View
213
Download
1
Category
Preview:
Citation preview
Who is AVEVA
Richard BeckVP – Strategic Projects
AVEVA’s Heritage
Spun out of Cambridge University research unit in 1967
Established Engineering Data Principles
Launched 3D CAD solution in 1976
Privatised in 1983, management buy out in 1994
Name change to AVEVA in 2001
Major product acquisitions from 1998-2002
Autodesk Alliance 2003
Acquired Tribon in 2004
TrustFreedomExcellence
Dominance in High Value Capital Projects
Over 80%Over 80% of all newoffshore projects
70%70% of Chinese powerdesign institutes
27/3027/30 world’s top-quotedchemical companies
On average, an AVEVA-designed ship is launched every day.
AVEVA Focus on Large scale capital project, not low value mass produced products. Dominate a market sector, then apply the
knowledge to the next
AVEVA’s Core Values
Digital Vessel
Two vessels are ALWAYS made:
one in data and one in steel.
The quality of the first is directly proportional to
the success of the second.
Physical Vessel
Woodside’s PLM Solution- North West Shelf Australia
North Rankin AKarratha Gas PlantCossack Pioneer
Goodwyn A
3D Models1850 P&IDs60,000 Isometrics2,200 GAs1250 Layouts250,000 tags520,000 technical attributes11,000,000 Associations23,000 cables750,000 documents
$5 billion USD project$2.5million USD revenue per day6 Globally distributed engineering and fabrication sitesOver 1 million documentsOver 400 P&ID’sOver 100,000 tags200 separate 3D CAD files from different sources3.5 million associations
PLM Solution
Supporting Shipbuilding
StructuralDesign
StructuralDesign
Operate &MaintainOperate &Maintain
ProductionProduction
Re FitRe Fit
Initial DesignInitial Design
DetailDesignDetail
Design
AVEVA delivers• Data security & integrity• Data Centric approach• Change Management• Quality Assurance
Primary factors to maintaining schedule & controlling costs
AVEVA delivers• Data security & integrity• Data Centric approach• Change Management• Quality Assurance
Primary factors to maintaining schedule & controlling costs
AVEVA Provides• An off the shelf Solution for the complete design lifecycle• A Single source of the truth• Configuration Management and change management across sister ships
AVEVA Provides• An off the shelf Solution for the complete design lifecycle• A Single source of the truth• Configuration Management and change management across sister ships
AVEVA only focuses on large scale capital projects, not discrete manufacturing
AVEVA only focuses on large scale capital projects, not discrete manufacturing
Delivering PLM on ConcurrentDesign and Fabrication Projects
Richard BeckVP – Strategic Projects
Shipbuilding business drivers
Pressure on most major shipbuilders to increase productivity and operational efficiency– React to increased market demand– Resist competition from new suppliers with lower
labour costsIncreasing work with partners:– Sub-contractors– Joint venture partners– Design agents
Distributed working– Lower cost manufacturing locations
For established industry leaders, a trend towards more higher value, higher complexity ships:– FPSO– LNG
Shipbuilding IT response strategies
Investment by most major shipbuilders in key IT systems
– Advanced multi-user 3D CAD for design improvement
• Extension from CAD to CAD/CAM– Assembly planning– Production support
– Integrated ERP for manufacturing improvement
• Integration of production management, purchasing and financial accounting
– Production scheduling– Material procurement– Material inventory management– Production management
Additional IT requirements
More data created and managed in design systems– Robust means of organising and
managing information storage and flow
• Version management• Status management
– Automatic connection between design and production systems
Effective working with partners– Information sharing and real time
visualisation and collaboration – Data security, integrity and quality
(change control)
Role of PLM system
Industry comparisons
100’s max1000’s1000’sDesign Collaboration
Production efficiencyDesign safety, Production efficiency
Change Control,Work Mgt
Management Focus
Design, prototype, manufacture
Design, prototype, manufacture
Concurrent design and construction
Development Process
Few (<10) simultaneous, fixed products
Multiple (>10), simultaneous, variantproducts
Multiple (>20), simultaneous, uniqueproducts
Product Nature
Lifecycle of designLifecycle of productLifecycle of productLifecycle
Production management
Project management (design), Production management (manuf)
Integrated design & construction project management
Management Technique
2.5k to 10k150k to 1.5m2.5m to 40mNo of parts
Production Process
Product complexity
Product
Project
Low High
Industry positioning
CapitalEquipment
Automotive
Aerospace
ConsumerGoods
Shipbuilding
Process Plant
Production Process
Product complexity
Product
Project
High
Vendor & technology positioning
(AVEVA Net)
AVEVA
(PDMS & VM 12)
Conventional PDM & PLM Vendors
Low
Role of PLM System
Digital Shipyard Backbone
PLM System
Content MgtChange Mgt Work Mgt
Collaboration Mgt
Integration Mgt
Object Storage& Management
(Platform)
AVEVA’s open PLM solution
ContentChange
Work
Documents
Data
Design Interaction, Collaboration & Visualisation(Desktop)
