View
265
Download
4
Category
Preview:
Citation preview
UREA AND UREA GRANULATION
CHEMOPROJECT NITROGEN
2
Chemoproject Nitrogen a.s. has been successfully involved since its inception in designing and commissioning urea plants. Already in the year 1970, the first two contracts were awarded by VEB Stickstoffwerk Piesteritz in Germany.
UREAPLANTS
In the early 70’s and ‘80’s, three units with capacity of 1050 MTPD each were designed and successfully put into operation. Subsequently, all the other urea plants followed.
6 plants were designed for production of urea with low biuret content using crystallization technology and urea melt prilling. The other units are standard evaporation-based processes and urea melt, producing either prilled or granulated urea with standard biuret content.
So far, Chemoproject Nitrogen a.s. has engineered and supplied a total of 18 new urea plants, 4 granulation units and 4 urea plant revamping projects. The design capacity of single new plants ranges from 1000 up to 2000 MTPD.
UREA PLANTS
3
CHEMOPROJECT NITROGEN
4
UREA PLANT REVAMPINGSKW/AGROFERT
UREA PLANT REVAMPINGDUSLO/AGROFERT
UREA PLANTS
5
NEW UREA MELT UNITPHOSAGRO, Cherepovets
CHEMOPROJECT NITROGEN
6
NEW UREA GRANULATION UNITNAK AZOT EuroChem
NEW UREA GRANULATION UNITNAK AZOT EuroChem
UREA PLANTS
7
Project name Client Location Process descritpion Scope of work Compl.
Urea solution plant revamp, new urea granulation unit1
Azomures/ Ameropa Romania 900/ 1425 MTPD EPC 2015
Revamp urea wet Duslo/ Agrofert Slovakia
600/ 900 MTPD, including new MP section, new desorption and hydrolysis and new pre-evaporation section
EPC 2014
New urea melt plant PhosAgro Cherepovets Russia 1500 MTPD EP 2012
Revamp of urea plant
Grodno AZOT Belarus1200/ 1400 MTPD and new Urea granulation plant 1200 MTPD
EP 2012
Revamp of urea plant
Duslo/ Agrofert Slovakia600/ 900 MTPD. Basic design project
EP 2012
New urea granulation plant Novomoskovsk II
NAK Azot EuroChem Russia 1400 MTPD EP 2010
New urea granulation plant Novomoskovsk I
NAK Azot EuroChem Russia600/ 900 MTPD. Basic design project
EP 2009
Revamp of urea plant
SPC Shiraz Iran 1500/ 1800 MTPD EP 2005
Revamp of urea plant
SKW/ Agrofert Germany 1050/ 1500 MTPD EP 2004
Urea reconstruction Chemopetrol, a.s. Czech Republic 600 MTPD EP 2001
REFERENCES
UREA PLANT REVAMPINGGrodno AZOT
MA
RK-T
HIN
G.IT
NITROGENCHEMOPROJECT
Network of RepresentativesBrazilChinaEgyptIndiaIndonesiaIranNorth AmericaPakistanRussiaSlovakia
CASALE SASister Company Lugano, Ticino, Switzerlandwww.casale.ch | info@casale.ch
CHEMOPROJECT NITROGEN a.s.Trebohostická 14 100 31 Praha 10 - Czech Republictel +420 261305111 fax +420 274816753 www.chpn.cz | info@chpn.cz
Recommended