on the REBO terminal in ENERGY PORT OOSTENDE MARITIME ACCESS & LOGISTIC OPERATIONS
Emmanuël Timmermans
business development manager
2
RENEWABLE ENERGY BASE OOSTENDE
– priority for offshore installation vessels –
- easy access by: airplane; road; railway; helicopter - no locks - loading & unloading - storage area - O&M facilities
3
1 / LOCATION 2 / MARITIME ACCESS 3 / REBO 4/ INFRASTRUCTURE & LOGISTICS 5/ REALISATIONS 6/ O&M
4
5
1/ LOCATION Europe – Belgium – Oostende
BERLIN
MILAN
PARIS
LONDON
270 km
300 km
1000 km
850 km
BRUSSELS
OOSTENDE
900 km ESJBERG
6
1/ LOCATION Belgian sea ports
OOSTENDE
BRUSSELS
ANTWERP
GHENT
HASSELT BRUGES
KORTRIJK
WALLONIE
FLANDERS
ZEEBRUGGE
7
1/ LOCATION windfarms in the North Sea
OOSTENDE
250 km
8
1/ LOCATION
map of the port
- open sea - inner water - railway - highway - airway
COMPLETE INDUSTRIAL AREA IS MULTIMODAL UNLOCKED:
outer port inner port
9
10
2/ MARITIME ACCESS
approach from open sea to port
300 m
270 m
150m (-8,5m TAW)
11
2/ MARITIME ACCESS
approach from open sea to port – harbour wall heads
12
2/ MARITIME ACCESS
approach from open sea to port – widening eastern shore 2015
13
2/ MARITIME ACCESS
approach from open sea to port
Neptune
Length over all (LOA) 60 m
Width 38 m
Maximum draft 3,9 m
accomodation 60 p
14
2/ MARITIME ACCESS
approach from open sea to port Pacific Osprey
Length over all (LOA) 160,9 m
Width 49 m
Minimum draft 5,5 m
Maximum draft 6 m
accomodation 111 p
15
2/ MARITIME ACCESS
Port Control & MRCC: Maritime Rescue & Coordination Centre
16
17
3/ REBO
history
18
3/ REBO
shareholders & goal SHAREHOLDERS Public Private Founded 2012 GOAL 1. Invest in existing and new port infrastructures to attract offshore wind activities. 2. Exploitation of a 15 ha offshore terminal.
Commercial exploitation Port of Oostende
A flagship organisation in the field of civil engineering, construction, hydraulic engineering and restoration
Invest in entrepreneurs, real estate, & infrastructure.
Offshore & Wind Assistance offers a wide range of services including maintenance of offshore installations for wind energy and oil and gas applications, marine logistic services
DEME Blue Energy (DBE) was created to develop wave and tidal energy projects worldwide.
19
3/ REBO
Renewable Energy Base port of Oostende
assembly & storage area with direct access to open sea
assembly & storage area behind the locks
offices & storage
20
3/ REBO
investments REBO invested more than € 15.000.000 (2013 -2014): -> reinforcement of the sea bed along the quays (new jackup vessels)
21
3/ REBO
investments REBO invested more than € 15.000.000 (2013 -2014): -> reinforcement of the sea bed along the quays (new jackup vessels) -> reinforcement > 10 Ha of terminal surfaces (heavy lift capacity: 10 - 20 T/m²)
22
3/ REBO
investments REBO invested more than € 15.000.000 (2013 -2014): -> reinforcement of the sea bed along the quays (new jackup vessels) -> reinforcement > 10 Ha of terminal surfaces (heavy lift capacity: 10 - 20 T/m²) -> invest in real estate (project management and O&M infrastructure)
23
3/ REBO
Wind farms in the North Sea windfarms in the Belgian part of the North Sea
REBO terminal
24
3/ REBO
share holders Belgian wind farms / share holders REBO
25
3/ REBO
• outstanding geographical location
• excellent & immediate access to open sea
• no locks
• 127 ha available in the port of Oostende for renewable energy activities
• quays with a capacity able to handle from 4 T/m² to 20T/m²
• 15 Ha of terminal surfaces (with heavy lift capacity) and with capacity for extension
• priority to offshore wind vessels
summary
26
27
4.1/ INFRASTRUCTURE
gravel reinforced sea bed
28
4.1/ INFRASTRUCTURE
Neptune for C-Power
29
4.1/ INFRASTRUCTURE
RORO pontoons
30
4.1/ INFRASTRUCTURE
Bold Tern – Fred Olsen / HEAVY LIFT QUAY
31
4.1/ INFRASTRUCTURE
Innovation – GeoSea
32
4.1/ INFRASTRUCTURE
Innovation – GeoSea
Port of Aalborg (DK) Project: Westermost Rough Offshore Windfarm (UK)
