FHWA-ID-EIS-06-F ITD Project NH-5110(141), Key No. 9779
US-95 Garwood to Sagle Kootenai and Bonner Counties, Idaho
FINAL ENVIRONMENTAL IMPACT STATEMENT
TECHNICAL REPORT
Wetland Delineation Technical Report – USACE Jurisdictional Determination Letters
908 North Howard Street, Suite 300, Spokane, Washington 99201 Telephone: (509) 327‐8697 Facsimile: (509) 327‐7345
DATE: March 12, 2010 TO: US-95 Garwood to Sagle Project FileFROM: SUBJECT: Wetland Delineation Technical ReportPROJECT: US-95 Garwood to Sagle PROJECT NO: FHWA-ID-EIS-06-F, Key No. 9779COPIES:
The US Army Corps of Engineers completed jurisdictional determinations for each wetland identified in the Draft Environmental Impact Statement (DEIS) Wetland Delineation Technical Report (October, 2005). The Jurisdictional Determination Forms have been added as an addendum to the Wetland Delineation Technical Report and provide the rationale for each of the jurisdictional determinations.