Updated plans and drawings for the College of the Rockies South Entrance Expansion. The project began in Summer '09. Expected completion for Phase 1 is Sept 2010.

Citation preview

COTR South Expansion Project

Sep

tem

ber

16

, 20

09

Pro

ject

Up

dat

e

Please remember that the construction site is out of bounds.

In emergency situations (i.e. fire alarms) the emergency exit at the south end of the 180 hallway (across from computer lab 184) will be available.

Construction Project Update

Phase One: Construction of new South Entrance• Planned completion by September 2010* (View Construction Schedule)

• Construction Management firm has been hired (Wales McLelland of Burnaby, BC)

• Site Supervisor will arrive Sept 21, 2009

• First public tender (for foundation) was advertised on Sept 15 and will close Sept 24

• Weekly updates will be posted for staff on the Announcements board.

• The public can view updates on our blog: http://cotr-social.cotr.bc.ca/blogs/

Phase Two: Reconfiguration of Existing Office Space• Planned completion by March 2011*

• Phase two will begin upon completion of Phase One

• Office space in the existing Kootenay Hall building will be reconfigured to maximize efficiency. Plans are currently underway and are subject to change.

* Completion dates are our best estimate only and may change as the project progresses

College of the Rockies – Building profile facing south (not showing Summit Hall)

First floor expansion – showing existing building (shaded)

View PDF

Second floor expansion – showing existing building (shaded)

View PDF

Standing at the main entrance (upper level) looking in

Looking towards Reception/Registration area from inside main entrance.

Exterior View South West

Exterior South View

Exterior View South East

Note the skylights along the roofline to bring in natural light

Interior view (upper level) looking out

on July 31 at 1:30pm

Interior view (upper level) looking out

on December 21 at noon

Interior View on Upper LevelLooking towards the exit/entrance . Note the fireplace gathering area.

Interior View 1 - Lower Level

Looking down the hallway from the student lounge. Note skylights above. Hallway is open to upper level.

Interior View 2 - Lower Level

Looking South East (towards exit/entrance) from the student lounge area.