Typical phases of a project:

1. Schematic Design

2. Design Development

3. Construction Documents

4. Construction Administration

1) Schematic Design Phase• Image / Branding

1) Schematic Design Phase• Functional work flow

1) Schematic Design Phase• First prototype

1) Schematic Design Phase• Study models

1) Schematic Design Phase• Common design elements for consistency

2) Design Development Phase• Drawing in CAD

2) Design Development Phase• Analyze designs

2) Design Development Phase• Communicate design

3) Construction Documents Phase• Detailed dimensions and specifications

3) Construction Documents Phase• Different layers of information

3) Construction Documents Phase• Coordinate with design engineers

3) Construction Documents Phase• Material / Color selection

4) Construction Administration Phase• Make sure design intent is carried through

Completed Project