Woodbridge High School
Woodbridge SchoolDistrict
Design Development forWoodbridge High School
22 May 2012
Woodbridge High School
Site PlanConcept A
Woodbridge High School
DD Plan• Ground Floor
Design Development
Woodbridge High School
DD Plan• Second Floor
Design Development
Woodbridge High School
The following series of images are intended to indicate the level of detail
associated with current Design Development plans.
We have only presented a small portion of the design sheets.
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
The project is being designed using Building Information Modeling – BIM
• Considered “next generation” of Auto-Cad• 3D virtual building – allows “clash detection”
of trades on paper prior to construction• Clash detection resolution prior to
construction reduces potential for change-orders
Design Development
becomes
The following series of images show some of the detail associated with BIM – virtual 3D
designs
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Design Development
Woodbridge High School
Woodbridge School DistrictProject Cost Summary – up-dated
Building Construction Costs $ 46,597,632
Design & Consulting Fees $ 2,659,269
State, County, Local & Agency Fees $ 1,155,895
FF&E & Technology Equipment $ 1,970,000
Subtotal $ 52,382,795
Total Project Costs $ 52,382,795
Woodbridge School District Budget $ 52,539,700
Total Amount Under / (Over) Budget $ 156,905
Proposed Add Alternates $ 3,000,000
May 22, 2012
Woodbridge High School
Woodbridge School DistrictProject Schedule
Space programming 09/22/11 – 11/16/11
Schematic Designs (30%) 11/11/11 – 01/17/12
Design Development (60%) 12/19/11 – 04/23/12
Construction Documents 03/22/12 – 08/23/12
Bid Pack A (Site Concrete & Steel) 8/20/12
Bid Pack B (Building & Systems) 10/03/12
Funding available $10.5 m 10/2011 (FY-12)
Funding available $21.0 m 10/2012 (FY-13)
Funding available $21.0 m 10/2013 (FY-14)
3/29/12
On sched.
On Schedule
On Schedule
12/11
Woodbridge High School
Recommend the Woodbridge Board of Education approve for continued
design progression, the design development documents, budget
and schedule
Thank you!