Turner International Overview 21Apr 2010.ppt [Read-Only]

Preview:

Citation preview

Turner International2010

Turner International in Vietnam

Hanoi Office JW Marriott Project

HCMC Office

BFT Project

PM/CM Services

Bitexco FinancialTower

Key Facts!68-Story Office Tower w/ 6-story Retail Podium (incl.

Food Court)

!3-story basement under the Podium with 270 car spacesand 160+ motorbike spaces

!Tower height is 262m and includes an observation levelat Floor 47 and restaurant/bar at Floor 48 / 49 andhelipad at Floor 50

!Total built-up area is 93,200m2 with 37,700m2 of officearea and 11,100m2 of retail.

Building Facts

!Office slab-to-slab height = 3.75m

!Office finished floor-to-ceiling = 2.7m

!Podium slab-to-slab height = 5.625m

!Podium finished floor-to-ceiling = 4m

Schedule Milestones

!Structure complete 15 July 2010

!Curtain Wall complete 31 August 2010

!Official Opening date Mid October 2010Level 1 to 28

!All Interior finishes complete 31 December 2010

TowerClose-ups

Design Team!Concept Architect – Carlos Zapata Studio (NY)

!Development Architect – AREP (Paris)

!Local Architect – VNCC (Vietnam)

!Concept Structural Engineer – LERA (NY)

!Development Structural Engineer – PAEC (Manila)

!MEP Engineer – DSA (UK)

!Local MEP Engineer – VNCC (Vietnam)

!Elevator Consultant – Barker Mohandas (USA)

!Life Safety Consultant – VNBT (Vietnam)

!Foundation Consultant – CTFE (Vietnam)

PKG-01PKG-01Piling / D-wall Piling / D-wall

(Delta)- Vietnam(Delta)- Vietnam

PKG-01APKG-01AFoundations / Foundations /

BasementBasement(Delta)- Vietnam(Delta)- Vietnam

PKG-02PKG-02Base BuildingBase Building

(Hyundai)- Korea(Hyundai)- Korea

PKG-02PKG-02Podium Podium

(Hyundai)(Hyundai)

PKG-03 PKG-03 Vertical Trans.Vertical Trans.

(Otis)- USA(Otis)- USA

PKG-04 PKG-04 CurtainwallCurtainwall

((EagonEagon)- Korea)- Korea

PKG-06 PKG-06 TelecomTelecom

To be determinedTo be determined

ContractsPackaging

PKG-05PKG-05Finishes / InteriorsFinishes / Interiors

Prime- BP05A- VietnamPrime- BP05A- VietnamMTIC- BP05B- VietnamMTIC- BP05B- Vietnam

Site Plan

Ham

Nghi street

Ton Duc Thang stre

etN

gu

ye

n H

ue

stre

et

Saigon River

Ho T

ung M

au s

t.

Hai Trieu st.

Ngo Duc Ke st.

Site Plan Close-up

Site Before ClearingNov 2005

April 2008

Oct 2008

December 2008

Mar 2009

June 2009

September 2009

December 2009

March 2010

Podium at Night

Atrium

Helipad Plan

2424

PRIMARY GIRDER

SECONDARY GIRDER

PERIMETER BEAM

Helipad Framing in 3D Model

2525

Who Is Turner?

Turner Construction Office Network - USA

TransportationJustice

Healthcare

Sports

Education

Pharmaceutical

Pharmaceutical

Green Building

Local Turner OfficeLocal Turner Office andMarket Segment National Office

! Founded in 1902 inNew York City

! Nearly 6,000 ActiveEmployees

! 1,500 Active Projects

! Leading Client Base

! Over $9 Billion inAnnual ConstructionVolume

! Only NationwideNetwork of Offices

! Leading Builder inDiverse Markets

Turner InternationalOffice Network and Experience

1965 Hong Kong

•Project Experience in 55 Countries•Active presence in 19 Countries

Turner International: Market Presence!First International Project was in 1965 – Hong Kong

