6:30pm Tuesday 10th April 2018
T u n k s PA R k M A s T E R P L A n & P L A n o f M A n A g E M E n T
COMMUNITY WORKSHOP
2Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
AgEndA
6.30 - 6.45 pm Welcome / Introduction
6.45 - 8.00 Addressing key issues - outline of proposals and discussion
8.00 - 8.20 Priorities review and discussion
8.20 - 8.30 Thank you and close
3Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
PRojEcT TiMELinE suMMARy
Stage 1 - Scoping of Issues and Values November 2017
Stage 2 - Potential Options December 2017
Stage 3 - Options Testing April 2018
Finalise draft Master plan / PoM April - May 2018
Public Exhibition of draft Master plan / PoM (42 days) June July 2018
Final Master plan / PoM Aug 2018
uwe are
here
Reviewing and refining draft concept options Dec 2017 - Mar 2018
4Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
PuRPosE of This woRkshoP
To preview and discuss the refined responses to the key issues prior to compilation of the Draft Plan of Management for Public Exhibition
Discussions at the workshop will be considered in the finalisation of the Draft Plan of Management
5Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
VALUESImportant qualities to be protected
Heritage
ManagementDecisions needing
to be made
Environment Visual & character Access Recreation Community
Responding to site issues
Managing use
Legacy for future generations
ParkMaintenance
OUTCOMESManagement objectives for the
values (important qualities)
----
----
----
----
----
----
----
Park improvements
Other ??
PRIORITISED ACTION PLAN
Implementing Council strategy
& policy
COMMUNITY LAND CATEGORISATION
Detailed assessment / investigation of issues and proposals
A BAsis foR MAnAgEMEnT foR ThE PARk
6Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
APPRoAch To kEy issuEs• The plan of management will address a range of day to day aspects of
park management along with the key issues
• The key issues have been identified through consultation and assessment - and are the focus of the community workshop discussions tonight
• Some proposed actions are out of the remit of a plan of management to implement (eg traffic works) so must be coordinated into other programmes for ongoing planning and implementation
• The final plan of management will identify a long term Action Plan for progressive implementation
• There are no funds currently allocated for new park works and so all recommendations will be the subject of future funding
• Actions that involve a design project or major site interventions will be subject to further public consultation
7Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
AddREssing kEy issuEs: TUNKS PARK
1. Transport 2. Pedestrian and cycle access the park3. Parking4. Boat Ramp use5. The Foreshore6. Turf Condition and use7. Bushland and Habitat Management8. Creek Enhancement9. Canopy enhancement and shade10. Amenities / facilities
8Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Travel Plan - Objectives A Travel Plan seeks to bring about a mode shift away from single occupancy car use for journeys to and from a location and increasing the use of active travel modes such as walking, cycling, public transport
Overall objectives of Travel Plan• Promote walking, cycling and public transport use
• Reduce Traffic Congestion
• Reduce Parking Demands
• Improve safety for “active travel modes”
• Improve health and wellbeing
9Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Sustainable Travel Plan - STRATegieSissues Potential Strategies
• Lack of awareness of existing walking, cycling and transport options
• Need to make users aware of new options for getting to parks
1. Development of a Transport Access Guide for each park
2. Increased wayfinding
• Emphasis on vehicle use for accessing parks and open space for sports
• Finite parking capacity
3. Explore a Shuttle Bus service from transport nodes and parking stations to sports facilities
4. Introduce priced parking scheme during peak use times
5. Enforce parking restrictions6. Multi use of trailer parking
10Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Sustainable Travel Plan - STRATegieSissues Potential Strategies
• Discontinous pedestrian access on streets leading to park
• Lack of pedestrian links to park from Lower Cliff Street
7. Improve pedestrian access into park
8. Liaise with Willoughby to explore additional pedestrian connections to park
• Local cycle route does not connect to park
• steep grades can create a barrier to active travel modes (walking / cycling)
9. Connect southern cycle route to park
10. Improve cycle facilities (eg cycle racks) within park
• Impact of on road parking on Brothers Ave on traffic flow
11. Reduce conflict of parking circulation and through access at Brothers Ave
• Lack of safe setdown / pickup location 12. Provision of drop-off and pick-up bays• pinch points to The Boulevarde 13. No change recommended by The NSC
Local Area Traffic Management and Action Plan (Zone 3 – Cammeray)
11Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Transport Access guide
• inform users about the sustainable travel modes available to them
• include a map showing public transport routes and safe walking and/or cycling routes
• routes should also indicate the approximate area around the park within five, ten and fifteen minutes’ walking distance
• information could be presented at the park noticeboard and online (Council’s and sporting groups’ websites
12Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Increased Wayfinding• a significant barrier to active travel is a lack of
knowledge of walking routes and distances• to encourage active travel modes, clear
wayfinding could be installed in local streets to highlight the expected walking distance to the park
• could include images painted on the footpath and/or signage indicating how many minutes’ walk or cycle away the park is.