Design & Production
Systems
Interface Management(Gateways)
CAD / CAM
Web
SpecialistApp’s
Office
Resource Management
Systems
BusinessApp’s
Coordination
ERP
EAM
Project Mgt
Models
Explore&
Search
Search Results
View & Edit
MenusToolbars
Status
GUI & NavigationGUI & Navigation
Three levels of search:– Simple– More Options– Advanced
Multiple criteria LoV on operators
Constraint values with lists
GUI & NavigationGUI & Navigation
In addition:– Searches can be saved
• As shared or personal searches– Security can be added to a search
to prevent access and / or modification
– Full text searching of documents is supported
GUI & NavigationGUI & Navigation
Integration ManagementIntegration Management
Integration with Applications can be Single or Bi-Directional– Security Maintained– Publish to a Neutral Format– Source Application independent
Publishing Event can be triggered:– Automatically if the Source
Application holds approval mechanisms
– Manually upon task, work completion or upon milestone achievement
Application Integration Gateways
CAD IntegrationCAD Integration
Independent viewing without the need to have the source application resident
Intelligent viewing of published information
– 2D CAD (ie: AutoCAD)– 3D CAD (ie: VM , Tribon, etc.)– Drawings & Documents– PDF, MS Office, etc.
Streaming of both 2D and 3D CAD files
Mark-up and Collaboration tools, cannot modify source document within open PLM (security)
History retained for individual review sessions
Security and integrity maintained
3D CAD Integration3D CAD Integration
Direct interaction between VANTAGE Marine and Tribon M3 with ‘open PLM’– Direct access from CAD system to “My Work”– Direct access from CAD system to “Document Numbers”– Automatic updating of Project schedule and progress status
Locking of 3D CAD attributes based on design status– Issued for fabrication– Installed
Status Tribon M3 or VANTAGE Marine models within ‘open PLM’ to reflect:– Procurement status– Fabrication and installation status
Automatically building of commissioning systems and graphically highlighting work-packs.
Tight ERP, SCM Integration– Production scheduling– Material procurement– Material inventory
management– Production management
Integration ManagementIntegration Management
Tight 2D & VM CAD Integration– Bill of Materials– CAD Deliverables– Progress & Status– Design and Assembly Hierarchies
Integration ManagementIntegration Management
Typical Project Integration– ERP System– Document Management System– Planning Systems– Engineering Design Applications– 2D CAD– 3D CAD– Project Control Applications– Operation and Maintenance Apps– Multi-Media– SCM applications– CRM applications
Both Design and Assembly planning hierarchies are imported from VANTAGE Marine and Tribon M3 via CAD gateway,– Materials automatically placed as objects into the ‘open
PLM’ hierarchy.– The Design and Production hierarchies can be versioned
and compared
Baselines are created which can be used to compare differences between the Design and Production BOM’s (ie: has everything been assigned to a Production BOM).
Baselines can be versioned and used to compare design changes.
BOM ManagementBOM Management
Initial data load– Import data from gateway, creates part objects creates
structure associations– Approve data (automatic or trigger approval workflow)– Creates a baseline BOM
BOM ManagementBOM Management
Revised data load– Revised import triggers change process– Approve data (automatic or trigger approval workflow)– Creates a new baseline BOM and maintains BOM history and
audit trail of events
BOM ManagementBOM Management
Component LibraryComponent Library
Component Library– Centralised repository for
component Graphics and attributes
– Capable of displaying individual components both graphically and associated attributes
– Display• Manufacturers documents• Installation procedures• Maintenance manuals• Spare Parts• Certification datasheets• Physical properties
Ease of Reuse across all projects and Companies
Multiple Projects can be established from TemplatesEach Project can have different structureStructures can be copied from one project to anotherOrganisation Structure can be associated with the Project Structure– Responsibilities– Organisation Groups– Item Groups
Structure ManagementStructure Management
Structures and object data can be created manually or imported electronically via gateways eg Tribon, ERP
Structure ManagementStructure Management
Multiple object structures– Physical Breakdown structure– Organisation Breakdown structure– Document Breakdown structure– Geographical structure
Rapid creation using Copy & Paste and Drag & Drop
Concepts– Access definition
• Rights to view / modify data for an object (item, document, task, person etc)
– Permission definition• Rights to carry out a function
– Create– Approve– Checkout– etc
– Levels• Access – object and object attribute level• Permission – function related
– Applying permissions• Individual• Group (Department)• Organisation
Security ManagementSecurity Management
All items and documents can be change controlledConcepts– Items can be defined as change controlled
• Once this is done, the item cannot be changed without official approval via a change order process
Change ManagementChange Management