!Work Experience in 55 Countries

!Active presence in 19 Countries

!Manage Construction Volume of US $39.1 B

!Staff of 1,400+ Professionals

*inclusive of Turner International Middle East

Professional Building Services!Program Management

!Project Management

!Construction Management

!Consulting Services

Market Segments

! Advanced Technologies

! Aviation

! Commercial / Mixed – Use

! Convention Centers

! Education / Science

! Government

! Healthcare

! Hotel / Resort

! Interiors

! Manufacturing

! Residential

! Retail

! Sports

How Turner Brings Value!Understanding the local requirements

! Local resources

! Culture

! Regulations

! Owner’s Expectations

!Offer Services based on International Experience! Unparalleled Project Track Record

! Preconstruction / Design Development Management

! Program, Project or Construction Management

! Owner’s Trustworthy Project Manager

!Deliver on Promises! Provide Qualified staff and Management Control System

! Best Commitment of Quality, Time and Cost for Owner’s Project

Project Experience

Project Experience

Turner has built or managed 11 of theworld’s 100 tallest buildings

262m

BitexcoBitexco Financial Tower Financial Tower Ho Chi MinhHo Chi MinhCity, VietnamCity, Vietnam

JW MARRIOTT HANOIHanoi, Vietnam

!Client: Bitexcoland

!Architect: Carlos Zapata Studio

! Location: Hanoi City, Vietnam

!Construction Volume: Confidential

!Completion: 2012 (est.)

! 5 star Hotel

! 450 rooms.

JW MARRIOTT HANOIHanoi, Vietnam

China Central Television New Headquarters(CCTV)

!Client: China State ConstructionEngineering Corporation

!Architect: Office for MetropolitanArchitect (Rem Koolhaus)

! Location: Beijing, China

!Construction Volume: US $600M

!Completion: 2009

!The structure will be built out ofalignment and will deflect to its finaldesign position after construction iscomplete.

Taipei 101!Client: Taipei Financial Center

Corporation

!Architect: C.Y. Lee

! Location: Taipei, Taiwan

!Construction Volume: US $700M

!Completion: 2004

! 508 meters. The Tuned Mass Damperpendulum has a six meter diameter,weighs 660 tonnes and sits at 380mabove the ground.

Federation MultiComplex!Client: J/S Company, Mirax City

!Architect: NPS Tchoban Voss

! Location: Moscow, Russia

!Construction Volume: US $700M

!Completion: 2009

! 354m tall multi-use tower - 63 and 93stories, respectively – stand togetheron a common podium and linkedtogether by sky bridges

Türkiye IsBankasi Headquarters!Turkiye IsBankasi A.S.

!Architect: Swanke Hayden Connell

!Construction Management

! Istanbul, Turkey

!Construction Vol. US $140 M

! 250,000 m2, 177 & 114 m Tall (580& 373 Ft)

! 42-story, & Two 30-story Towers

Government Campus Plaza!UDeCOTT

!DP Architects PTE Limited

!Project Management

!Port of Spain, Trinidad andTobago

!Construction Volume: US $165M

!Office

!A 160,000 sq. m. complexcomprising two 23-story towersand other buildings including retail,an auditorium and office space.

THE AMERICAN HOSPITALDubai, U.A.E.

AGA KHAN HOSPITAL & MEDICALCOLLEGE – Karachi, Pakistan

CHILDREN’S HOSPITAL INPATIENTBUILDING – Boston, Massachusette

!Ministry of Sports!Tarouba, Trinidad and Tobago!Construction Volume: US $44M! 15,000-seat cricket stadium

Brian Lara Cricket Academy

Al Hamra Complex!Client: Al Hamra Real Estate

Company

!Architect: SOM

! Location: Kuwait City, Kuwait

!Construction Volume: US $250M

!Completion: 2010

! 78-story, 415-m tower is anticipatedto bet the tallest building in Kuwaitupon completion

Merrill Lynch!Merrill Lynch

! IA New York

!Preconstruction and ConstructionManagement

!Torres de la Americas, Panama

!Construction Volume: US $50M

! Interior

!Providing budgeting, scheduling,permitting and landlord coordinationas well as site inspections reports andconsultant coordination

Burj Khalifa( Burj Dubai)!Client: EMAAR

!Architect: SOM

! Location: Dubai, United ArabEmirates

!Construction Volume: Confidential

!Completion: 2009

!Opening: 04-Jan-2010

!The worlds tallest building 828m

EMIRATES TOWERS EMIRATES TOWERS DUBAI -DUBAI -U.A.E.U.A.E.