• can increase visibility of walking and cycling routes to the park, encouraging adoption of these modes while also providing increased driver awareness of these active travel modes
13Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Community Shuttle Bus
• community shuttle services operate in many LGA’s providing access to community facilities
• a Saturday shuttle could operate on a set route from a series of nodes in North Sydney (rail stations, parking stations etc) to the sports fields at Tunks Park, Primrose Park, Cammeray Park
• a further shuttle could serve St Leonards Park, Anderson Park and Waverton Park
• would complement introduction of paid parking scheme for peak times
14Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Introduction of a priced parking scheme• investigate potential for priced parking during peak
usage times
• consider both general parking and boat trailer parking
• consider extension to adjoining streets during peak times to avoid deflection of parking demand to adjoining streets
15Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
Multi use of boat trailer parking• investigate potential for increased car
use of boat trailer parking spaces in peak use times
• formalise bus use of some designated trailer spaces during week days to limit visual impact on park
16Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management & masterplan
DescriptionRev Drawn Chked
1 Preliminary NE AH
Date
16/02/18
North Sydney Council JAN 2018
DATE
Foreshore Park Options- 'offline' carpark' (2)
3485.TP.SK01 B
00 5 10 15 20 25 30 35 40 45 50 m
1:500 @A11:1000 @A3
PRELIM
OPTION 1
TRAnsPoRT / AccEss To ThE PARk
Foreshore access road and offline parking• Brothers avenue realigned to
relocate general vehicle parking to west side
• Maximise visual connections to foreshore
• Parking is “off street” enabling better through flow to Brothers Ave
• drop-off & pickup layby to minimise interruption to through traffic flow
17Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TRAnsPoRT / AccEss To ThE PARk
STRATEGIES DEEMED NOT FEASIBILE AT THIS STAGE
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management
DescriptionRev Drawn Chked
1 Preliminary ES AH
Date
12/07/17
Drainage 3501.SA01
W I L L O U G H B YLGA
N O R T H S Y D N E YLGA
C a m m a r a y
N o r t h b r i d g e
Cliff Avenue
Upper
The Boulevarde
Bro
thers
AveRowlinson Parade
Pine Street
Stra
thalle
n A
ve
Mill
ar
Str
eet
Cliff Avenue
Lower
1. Closure of Brothers Ave
2. One way system to Brothers Ave & Lower Cliff Street
3. Removal of pinch points to The Boulevard and Cliff Street
1.
2.
3.
3.
18Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
quEsTions And coMMEnTs
19Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
PEdEsTRiAn And cycLE MovEMEnT
Improvements and or new access routes from local streets
W I L L O U G H B Y
LGA
N O R T H S Y D N E YLGA
C a m m a r a y
N o r t h b r i d g e
Cliff Avenue
Cliff Avenue
Upper
The Boulevarde
Bro
thers
AveRowlinson Parade
Pine Street
Stra
thalle
n A
ve
Miller St
Lower
Ver
non
St
Curr
aw
ang S
t
TUNKS PARK
West S
t
01
03
02
04
05
07
05
06
06
08
09
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management & masterplan
DescriptionRev Drawn Chked
1 Preliminary NE AH
Date
16/02/18
North Sydney Council JAN 2018
DATE
Pedestrian pathways- potential upgrades
3485.TP.SK031:2000 @A11:4000 @A3
PRELIM
LEGEND
Study area
General Public Footpath links
Unsealed pedestrian track
Existing stepped access
'Goat' track/steps to private properties
Path upgrade/new link
'Goat' track public land
04 Existing stone steps up to north side of Tunks beneath bridge 04 Entrance to steps behind log edging 05 'Goat' track from park edge to private property 05 Stepped path from park edge to private property 06 Rock face at Aqueduct - Where to provide route from Lower
Cliff Ave to Park07 Goat Track from Lower Cliff into the Park
08 Stone steps up to Foreshore Track in Northbridge from Tunks Park
Upgrade Options
1. Provide path connection from cnr Millar St/The Boulevarde into Tunks Park
2. Link Route with new route into park from Lower Cliff Ave
3. Upgrade steps/path route from Currawang St
4. Upgrade/reinstate route from Strathallen Ave beneath bridge on north side.
5. 'Goat' tracks from private properties - Discuss of these with management with Willoughby Council?