1. Identify Change2. Raise Change Request within open PLM3. Analyse Impact of Change4. Review and Approve\Reject Change Request5. Trigger Workflow Process to Execute Change
Change ManagementChange Management
DraftChangeRequest
EffectAnalysis
SubmittedObjects
ProposedChangeRequest
ApprovedChangeRequest
Change Review
Execute Change Order
ProposedAffectedObjects
ProposedAffectedObjects
ChangeWorkflow
Production InterfaceProduction Interface
User definable data entry formsIntegration with ERP and planning systemsLinks to Published information (ie: documents & drawings)Links to project management for statusLinks to ‘open PLM’ workflows
open PLM supports multiple projects in a single environment– Can be created from Templates
People and Organisations are assigned to projects and given Roles and Responsibilities based upon Skills
Project Explorer Structures can be individually tailored for each project.– Commercial projects can have a different structure to FPSO’s and Special
Ships
Project PlanningProject Planning
Project PlanningProject Planning
Activity Planning & dependenciesMilestonesProgress MeasurementBaselinesResource allocationResource utilisationProject reporting– Activities– Earned Value– Costs– Resources– User Definable
Project Status Reporting– Approved Documents– Superseded Documents– Planned Documents– Documents undergoing revision– Change Orders– User Definable
Project PlanningProject Planning
All items and document in the system can be workflow managed
Workflow modelling allows any process to be modelled and applied to items or documents
Concepts– Work process definition
• Work process template– Collection tasks in sequence
• Tasks can be serial or parallel• Tasks can be planned / scheduled (date due)• Tasks can be allocated to individuals or groups with
specific responsibilities
Workflow ManagementWorkflow Management
The system includes a work exchange desktop
This allows each user to manage their own work task via work exchange folders– Forthcoming Work– Inbox (automatically updated)– Work in Progress– Work Completed– Delegated Work
The system indicates Work priority and target completion dates, and highlights overdue tasks
Users can choose to Accept and Reject work or delegate work to another person with the same level of roles, responsibility and permissions
Workflow ManagementWorkflow Management
(email & Messaging)
Task Completed
Accept
Delegate
Work in Progress
Status
Reporting
Inbox
Ship Design Collaboration PlatformShip Design Collaboration Platform
Workflow ManagementWorkflow Management
Work ManagementWorkflow Templates Triggered Automatically or Manually
Work ManagementWorkflow Templates Triggered Automatically or Manually
Work Completed
Accept
Delegate
Forthcoming
Work in Progress
Inbox
Task Completed
Accept
Delegate
Forthcoming
Work in Progress
Inbox
Objects
Documents
Drawings
Information Published
Automatically / Manually
Workflow ManagementWorkflow Management
The system can manage all electronic and non-electronic documents– CAD, Office, Picture, Video, Voice, e-mail etc– Paper, Microfiche
It provides standard documentmanagement capabilities including:– Secure vaulting– Document classification– Indexing– Viewing– Rendition– Access control– Versioning– Searching
Document ManagementDocument Management
Plus advanced capabilities– Vault replication (performance and security)– Document transmittals– Distribution matrices– Document distribution (including re-call)– Document copy location (physical location)– Document holder (who has got a document
copy)
Document ManagementDocument Management
– Document to object associations– Document production / revision
requirements– Document status and planning– Document change control– Document templates (behaviour,
control, security and relationships)
AVEVA Summary
Richard BeckVP – Strategic Projects
TrustFreedomExcellence
Headquarters
Other OfficesRepresentative OfficeNavy and\or Navy Projects
30 years in Shipbuilding
80% of the worlds top 50 Shipyards
Local support organisation
Global partner
Experience and Presence
TrustFreedomExcellence
World leading marine 3D solutions
Object centric foundation
Industry standard
Comprehensive set of applications
Open and flexible
Technology leader
TrustFreedomExcellence
Putting the customer first
TRUST– Leading Shipyards and offshore suppliers chose AVEVA as
supplier supporting their core business– Global shipbuilding presence
FREEDOM– Flexible – Open architecture– Support distributed project environment
EXCELENCE– Reliability– Industry standard
TrustFreedomExcellence
Lowering risk for you
In-built Product Data Management supporting the
design and production of single and series vessels
Product Life Cycle Management (PLM) platform to support a
through life strategy for marine assets
PLM solutions for distributed, concurrent
project execution
No 1 in lifecycle solutions for military and commercial shipbuilding
No 1 in commercial shipbuilding
Unrivalled, global track record in process & special shipbuilding
No 1 in highly regulated, data intensive industries
(nuclear, offshore, oil and gas)
World class CAD/CAM solution for commercial and
naval shipbuilding
+ =AVEVA the
lowest risk solutio
n
provider
TRUST
FREEDOM
EXCELLENCE
Recommended