CDOTNews facebook.com/CDOTNews
Recommended