WIGOS IMPLEMENTATION AT NATIONAL LEVEL IN CÔTE D’IVOIRE

Daouda KONATEDirecteur de la Météorologie Nationalekonatedaouda71@gmail.com

CG-17 25 May – 12 June 2015Genève Switzerland

*OUTLINE

1.Introduction

2.National Observations Network

3.Implementatin activities

4.Conclusion

1. National Observation Network

Type de stations QTEAutomatic OR

Manualfunction

alComments

SYNOPTIC 16 8 AWS, 8 Manuel 13

CLIMATOLOGICAL/AGROMETEO 22 Manuel 18

RAINFALL 183 Manuel 120

RADIO SOUNDINGS ( ASECNA) 2 2 21 in Abidjan and the 2nd in Man

(West)

Current Network

Type de stations Qte Automatic OR Manual

Partners

SYNOPTIC 6 Automatic University Felix Houphouët Boigny/NMS

CLIMATOLOGICAL 8 Automatic WASCAL project

CLIMATOLOGICAL/AGROMETEO 70 Automatic Ministry of Agriculture /NMS

Projects 2015-2016

1. Observations Network

• • •

• •

synoptic

• climatology

WASCAL stations

Partners network

Main partners domains Number of stations

ASECNA Aviation met 1 AWS, 2 upper air

CNRA (research) Agromet, rainfall 27 agromet

ANADER (national agency for the development of agriculture)

agrometeorology 100 farmers raingauges

CRO (center of research in oceanography)

oceanograghy 9 topography level, 2 buoy, 1 maregraphy, 1 laboratory

IHH (hydrology) hydrology 173 hydrology station

CIAPOL (center of pollution)

air and water quality 85 station for air and sea quality

MINISTRY OF AGRICULTURE

agrometeorology 1 sattellite reception

• •

• •

• • • •

• •

• •

• •

• • • • • • • •

◊ ◊

CMS ASECNACNRACRO

Partners network

2. WIGOS Implementation activities

ACTIVITES MENEES

STATUS

WIGOS/WIS focals points

Focals points WIGOS and WIS designated

Governance of WIGOS

- WIGOS Team created in the NMS with an action plan - National Working Group (W-NWG) established- National Governance Structure (W-NGS) established

Partners Identification

• 8 main partners(hydrology, agriculture, environment, océanography, aviation) have been identified and sensitized

• One form questionnaire information on the network is established and analyzed

• The focus points of the partner structures identified for W-NWG and W-NGS

• Other partners have been identified

WMO Sub Regional workshop on WIGOS (november, 2014 –Abidjan)

• Development of the Regional Implementation Plan• Training of national focal points

Actions Status

Organization of the workshop to launch the national WIGOS Project (16 to 17 December 2014 with the support of WMO)

8 participation of key partners and a WMO expert Each partner presented its network (difficulties,

projects, challenges) The launch of a consultation on the state of art of

stations (MND -PNCC -GIZ) - Choosing a secondment consultantImplementation Plan for WIGOS Ivory Coast has been developedA 2015 work program was adopted for each group

Strengthening of national Observations Network

• Acquisition of 8 (2014)• Mercury barometer have been replaced by electronic

barometer (Minamata Agreement)• Wind systems installed in all stations

MoU with partners to strengthen the network (future)

• 8 stations will be install by WASCAL project• 6 stations (by University)+ 80 stations (by Ministry of

Agriculture)

Reinforcement of Data base system

• Acquisition of CLIDATA system and et CLIMSOFT system (2015)

1st meeting of W-NWG (April 30th, 2015)

• Assessment of the implementation plan • Interministerial legal Act have been elaborated for

WIGOS project • The data based of the 8 main partners have been

presented • Implementation Budget • Others partners identified

Others partners

•CIDT, IVOIRE COTON: partners with some stations in the cotton field• University: in the University, the laboratories of atmosphere research have stations• SAPH: industries in palm oil,•National program of Climate change (PNCC)• MoU Signed with the Maritime Port of Abidjan and maritime Port of San pedro

3. Actions ongoing

• Natonal Wigos Budget

• Identification et sensitization of others partners

• Signing the Interministerial Act

• Hire the consultant for the state of the art of all the

national network

• Standardization process of the network

• Interconnecting of all network (NMS – partners ) -

OSCAR

• Assessment of the network (NMS+partners )

• Linking WIGOS national with GFCS national

THANK YOU

Comments! QUESTIONS?