Wai‘ula‘ula Watershed Plan

Preview:

DESCRIPTION

Wai‘ula‘ula Watershed Plan . Background Watershed condition Status of plan. Wai‘ula‘ula watershed. headwaters. Intermittent flow in middle and lower reaches. groundwater seep. Current and future land use. Background on watershed plan. focus on nonpoint pollutants - PowerPoint PPT Presentation

Citation preview

Wai‘ula‘ula Watershed Plan

• Background • Watershed condition• Status of plan

Wai‘ula‘ula watershed

headwaters

Intermittent flow in middle and lower reaches

groundwater seep

Current and future land use

Background on watershed plan ....

• focus on nonpoint pollutants • prerequisite for EPA funding of BMPs• MKSWCD lead agency• Carolyn Stewart

lead writer

Phase 1 of Watershed Management plan

• Describe watershed and threats to water quality

• stream water quality monitored with autosamplers and urban grab samples

• Potential BMPs identified

identified impairments• Waikoloa Stream below Waimea Town

– TN and TP • Wai‘ula‘ula stream just above ocean

– TN• adjacent Pelekane stream

– TSS, TN, TP 2 orders of magnitude above standard• nearshore marine waters

– ammonia and algae

Of concern but not measured– pools in intermittent sections of stream– losses due to streambed infiltration

Potential sediment and nutrient sources• forest• urban and suburban Waimea

– Stormwater runoff– septic tanks

• Lalamilo farm lots• grasslands and scrublands

– fire– overgrazing– feral ungulates

• Coastal resort

Stream after a fire (excessive sedimentation)

Potential sediment and nutrient sources• forest• urban and suburban Waimea

– Stormwater runoff– septic/cesspools tanks

• Lalamilo farm lots• grasslands and scrublands

– fire– overgrazing– feral ungulates

• Coastal resort

Original Plan did not meet EPA 9 elements

• Without the 9 elements there is no EPA 319 funding

• Need a rationale for selection of BMPs

• Currently re-writing plan to meet requirements

EPA 9 elements:What must be done prior to applying for funding

• Identify causes and sources of nonpoint pollutants (data limited)

• Quantify load reductions expected for selected BMPs (methodology not mature – using N-SPECT model)

• Have monitoring plan to evaluate if project is successful

N-SPECT model can (?) evaluate sources and pollutant loads with/without BMPs

Priority BMPs identified in draft plan

• conservation plans for farms• improved fire management• improved grazing management• riparian zone and post-burn

restoration

Proposed administrative BMPs identified in draft plan

• institute overlay district that explicity protects riparian areas

• Low Impact Development Outreach• Obtain cesspool information

Current status

Recommended