6. New pathway route/s from Lower Cliff Avenue
7. Formalise 'Goat' Track?
9. Improve continuity of footpaths on Rowlinson (to be reviewed in conjunction with local street pinchpoints)
01 Existing steps cnr of Miller st/The Boulevarde 01 View from park looking up to cnr of Miller St/The Boulevarde 02 Existing stepped acess to Park from The Boulevarde/Rowlinson Parade 02 Existing stepped acess to top of Aqueduct 02 Existing stepped/path acess from Currawang St to Brothers Ave/Vernon St
potential new access
improve existing access
20Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
PEdEsTRiAn MovEMEnT
Links to Strathallen Ave
• link from cnr of Miller St and The Boulevarde not supported by Councils Environment section
• bushland at this location is a Biodiveristy hotspot of remnant bushland& refuge for wildlife
W I L L O U G H B YLGA
N O R T H S Y D N E YLGA
C a m m a r a y
N o r t h b r i d g e
Cliff Avenue
Cliff Avenue
Upper
The Boulevarde
Bro
thers
AveRowlinson Parade
Pine Street
Stra
thalle
n A
ve
Miller St
Lower
Ver
non
St
Curr
aw
ang S
t
TUNKS PARK
West S
t
01
03
02
04
05
07
05
06
06
08
09
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management & masterplan
DescriptionRev Drawn Chked
1 Preliminary NE AH
Date
16/02/18
North Sydney Council JAN 2018
DATE
Pedestrian pathways- potential upgrades
3485.TP.SK031:2000 @A11:4000 @A3
PRELIM
LEGEND
Study area
General Public Footpath links
Unsealed pedestrian track
Existing stepped access
'Goat' track/steps to private properties
Path upgrade/new link
'Goat' track public land
04 Existing stone steps up to north side of Tunks beneath bridge 04 Entrance to steps behind log edging 05 'Goat' track from park edge to private property 05 Stepped path from park edge to private property 06 Rock face at Aqueduct - Where to provide route from Lower
Cliff Ave to Park07 Goat Track from Lower Cliff into the Park
08 Stone steps up to Foreshore Track in Northbridge from Tunks Park
Upgrade Options
1. Provide path connection from cnr Millar St/The Boulevarde into Tunks Park
2. Link Route with new route into park from Lower Cliff Ave
3. Upgrade steps/path route from Currawang St
4. Upgrade/reinstate route from Strathallen Ave beneath bridge on north side.
5. 'Goat' tracks from private properties - Discuss of these with management with Willoughby Council?
6. New pathway route/s from Lower Cliff Avenue
7. Formalise 'Goat' Track?
9. Improve continuity of footpaths on Rowlinson (to be reviewed in conjunction with local street pinchpoints)
01 Existing steps cnr of Miller st/The Boulevarde 01 View from park looking up to cnr of Miller St/The Boulevarde 02 Existing stepped acess to Park from The Boulevarde/Rowlinson Parade 02 Existing stepped acess to top of Aqueduct 02 Existing stepped/path acess from Currawang St to Brothers Ave/Vernon St
21Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
PEdEsTRiAn MovEMEnT
Links to Strathallen Ave
• Western link adjcacent Strathallen Ave has been used for maintenance access by Willoughby Council. Is very steep terrain and would require Blue Mountains style steps/platforms
• Willoughby will review
22Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
PEdEsTRiAn MovEMEnT
Links from Lower Cliff Street
• Willoughby will consider the other access route options in their preparing the review of the current Reserve Action Plan for Flat Rock Gully
W I L L O U G H B YLGA
N O R T H S Y D N E YLGA
C a m m a r a y
N o r t h b r i d g e
Cliff Avenue
Cliff Avenue
Upper
The Boulevarde
Bro
thers
AveRowlinson Parade
Pine Street
Stra
thalle
n A
ve
Miller St
Lower
Ver
non
St
Curr
aw
ang S
t
TUNKS PARK
West S
t
01
03
02
04
05
07
05
06
06
08
09
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management & masterplan
DescriptionRev Drawn Chked
1 Preliminary NE AH
Date
16/02/18
North Sydney Council JAN 2018
DATE
Pedestrian pathways- potential upgrades
3485.TP.SK031:2000 @A11:4000 @A3
PRELIM
LEGEND
Study area
General Public Footpath links
Unsealed pedestrian track
Existing stepped access
'Goat' track/steps to private properties
Path upgrade/new link
'Goat' track public land
04 Existing stone steps up to north side of Tunks beneath bridge 04 Entrance to steps behind log edging 05 'Goat' track from park edge to private property 05 Stepped path from park edge to private property 06 Rock face at Aqueduct - Where to provide route from Lower
Cliff Ave to Park07 Goat Track from Lower Cliff into the Park
08 Stone steps up to Foreshore Track in Northbridge from Tunks Park
Upgrade Options
1. Provide path connection from cnr Millar St/The Boulevarde into Tunks Park
2. Link Route with new route into park from Lower Cliff Ave
3. Upgrade steps/path route from Currawang St
4. Upgrade/reinstate route from Strathallen Ave beneath bridge on north side.
5. 'Goat' tracks from private properties - Discuss of these with management with Willoughby Council?