33
4.1/ INFRASTRUCTURE
> 127 ha dedicated areas for wind farm logistics > 15 Ha of terminal surfaces with heavy lift capacity up to 20 T/m2 > heavy load bearing quays > dedicated pontoons, mooring facilities for workboats, tugboats, crew vessels
summary
34
4.2 / LOGISTICS
Construction & loading of 6 Gravity Base Foundations (GBF)
site Halve Maan – unit weight: 2700 tons
35
4.2 / LOGISTICS
GBF – preparation for loading with Rambiz floating crane
36
4.2 / LOGISTICS
GBF – move on SPMT
37
4.2 / LOGISTICS
GBF – half submerged (weight reduction)
38
4.2 / LOGISTICS
storage for jacket on pontoons
39
prepiles – Flinder Rose unloading
4.2 / LOGISTICS
40
prepiles – storage on quay side
4.2 / LOGISTICS
41
nacelles, 4 hubs, 8 tower sections – pontoon manoeuvering
4.2 / LOGISTICS
42
blades arrival by road (night transport only) (63,5 m long) truck turning into harbour area
4.2 / LOGISTICS
43
blades arrive by ship – unloading blades
4.2 / LOGISTICS
44
arrival & unloading of Alstom Haliade (420 T) – arrival on pontoon square onto the quay
4.2 / LOGISTICS
45
arrival & unloading of Alstom Haliade (420 T) – off it comes
4.2 / LOGISTICS
46
arrival & unloading of Alstom Haliade (420 T) – ready positioned
4.2 / LOGISTICS
47
4.2 / LOGISTICS
spare infield cable Northwind – Jan De Nul – 40 ton
48
4.2 / LOGISTICS
spare infield cable Northwind –Jan De Nul – 40 ton
49
4.2 / LOGISTICS
ready for assembly
50
4.2 / LOGISTICS
Neptune & Goliath in the port
51
4.2 / LOGISTICS
Thor for C-Power
52
4.2 / LOGISTICS
Thor for C-Power
53
4.2 / LOGISTICS
WIND for Belwind
54
4.2 / LOGISTICS
Thor & Wind
55
4.2 / LOGISTICS
quay
56
4.2 / LOGISTICS
Bold Tern
57
4.2 / LOGISTICS
hub with blades on Neptune
58
4.2 / LOGISTICS
positioning in between spuds & towers
59
4.2 / LOGISTICS
Haliade 150 6MW loaded on Bold Tern in floating position
60
4.2 / LOGISTICS
ready to go to sea
61
4.2 / LOGISTICS
passing harbour walls heads
62
4.2 / LOGISTICS
Bold Tern sailing out with haliade 150 6MW
63
4.2 / LOGISTICS
Deme platforms at work
64
4.2 / LOGISTICS
Bold Tern at work
65
66
5/ REALISATIONS
INSTALLATION ZONE
O&M ZONE
67
5/ REALISATIONS
C-Power - Northwind – Belwind I – Alstom
C-Power I, II, III 52 x 6,15 MW Senvion turbine total 325,2 MW
Belwind I 55 x 3 MW Vestas turbine total 165 MW
Northwind 72 x 3 MW Vestas turbine total 216 MW
Belwind I (Alstom test) 1 x 6 MW Haliade 150 turbine total 6 MW
68
69
6/ O&M
new & renovated buildings along the quay
MHI Vestas – Alstom – Parkwind - Geosea
70
new & renovated buildings with direct access to the quay
Falck Safety Services – Cofely – Senvion – OWA – Technum – Flidar – eCoast (sanitary facilities for up to 100 people)
6/ O&M
71
new & renovated buildings with direct access to the quay
Falck Safety Services: training basin & boat landing
6/ O&M
72
new & renovated buildings with direct access to the quay
Falck Safety Services: tower
6/ O&M
73
6/ O&M
heli port
74
6/ O&M
3 pontoons and 1 fixed crane for service vessels
75
6/ O&M
bunkering for service vessels
76
6/ O&M
bunkering for service vessels
77
6/ O&M
3 pontoons and 1 fixed crane for service vessels
78
6/ O&M
6000 movements (2013 - 2014)
79
6/ O&M
Oostende, homebase for …
80
7/ PORT COLLABORATIONS
an international collaboration of sea ports with a focus on offshore wind
– Port of Oostende –
– Port of Ramsgate – Port of Newhaven – Pool Port – – Brunsbuettel Ports – Rendsburg Port –
www.seanergyports.eu
81
SEE YOU SOON www.reboostende.be
82
CONTACT
Rebo
Emmanuël Timmermans Business development manager e.timmermans@reboostende.be www.reboostende.be Address : REBO nv. Slijkensesteenweg 2, 8400 Oostende, Belgium (Europe) Tel : 0032 (0) 59.34.07.51. Mob. : 0032 (0) 475.42.48.85.
Port of Oostende
Paul Gérard General manager Port of Oostende Paul.gerard@portofoostende.be www.portofoostende.be Address : Port of Oostende. Slijkensesteenweg 2, 8400 Oostende, Belgium (Europe) Tel : 0032(0) 59.34.07.11 info@portofoostende.be