Workshop on ACC RMR study submitted with 2004 ten year plan
Tucson Electric Power
January 15, 2004
Ed Beck Supervisor Transmission Planning
TEP RMR Workshop Presentation 2
TEP RMR Study
• TEP operates its system to WECC / NERC Level C (N-2) criteria
• Studies for RMR analysis were done to WECC / NERC Level B (N-1) based on Biennial assessment
• Cases used in study developed jointly with APS, SRP, WAPA, SWTC
TEP RMR Workshop Presentation 3
TEP System
• TEP system historically has been voltage stability constrained– Local Var responsive units can be committed in
TEP load area to supply var support and lower imports as necessary
– Automated remedial action scheme that responds to selected single and double contingencies within maximum 0.7 seconds
• In future years we have identified thermal and internal voltage SIL constraints
TEP RMR Workshop Presentation 4
UES System
• This report does not address issues with the UES Santa Cruz County area
• TEP is extensively studying issues in Santa Cruz county as part of a separate study for the Commission
TEP RMR Workshop Presentation 5
Greenlee
Westwing
North Loop
South
TEP Service Area
Vail
500 kV
345 kVIrvington
Voltage
2005 New Facilities2005 New Facilities
Nogales
Tortolita
Saguaro
Winchester (04)
Copper Verde (04)
Gateway Sub (05) Internal 138 kV upgrades
TEP RMR Workshop Presentation 6
Greenlee
Westwing
North Loop
South
TEP Service Area
Vail
500 kV
345 kVIrvington
Voltage
2008 New Facilities2008 New Facilities
Nogales
Tortolita
Saguaro
Pinal West
Internal 138 kV upgrades
TEP RMR Workshop Presentation 7
Greenlee
Westwing
North Loop
South
TEP Service Area
Vail
500 kV
345 kVIrvington
Voltage
2012 New Facilities2012 New Facilities
Nogales
Tortolita
Saguaro
Pinal West to Tortolita
Nogales
Tortolita to South
TEP RMR Workshop Presentation 8
Simultaneous Import Limit
Year SIL
MW
MW
Losses
Total
MW
Critical
Outage
Nature of Constraint
2005 1520 89 1609 Cholla – Sag. 500 kV line
WECC volt. Stability criteria
2008 1470 74 1544 South T2 345/138kV xfmr
Irv/VL 138 kV line limit
2012 1770 116 1886 SPR-VL 345kV line Internal volt. Criteria
TEP RMR Workshop Presentation 9
Peak Load
Year PEAKMW
MWLosses
TotalMW
RMRMW
Critical Outage Nature of Constraint
2005 2000 110 2110 178 South T2 345 / 138 kV Xfmr
Irvington / Vail 138kV line loading limit
2008 2121 99 2220 286 South T2 345 / 138 kV Xfmr
Irvington / Vail 138kV line loading limit
2012 2287 147 2434 119 Tortolita 500/138 Xfmr (#1 or #2)
Remaining Tortolita 500/138 kV Xfmr loading limit
TEP RMR Workshop Presentation 10
MLSC
Year PEAKMW
MWLosses
TotalMW
MWGen.
Critical Outage Nature of Constraint
2005 2420 131 2551 552 South T2 345 / 138 kV Xfmr
Irvington / Vail 138kV line loading limit
2008 2445 110 2555 629 South T2 345 / 138 kV Xfmr
Irvington / Vail 138kV line loading limit
2012 2720 152 2872 659 Tortolita 500/138 Xfmr (#1 or #2)
Remaining Tortolita 500/138 kV Xfmr loading limit
TEP RMR Workshop Presentation 11
Summary – Cost RMRInc. RMR gen. costs
2005 2008 2012
SIL 1600 1550 1850
MLSC 2500 2525 2800
Peak Load 2000 2121 2286
RMR 348 826 385
Annual Cost $68,061 $307,179 $301,885
TEP RMR Workshop Presentation 12
Environmental
RMR Output
SO2 NOx PM CO
2005 30 7,679 230 901
2008 188 48,221 1,508 5,807
2012 21 5,415 162 636
TEP RMR Workshop Presentation 13