6. New pathway route/s from Lower Cliff Avenue
7. Formalise 'Goat' Track?
9. Improve continuity of footpaths on Rowlinson (to be reviewed in conjunction with local street pinchpoints)
01 Existing steps cnr of Miller st/The Boulevarde 01 View from park looking up to cnr of Miller St/The Boulevarde 02 Existing stepped acess to Park from The Boulevarde/Rowlinson Parade 02 Existing stepped acess to top of Aqueduct 02 Existing stepped/path acess from Currawang St to Brothers Ave/Vernon St
23Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
cycLE MovEMEnT
Improvements and or new access routes from local streets
North Sydney Council c/o Environmental Partnership 16 March 2018 Travel Plan 171071
Taylor Thomson Whitting (NSW) Pty Ltd 28 © 2018 Taylor Thomson Whitting
of buses. This would reduce traffic volumes and parking demand, while increasing safety for those already travelling to the park by bus.
Conversion of existing parking into a bus layover or drop off area would reduce the parking supply provided within the park.
6.1.9 Expansion of On Road Bicycle Routes
There is an existing on road bicycle route along The Boulevarde, Rowlison Parade, Currawang Street and Pine Street East (refer to Section 2.4.1). This on road bicycle path does not fully extend to Tunks Park, which may deter cyclists from travelling to the park.
Vernon Street and Brothers Avenue could be included within the bicycle network by installation of an on road marked cycle path. This would alert drivers to expect bicycle riders and increase cyclists’ safety during travel to and from the park.
There is a risk that the significant grades would still discourage cyclists from adopting this mode of travel to the park. The nature of the existing roads is already bicycle friendly, with low travel speeds and narrow carriageways.
The provision of a separated uphill bicycle lane is not considered appropriate as there would be insufficient vehicle volumes to warrant the significant costs and impact to on street parking. Further, the current narrow street conditions result in a safer condition for cyclists as vehicles are required to travel at lower speeds.
Figure 6.1: Extension of Bicycle Routes
6.2 Resolving Existing Issues While the focus and objective of this Travel Plan is to propose strategies to encourage sustainable travel modes, there are existing problems within the travel network that could be improved through adjustments to the existing situation.
6.2.1 Introduce Part Time Parking Restrictions
To assist in providing for the parking demand, parking restrictions could be applied at locations near to the park. These parking restrictions would be implemented largely to prevent vehicles from being parked overnight or stored in unrestricted parking areas. To fully implement these restrictions, parking management would be required by Council including monitoring of vehicles to ensure no parking infringements are occurring.
• extend cycle access marked route from Rowlinson Pde
• provide cycle parking within foreshore park area and main park area
24Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
quEsTions And coMMEnTs
25Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
PARking
• Seek to reduce peak use parking demand
• Investigate introduction of pay parking scheme for general park parking at peak times (winter Saturdays)
• Investigate introduction of pay parking scheme for boat parking to carpark on weekends
26Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
boatramp - rmS regulationS
BoAT RAMP
enforcement
• Improve existing regulatory signage related to noise and realted penalties
• Council Rangers to enforce regulations relating to boat ramp use
• Council Rangers to follow up on resident reports
• At this stage security cameras are not supported by Council
27Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
quEsTions And coMMEnTs
28Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
ThE foREshoRE
Openspace
• realignment of Brothers Avenue
• repositioning of parking area
Outcomes
• improved traffic flow
• carparking numbers retained
• allows increased foreshore park space
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management & masterplan
DescriptionRev Drawn Chked
1 Preliminary NE AH
Date
16/02/18
North Sydney Council JAN 2018
DATE
Foreshore Park Options- 'offline' carpark' (2)
3485.TP.SK01 B
00 5 10 15 20 25 30 35 40 45 50 m
1:500 @A11:1000 @A3
PRELIM
OPTION 1
29Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
ThE foREshoRE
Open space improvements
• increased foreshore open space (+65%)
• improved visual links to foreshore
• safer pedestrian access
• potential access to water (stepped seawall / deck edge)
• childrens natural play
• improved picnic facilities
• review recent foreshore tree planting as part of foreshore open space enhancements
update plan
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management & masterplan
DescriptionRev Drawn Chked
1 Preliminary NE AH
Date
16/02/18
North Sydney Council JAN 2018
DATE
Foreshore Park Options- 'offline' carpark' (2)
3485.TP.SK01 B
00 5 10 15 20 25 30 35 40 45 50 m
1:500 @A11:1000 @A3
PRELIM
OPTION 1
30Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
quEsTions And coMMEnTs
31Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
TuRf condiTion & usE
There are a number of areas susceptible to wear:
• along the north edge of park near edges to fields
• at the Aqueduct structure
Strategies to include:
• seek to improve drainage
• improved soil conditions in off season
• potential to provide low key crushed sandstone walking route near bushland edge for dog walkers / joggers
32Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
gAME dAy schEduLing
Changes on Saturday game days
• In 2017, 3 of the 9 mini fields within footfall field 1 were removed to help mitigate traffic and parking issues.
