Turkish HeERO eCall Pilot Site

Roundtable on 112 in Turkey

27th June 2013

Antalya

Presenter:

Dr. Mustafa SANLI

msanli@aselsan.com.tr

Outline

• What is eCall

• Turkish Pilot Site

• Turkish Pilot Site Project Phases

• Key Performance Indicators

• Expected Outcome

2

What Is eCall • eCall: In case of serious accident

– Creates a voice link between the vehicle and the closest PSAP (Public Safety Access Point) and sends data (Minimum Set of Data -MSD-) using common European standards

– Triggered

• Automatically by the in-vehicle device

• Manually by vehicle occupants

– Builds on the single European emergency number

• MSD includes:

• Time stamp

• Accurate location and direction of driving

• Vehicle identification

• Information about the accident

3

What Is eCall • HeERO addresses the pan-European in-vehicle emergency call

service “eCall”

• The first phase of HeERO (2011-2013): Croatia, The Czech Republic, Finland, Germany, Greece, Italy, The Netherlands, Romania and Sweden

• The second phase of HeERO - HeERO 2 (2013-2014) Belgium, Bulgaria, Denmark, Luxembourg, Spain and Turkey

4

Turkish Pilot Site

5

Antalya 112 PSAP

Data + Voice

Voice

Turkish Pilot Site

6

Turkish Pilot Site Project Phases

• Test phase:

– Aselsan’s test system in Ankara and Turkcell’s test system in İstanbul will be used for eCall tests.

• Implementation phase:

– Integration and field tests will take place in Antalya.

– Existing 112 PSAP in Antalya will be used for pilot implementation.

– Existing PSAP and the planned eCall PSAP will operate separately.

7

Test Phase

• PSAP and MNO testbed installation (Aselsan, Turkcell)

• Interconnection of these testbeds (Türk Telekom)

• MNO eCall flag implementation tests (Turkcell)

• MNO - IVS integration tests (Turkcell, Renault, Tofaş)

– Two types of eCall IVS equipment:

• Civitronic (Renault)

• Magneti Marelli (Tofaş)

8

Test Phase

• PSAP in-band modem procurement (Aselsan)

• Implementation of eCall related infrastructural changes in Aselsan’s PSAP solution (Aselsan)

• Call taker application related works (Aselsan)

• PSAP in-band modem - Aselsan PSAP solution integration tests (Aselsan)

• End-to-End (IVS-MNO-FNO-PSAP) integration tests

9

Implementation Phase

• Interconnection of eCall PSAP and FNO Network (Aselsan, Türk Telekom)

– A new dedeicated ISDN port

• Installation of PSAP hardware into the Antalya eCall PSAP (Aselsan)

– eCall router, PSAP hardware and software installation

• Configuration of MNO’s MSC in Antalya (Turkcell)

10

Implementation Phase

• Installation of IVS equipment in the vehicles (Renault, Tofaş)

– Installations will be done in four vehicles:

• Two vehicles - Civitronic devices

• Two vehicles - Magneti Marelli devices.

– Both Renault and Tofaş will test manual eCalls.

• End-to-End verification tests

11

Key Performance Indicators • Number of manually initiated eCalls

• Success rate of completed eCalls using 112

• Success rate of received and correct MSDs

• Duration until MSD is presented in PSAP

• Success rate of established voice transmissions

• Duration of voice channel blocking

• Success rate of heading information

12

Expected Outcome • With the pilot project, the necessary upgrades for PSAPs and

telecommunication infrastructure will be identified.

• IVS test results will be evaluated by the automotive manufacturers (Renault and Tofaş) in Turkey.

• A plan for a nationwide eCall deployment will be determined according to the pilot results.

13

Thank you

14

Questions?

15

Contact Person: Dr. Mustafa SANLI E-mail : msanli@aselsan.com.tr Tel : +90 (312) 592 14 68