Final cv 1 9-2014

Preview:

DESCRIPTION

WELDING ENGINEER/ APPROVED ARAMCO WELDING INSPECTOR.

Citation preview

ENG. Mahmoud ahmed gaber ayead

Welding Engineering/Welding inspector

PersonalInformation's

Certifications C-SWIP 3.1 Certificate No. (38448)

Aramco Approval E-mail to work As A Welding Engineer/Welding

Inspector In Petrorabigh Site (waiting for approval letter)

ASNT Level II in Radiographic Test (RT)

ASNT Level II in ultrasonic Test (UT)

ASNT Level II in Liquid Penetration Test (PT)

ASNT Level II in Magnetic Particles Test (MT)

level I in Heat treatment for steel (Practical And Theoretical)

Basic H2s induction and SCBA course from total safety (L.L.C.) From

U.A.E

OSHA (occupational safety and health administrator)from (AUC)

First Aid Training From EDC

Skills Languages : Arabic (Native Language),English (very

Good)

Operating Systems : Windows 98/XP/7

Software : Microsoft Office(Word, Excel, PowerPoint)

Programming Languages : Visual Basic 6,Fortran

Education University : Suez Canal.

Faculty : Engineering.

Department : Metallurgy and Material Science

Graduation : 73.32 %.

+966583284662 m.ayead@alzamilmetal.com

M_ayad2222@yahoo.com Page 1 of 8

Military service :Exempted

Date of birth :25/7/1983

Nationality :Egyptian (location : KSA, Jeddah).

Driving license : (Egyptian &Saudi)

ProfessionalExperience

A .QC & Welding Engineer/Welding Inspector

In ALZAMIL METAL WORK FACTORY (KSA)(1-1-2013 to till date)

Duties of this Position:

o Checking Material

o Making WPS, PQR

o Training the welders for qualification

o Liaise with third party and various customers for witnessing

welder qualification test and procedure qualifications.

o Monitoring the calibration of welding equipments and

maintaining the records of calibrations.

o Maintaining the welder continuity and update the renewal

qualification records.

o Reviewing the certificates for welding consumables.

o Monitoring the storage, holding, baking and drying of welding

consumables as per company and Saudi ARAMCO

specifications.

o Familiar with different types of materials of construction

which includes Carbon steels, Stainless steels, Low Alloy

Steels and other Corrosion Resistant Alloys.

o Shall be capable of reviewing welding procedures, PMI

Procedures, PWHT & Hardness Procedures.

Preparing weld maps

o Welding Inspection offshore structures and process piping

o Preparation of NDT request, monitoring the execution of NDT

and reviewing reports.

+966583284662 m.ayead@alzamilmetal.com Page 2 of 8

ProfessionalExperience

o Monitoring Pre heating, Inter pass temperature, Post weld heat

treatment and Control & Storage of Welding Consumables

,Perform Hardness testing.

o Interpretation of radiographs for various projects with different

specs and codes.

o Dimensional Survey

o Preparing QC File &NDE Documentations

o Working with codes ASMEIX, II, V, VIII, B31.3, B31.4, API

1104, 650, 653, ASTM etc..

o Familiar with Saudi ARAMCO specifications e.g. 32-SAMSS-

005, SAES-W-017, SAES-W-010, SAES-W-011 etc.

o Preparation of Weld traceability, Test package, Test reports.

o Coordinating Quality Audit and take appropriate corrective

and preventive actions for the closing out the NCR and CAR's

o Maintain and execute equipment calibration & records.

Project :

MAADEN (KSA)

o Construction of 4 storage tanks for maaden company

(Total weight 236 ton, carbon steel, Dia. 24,28,29 &29m)

ALTUKHY (KSA)

o Construction of 3 storage tanks

(Total weight 1498 ton, carbon steel, Dia.31 & 33m)

+966583284662 m.ayead@alzamilmetal.com Page 3 of 8

ProfessionalExperience LUBEREF (KSA) ARAMCO JOB

o Maintenance of 2 storage tanks.