• In addition, games were spread from 8am-11am to 8am – 12pm to allow for staggering.
• It has been estimated that this arrangement resulted in 44 less players her hour for the peak period
• Further reduction in bookings is not considered feasible at this stage as nieghbouring sportsfields are at full capacity
Tunks Park Mini Fields – Saturdays for Winter Season 2017
• Remove the 3 fields highlighted in Red. • Currently the fields run games from 8am-11am. The proposal is to run from 8am -12pm staggering the games • This will result in 44 less players per hour, plus relatives. At a guess this might be 50 – 60 cars.
implemented in 2017• Removal of the highlighted mini fields• Spreading out and staggering of games from 8am-12pm (was 8am-11am)• Resulted in an estimated 44 less players per hour plus relatives - potentially 50-60 vehicles
33Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
quEsTions And coMMEnTs
34Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
BushLAnd And hABiTAT MAnAgEMEnTBushland management is to be undertaken in accordance with Council’s Generic Bushland Plan of Management.
This includes:
• weeds and noxious weed control
• private garden escapees/ bushland edges
• pet management
• managing impact at sportsfield and bushland edges
• terrestrial fauna and bird habitat enhancement
35Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
fLATRock cREEk EnhAncEMEnT• It has been resolved that the benefits
of “daylighting” the creek currently in culverts would not justify the significant costs
• more beneficial to focus improvements and funding opportunities on the existing creek corridor- to manage weeds, rehabilitation and
revegetation - improve water quality- small improvements to the fish weir- edge habitat enhancements
36Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
cAnoPy EnhAncEMEnT And shAdE
• provide tree canopy links across park between bushland areas (as recommended in Tunks Park Fauna Rehabilitation Plans 2003)
• intermittent native grass under storey layer to enhance habitat and ground level movement
• integrate natural play environments / elements that can extend through park
• enhanced shade through park
• review recent foreshore tree planting as part of foreshore open space enhancements
37Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
cAnoPy EnhAncEMEnT And shAdE
CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management
DescriptionRev Drawn Chked
1 Preliminary ES AH
Date
12/07/17
JULY 2017
DATE
Canopy 3501.SA01
38Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
quEsTions And coMMEnTs
39Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
AMEnTiEs BuiLdings
• Council is currently undertaking an audit of all it’s buildings in parks
• This will determine internal improvements required for compliance and provisions for sports and general park users
40Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
cricket nets
•HoweverthePOMprocesshasbeenunabletodetermineanacceptablelocationdueto:
- localresidentconcernaboutnoise(all)
- provisionofrun-in(3)- distancefromparking(5,6)- impactoffencingoncirculation(1)
JULY 2017
DATE CLIENT PROJECT DRAWINGSCALE
ISSUE
1
N
TITLE
Tunks Parkplan of management
DescriptionRev Drawn Chked
1 Preliminary ES AH
Date
12/07/17
WINTER/SUMMER SPORTSFIELD LAYOUT
3501.SA01
wouldrequireadditionalfencing/nettingadjacent
1
2
3
45
6
•Councilhassoughttoprovideadditionalcricketfacilities,suchaspracticenets,atsportsgroundswherebothjuniorandseniorcricketisheld
41Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
quEsTions And coMMEnTs
42Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
whERE To fRoM hERE
Online portal plus Display and Discussion Sessions (on-site) April 2018
Draft POM and Master plan prepared and finalised April/May 2018
Public Exhibition of Draft POM and Master plan (42 days) May/June 2018
Final POM and Master plan June 2018
43Tunks Park - MASTERPLAN AND PLAN of MANAgEMENT
community WoRKSHoPS – April 2018
ThAnk you And cLosE