York River Breakwaters and VIMS Shoreline

Preview:

Citation preview

York River EstuaryYork River Breakwaters including VIMS shoreline g

project 2010

C. Scott Hardaway, Jr.Geologist

Shoreline ErosionShoreline Erosion

Shoreline ErosionShoreline Erosion

Management StrategiesManagement StrategiesBulkheadsBulkheads

RevetmentsManagement StrategiesManagement Strategies

Revetments

RevetmentsManagement StrategiesManagement Strategies

Revetments

StormYorktownYorktown

Storm

Post StormYorktownYorktown

Post Storm

Pre Project 1994YorktownYorktown

Pre-Project, 1994

BreakwatersDesign CriteriaDesign Criteria

Annual Significant Storm Tangential

Beach R/R =0 81

Breakwaters

Storm

Farshore

F t h

gWinds Winds Beach

90°

90°

ROrthogonal

R/R =0.81O

Annual Significant

Fetch

StormFetchFetch

Windows

SMB Output (H&T)RCP WAVE I t

90°

90°

Control Line (R )O

Wave Crest Line

Wave Orthogonal DiffractionPoint Spiral

B hAnnual Storm

Resultant Wave Vectors H&at Site

RCPWAVEBathymetric

Grid

RCP WAVE Input

LB

G

o t

Possible HeadlandAlignment Possible Extentof Headland

pBeachSection

al

Tangent Section

Tang

BW BW

SpiralSection

GB

Mb

L =BW LengthG =Bay GapM =IndentationB =Beach Width

B

B

b

m

Spi ra

angent

Project Upland

Bm

Post ProjectYorktownYorktown

Post Project

Chesapeake Bay Chesapeake Bay Breakwater DataBreakwater Data

BaseBase

Selected Sites

BreakwatersDesign CriteriaDesign Criteria

A'

Breakwaters

A'

Gb

Lb

Xb hB

Base of Bank

MHWTombolo BW

A - A'BW

o

BW

AMb

Tombolo

Gb Breakwater gapXb Distance offshore C breakwater to original MHWMb Maximum bay indentation

BW Breakwater

LCL

To

Base of Bank or Bulkh

Bm

BI

Salie

nt

Mb Maximum bay indentation, C breakwater to MHW

Bl Initial beach width, base to bank to MHWBm Present beach width, base to bank to MHWhb Water depth from bottom to MHW at breakwater

Lb Breakwater crest lengthL

Toe of Beach

Present MHWOrig inal MHW

ulkhead

hb Water depth from bottom to MHW at breakwater

1 0

1.65

1.0

Based on Wind/Wave DirectionRelationshipsRelationships

Unidirectional Wind Wave Climate

Based on Wind/Wave Direction

• Mb:Gb Range: 1:1.6 to 1:2.5; average = 1:1.9

• Lb:GbLb:GbRange: 1:1.5 to 1:2.0; average = 1:1.8

Bimodal Wind Wave ClimateBimodal Wind Wave Climate• Mb:Gb

Range 1:1.0 to 1:1.7; average = 1:1.4Lb:GbLb:GbRange : 1:1.0 to 1:1.5; average = 1:1.2,

Overall Average Mb:Gb = 1:1.65Lb:Gb = 1:1.40

YorktownYorktown19 May 1999

17 Oct 2010YorktownYorktown17 Oct 2010

29 Oct 2010YorktownYorktown29 Oct 2010

29 Oct 2010YorktownYorktown29 Oct 2010

Other York River Other York River BW SitesBW Sites

From Google EarthBW SitesBW Sites

Gloucester Point 1937

Virginia Fisheries Lab 1951

Gloucester Point 1968

VIMS 1965

VIMS bulkhead 1964

VIMS East Jan 1 1978VIMS East Jan 1, 1978

Northeaster April 26 1978Northeaster April 26, 1978

VIMS East Sill July 1980

VIMS EastJan 1984

VIMS West 1983

VIMS West BwsMay 1986

Ferry Pier: Isabel

VIMS East Post Isabel

VIMS East Post Isabel

2003Gloucester Point/VIMSGloucester Point/VIMS

2003

Ernesto: Sept. 1, 2006

Shoreline Management PlanVIMSVIMS

Shoreline Management Plan

2010Gloucester Point/VIMSGloucester Point/VIMS

2010

Pre ProjectVIMSVIMS

Pre-Project

During ConstructionVIMSVIMS

During Construction

During ConstructionVIMSVIMS

During Construction

Post ConstructionVIMSVIMS

Post Construction

VIMS West: 2010VIMS West: 2010

VIMS East: Post-construction: 2010

VIMS East: January 2011VIMS East: January 2011

Summary for York RiverExisting Shore StructuresExisting Shore Structures

Summary for York River

Bulkheads•10.5 miles

Riprap Revetments•14 miles

Breakwater Sites• 21 sites along the York RiverBreakwater Systems s tes a o g t e o e• Minimum site length 300 ft• Maximum site length 3,200 ft

•3.3 miles

• Number of BW units, 102• Number of Bays, 102

Questions?Questions?For Mr. Hardaway

Yorktown, Virginia: York River and Coleman Bridge in background