(Replacing of bottom, 3 shell courses and roof, carbon steel)

GSE&C (KSA) ARAMCO JOB

Rabigh II refining and petrochemical project (CP 3,4)

o Construction of 33 SS 304 tanks. (Running)

(Total weight 267 ton, Dia. From 4 – 8m).

HHI (KSA)

o 9 tanks at Jeddah south thermal power plant, carbon steel,

Dia.42 &45 m

o Boiler Air Ducts. (Running)

(Total weight 27714 ton)

PETROFAC (KSA) ARAMCO JOB

Rabigh II refining and petrochemical project (utility, south and north

area)

o Construction of 33 CS storage tanks. (Running)

(Total weight 8900 ton, Dia. From 12m to 45m)

BEMCO (KSA)

+966583284662 m.ayead@alzamilmetal.com Page 4 of 8

ProfessionalExperience ST area condensate receiver A, B, C.

o Construction of 6 pressure vessels. (running)

(Total weight 58 ton, low alloy steel (P4))

EL-SEIF (KSA)

Sand trap box.

o Construction of 256 boxes. (running)

In Alexandria Petroleum Maintenance co.( Petromaint )(1-1- 2007 to 20-12-2012)

Duties of this Position:

o Training the welders for qualification

o Liaise with third party and various customers for witnessing

welder qualification test and procedure qualifications.

o Monitoring the calibration of welding equipments and

maintaining the records of calibrations.

o Maintaining the welder continuity and update the renewal

qualification records.

o Reviewing the certificates for welding consumables.

(Total weight 744 ton, stainless steel 316 (P8))

+966583284662 m.ayead@alzamilmetal.com Page 5 of 8

ProfessionalExperience

o Preparing weld maps

o Welding Inspection of structures and process piping

o Preparation of NDT request, monitoring the execution of NDT

and reviewing reports.

o Monitoring Pre heating, Inter pass temperature, Post weld heat

treatment and Control & Storage of Welding Consumables

,Perform Hardness testing.

o Interpretation of radiographs for various projects with different

specs and codes.

o Dimensional Survey

o Preparing QC File &NDE Documentations

o Working with codes ASMEIX, II, V, VIII, B31.3, B31.4, API

1104, 650, 653, ASTM etc..

o Coordinating Quality Audit and take appropriate corrective and

preventive actions for the closing out the NCR

Project :

SOUTH DABAA

o Fabrication of Fire Water System

o Fabrication Of Pig Launcher System

o Fabrication Of (LTS) Low Temperature Separator System

o Construction of the Gas Plant pipelines, pressure vessels,

manifolds, tanks, steel structures.

AGIBA:

+966583284662 m.ayead@alzamilmetal.com Page 6 of 8

ProfessionalExperience

o Zarif Tanks Piping Network

o Fabrication of 15 Tanks 1000BBL

PETROBEL

o Maintenance & Inspection on Temsah Glycol Regeneration

Unit (GR1&GR2)

o Maintenance Of Tank 28 At Belayim Power Station

o Trunk oil pipeline from 10/1 to feiran terminals

o Fire alarm and fire fighting system at t/b 6-1

GUPCO

o Fabrication of Two Manifolds for Abo Elgharadik Fields

o Fabrication & Erection of flow Pipeline Well head connection

18&32

B. Welding Inspector

In International Company for Industrial Development (DEVCO)

(20-11- 2005 to 20-12- 2006)

+966583284662 m.ayead@alzamilmetal.com Page 7 of 8

Duties:

o Welding Inspection offshore structures and process piping

o Preparation of NDT request, monitoring the execution of NDT

and reviewing reports.

o Monitoring Pre heating, Inter pass temperature, Post weld heat

treatment and Control & Storage of Welding Consumables

o Interpretation of radiographs for various projects with different

specs and codes.

PHARAOH GOLD MINE

o Construction Of All Piping Networks (Diesel Oil, Lube Oil,

Cooling Water, Flare, Heavy Oil Line)

o Construction Of 11 Tanks For Gold Concentration Cycle

EPCC

o Construction of 10” St. St. Pipeline connecting R/O unit to Demine

water area

+966583284662 m.ayead@alzamilmetal.com Page 8 of 8