Yuval Bachar
Principal Engineer, Global Infrastructure & Strategy at
President, Open19 Foundation
Open19 Foundation
Thank you!
Open19 Foundation
Our mission:
A community based organization for open
source hardware and software
• 6 Founding members, 25 corporate members, over 1500
individuals growing daily
• Open19 project is one of many to come
• Platform to share open hardware and software done differently
• Establishing de-facto Data Center and Edge standards
Why be a member?
• Early access to all documents and technology updates
• Access to a community of like-minded industry experts, all
working with Open19 technology
• Opportunity to contribute to specifications and Foundation
documents
• Participation in the Open19 Marketplace
• Co-marketing opportunities on Open19 Foundation newsletter,
website, and social media channels
• Opportunity to sponsor/exhibit at Open19 Foundation events
Announcing the Open19 Marketplace
Check it out today: https://www.open19.org/marketplace/
Foundation
Project tree - contribution tree
X
Project X initial contribution
Contributor/Owner – Company A
Extension YCompany B
XyOwner Company B
Extension zCompany C
XyzOwner Company C
Xw
Extension wCompany B
Owner Company B
Foundation
Project tree – approval process
X
Project X initial contribution
Contributor/Owner – Company A
Extension YCompany B
XyOwner Company B
Extension zCompany C
XyzOwner Company C
Approved by Board
Xw Owner Company B
Approved by Company A
Approved by Company B
Approved by Company A
Extension wCompany B
Followed by
Approved by Company A
The Open19 Project Technology Update
Brick
Double Wide
Brick
Power Shelf
Brick Cage
Network Switch
Double High
Brick
Platform Building
Blocks– Rack level
Blind mate
400w power cables
Blind mate
100G data cables
Brick Cage
• Passive mechanical
cage
• 12RU and 8RU options
• 2RU modularity– 4x Bricks
– 2x Double High Half Width
– 2x Double wide
– 1x Double High
• Snap-on rear opening
Cabling system
Open19 Data Cables
• 400W per server – 8/12 servers per cable
Open19 Power Cables
• 100G Per server – 8/12 servers per cable
Bricks Form Factors
• Four brick form factors
– Brick (½ wide 1RU)
– Double High Half Width – (2RU)
– Double Wide Brick (1RU)
– Double High Brick (2RU)
• Linear power and data growth
• Self Sustained – EMI & Safety
& cooling
• 100G Blind Mate network
Open19 Switch
• 3.2T Switch
• Dual switch: Data Path &
Management (OOB)
– 50G per server data path
– 1G per server management (optional)
– Console port per server (optional)
• 12v input (no power supplies)
• Up to 8x100G uplinks or local
switching ports
• Broadwell-DE CPU with BMC
• LinkedIn white box design
Open19 Power shelf
• 1RU, 19.2Kw (6x3.2Kw)
• Management via GE port
• Full AC and DC range
• Per server protection and monitoring
• Fully redundant A/B inputs
• Multi-Source for the shelf and modules
Platform Benefits
ANY19” RACK
Any location
DISAGGREGATION
Self sustained servers
EFFICIENT POWER
Single stage 96% power conversation
No server power supplies
LEVERAGE EXISTING SERVERS
Bricks form factor fit most existing motherboards
MULTI-SERVER TIERS
Four form factors
Server IP protection and innovation
FULLY REDUNDANT INFRA
A/B 2N power redundancy
No central controllers
COST EFFECTIVE
Rack level cost reduction
Solution cost savings
SHORT INTEGRATION TIME
5-6x faster rack level integration
About LinkedIn
LinkedIn Platform
members
575M+
Posts per day
2M 40% Y/Y Growth
LinkedIn Infrastructure
Dallas
Miami
Ashburn
Dublin
London
Sao Paulo
Hong Kong
Singapore Sydney
Mumbai
Virginia
Texas
San Jose
Oregon
Singapore Los Angeles
ChicagoFrankfurt
Innovate for Hyperscale
Unlimited Bandwidth
Compute on Demand
Scale Cost Effectively
Programmable Datacenter
LinkedIn Open19 Project Status
LinkedIn Update
• One simple update…
Open19 is in Production!
Build Open19 by the Numbers
• 6K nodes/48K cores within 3
days delivered to production in
only 16 racks floor space
• Infra 75-90 minutes per rack
• 96 servers 15 minutes per rack
• Total ~100 minutes per rack (2
technicians)
• 3 days for a full cluster – 1536
Servers (up to 4 nodes per server)
9x faster deployment
40% CapEx cost savings
50% the power
4x the space density
Why should you adopt Open19?
• Cost saving
• Time to install
• Space savings
• Power savings
• Any location – Minimal tech training
• Path for a fully automated data center
• Edge Optimized
Open19 is in Production!
Open19 Project Eco System • 12RU and 8RU cages – Dual Sourced
• Released to production
• Power and data cables
• Released to production
• Bolt Open19 Switch – Dual sourced
• Released to production
• Open19 Power Shelf – Dual sourced
• Released to production
• Servers – Five sources
• 4 server types in production
• 5 Server types in pre-production state
• 5 committed suppliers
• Additional servers production release 2018-2019
Summary
• Open19 is about defining a common form factor
• Open19 is about community collaboration
• The Open19 community is established now, join us:
• Data center Operators and integrators
• Systems Suppliers
• Components suppliers
Open19 is in Production!
And one more thing…
is happy to announce:
The Open19 platform
is now contributed to the
Open19 Foundation
Yuval Bachar