Museum of Islamic Art!Client: Qatar Petroleum / Qatar

Museum Authority

!Architect: I.M. Pei

! Location: Doha, Qatar

!Construction Volume: US $270M

!Completion: 2008

!The 30,600-sq. m museum sits on aman-made island off the cornicheand will house four floors of galleriesas well as an education wingdedicated to teaching visitors andstudents about Islamic art.

Shangri-La Barr Al Jissah Resort & Spa!Client: Zubair Enterprises

!Architect: Wimberly Allison Tong &Goo

! Location: Muscat, Oman

!Construction Volume: US $175M

!Completion: 2006

!Three five-star hotels totaling 680-keys in a complex comprising a spa,the Omani Heritage Village, shops,swimming pools, restaurants and alazy rive. Turner has also been hiredto manage the construction ofadditional residential units.

Emirates Palace Hotel!Client: Conference Palace Hotel

Executive Committee

!Architect: Wimberly Allison Tong andGoo

! Location: Abu Dhabi, United ArabEmirates

!Construction Volume: US $1.5B

!Completion: 2004

! 70+ hectares site built to providelodging for royalty during the GCCcommittee has also played host forcelebrities and leaders from aroundthe world.

Shoreline Apartments!Client: Nakheel

!Architect: ACE

! Location: Dubai, United ArabEmirates

!Construction Volume: US $650M

!Completion: 2006

! 20 luxury apartment buildings, each10 to 12 stories tall, comprising 2,500apartments and 80 two-storypenthouses on the Palm Island.

Palace Gardens!Client: Hirco PLC

!Master Planner: HOK

! Location: Chennai, India

!Construction Volume: US $2B

!Completion: TBD

!The first of a series ofresidential communities,Palace Gardens will comprisenearly three million sq. m ofbuilt-up area in this growingtechnology hotbed that isIndia.

Haworth’s global headquarters, One Haworth Center, Michigan - LEED® Gold

LEED - the Leadership in Energy and Environmental Design

What is Green Building and Sustainability!Green Building - reduce the negative impact of buildings on

the environment and occupants.!Sustainability - allows people to meet their current needs

without compromising the resources available for futuregenerations to meet their future needs.

LEED® Gold

LEED® GoldLEED® Certified LEED® Gold

LEED® Gold

LEED®-EB Platinum

Benefits of Green Building

For the Public and the Owner

Environmental benefits:

! Enhance and protect ecosystemsand biodiversity

! Improve air and water quality! Reduce solid waste! Conserve natural resourcesHealth and community benefits:

! Improve air, thermal, and acousticenvironments

! Enhance occupant and visitorcomfort and health

! Minimize strain on localinfrastructure

! Contribute to overall quality of life

For the Owner

Economic benefits:

! Reduce operating costs! Enhance asset value and profits! Improve employee productivity

and satisfaction! Optimize life-cycle economic

performance

! Enhance Public Image andReputation

Growth of Turner Green Projects andGrowth of Turner Green Projects andLEED Credentialed StaffLEED Credentialed Staff

Credentialed Staffs

Green Projects

Green Project %

TI Services relating to Green Building

!Assignment of a LEED Consultant

!Design and Development Management utilizing

Sustainable Building Practices

!Life Cycle Cost Analysis and Cost Estimating

!Research on Locally Sourced Materials

!Procurement and Contract Management

!Management of Job Site Conditions

!Support Commissioning Activities

Alcoa World HeadquartersAlcoa World HeadquartersPittsburgh, PAPittsburgh, PA

David L. Lawrence Convention CenterDavid L. Lawrence Convention CenterPittsburgh, PAPittsburgh, PA

LEED

® G

old

GenzymeGenzyme Center CenterCambridge, MACambridge, MA

LEED

® G

old

Experimental Media Performing ArtsExperimental Media Performing ArtsCenter at Rensselaer PolytechnicCenter at Rensselaer PolytechnicInstitute, Troy, NYInstitute, Troy, NY

Hearst HeadquartersHearst HeadquartersNew York, NYNew York, NY

The Rose Garden Arena and Rose QuarterThe Rose Garden Arena and Rose QuarterPortland, ORPortland, OR

1180 Peachtree1180 PeachtreeAtlanta, GAAtlanta, GA

LEED

® G

old

!!Building the FutureBuilding the Future

Recommended