The Art of Project Management

Prepared By

Mona Reda

Agenda

• What is PROJECT

• Traditional Project Management

• Agile Project Management

• Agile Vs. Traditional

• Integration Between Agile & Traditional

10/1/2015 The Art of Project Management 2

What is a

PROJECT?

The Art of Project Management 410/1/2015

Information Technology ProjectsThe Art of Project Management 510/1/2015

Research and development projectsThe Art of Project Management 610/1/2015

Construction projectsThe Art of Project Management 710/1/2015

Community development projects

The Art of Project Management 810/1/2015

Why projects fail ?

The Art of Project Management 910/1/2015

What is your project?

The Art of Project Management 1010/1/2015

The Art of Project Management 1110/1/2015

Project Life Cycle

• Is a methodology that define what you need to do to deliver project deliverables

• Traditional (Predictive)

• Adaptive (Agile)

10/1/2015 The Art of Project Management 12

Traditional Project ManagementPlan Driven (Predictive)

10/1/2015 The Art of Project Management 13

Triple Triangle

10/1/2015 The Art of Project Management 14

Traditional Project Management

Initiation

Planning

Executing

Closing

Mo

nit

ori

ng

& C

on

tro

llin

g

47 Processes

The Art of Project Management 1510/1/2015

Planning Process

Collect Requirements

Define Scope

Create a Work Breakdown Structure WBS

Define and Sequence the Activities

Define Resources

Define Project Duration

Create a Project Schedule

Determine Project Costs and Budget

The Art of Project Management 1710/1/2015

Planning Process (Cont’d)Code Activity Sequenc

eResources Duration Date

FromDate

toCost

A Activity 1 - Man power, machines

B Sub Activity 1 A Man power, materials

C Activity 2 - Machine, materials

D Activity 3 -

E Sub Activity 3 D

F Sub Activity 3 E

G Activity 4 E, C

H Activity 5 G

I Activity 6 HThe Art of Project Management 1810/1/2015

Planning Process (Cont’d)

Code Activity Cost

A Work package 1 4,000

C Work package 2 6,000

D Work package 3 10,000

G Work package 4 8,000

H Work package 5 5,000

I Work package 6 2,000

Total budget 35,000 EGP

The Art of Project Management 1910/1/2015

Coffee Break

Agile Project ManagementValue Driven (Adaptive)

10/1/2015 The Art of Project Management 21

Meaning of Agile

The Art of Project Management 2210/1/2015

What do customers need?

The Art of Project Management 2310/1/2015

Features used

The Art of Project Management 2410/1/2015

Agile Advantages

• Customer Satisfaction

• People interactions

• Customers, developers and testers interaction

• Rapid delivery

• Face-to-Face conversation

• Continuous attention to technical excellence and good design.

• Regular adaptation to changing circumstances.

• Even late changes in requirements are welcomed.

The Art of Project Management 2510/1/2015

Iterative, Incremental Product Development

The Art of Project Management 2610/1/2015

Agile Projects Management

Project chartering

Creating the backlog

Planning releases

Iteration planning

Burn-upsDevelopment

and testingRetrospective

The Art of Project Management 2710/1/2015

Agile Backlog

The Art of Project Management 2810/1/2015

Agile Planning

The Art of Project Management 2910/1/2015

Agile Planning releases

The Art of Project Management 3010/1/2015

Iteration planning

The Art of Project Management 3110/1/2015

Task Board

The Art of Project Management 3210/1/2015

Project Budget

Release Iteration Cost

Release 1 Iteration 1 4,000

Release 1 Iteration 2 6,000

Release 1 Iteration 3 10,000

Release 2 Iteration 1 8,000

Release 2 Iteration 2 5,000

Total budget 33,000 EGP

The Art of Project Management 3310/1/2015

Agile Vs. Traditional

10/1/2015 The Art of Project Management 34

Agile vs. Traditional

Traditional

• Plan Driven

• Scope ,Cost and Time are constant

• A process starts after successful completion of another.

• Failure is measured by delivering project on time and within Budget

Agile

• Change Driven

• Cost and time are constant with changing scope.

• we plan all the time.

• Failure is measure against customer satisfaction

The Art of Project Management 3610/1/2015

Cost of Change

The Art of Project Management 3710/1/2015

Project Management process

Traditional Agile

Initiating Planning ExecutingMonitoring

and controlling

Closing

Integration Between Agile and Traditional

10/1/2015 The Art of Project Management 39

Thanks