Tree planting in the London Road public realm area. · Underbridge towards Acton’s Farm...

Preview:

Citation preview

Tree planting in the London Road public

realm area.

Specimen trees planted around Swales

1, 2 and 3.

Tree planting underway adjacent to the

London Road junction.

Elva Way mini roundabout completely

removed, verge reinstated and noise

barrier installed.

Last section of sub base prepared for

blacktop laying. Elva Way in the

background.

Looking east from Glovers Roundabout

towards Acton’s Bridge.

Topsoiling the side slopes around

Glovers Roundabout.

Glovers Roundabout – Entrance to the

Enterprise Park. Glovers House in the

background.

Glovers Roundabout looking towards

Glovers Bridge.

Planting mature saplings around

Glovers Roundabout.

Railway cutting looking towards Glovers

Bridge. Finishing works underway.

Looking east across Combe Haven

Underbridge towards Acton’s Farm

Overbridge.

Looking east towards Acton’s Farm

Overbridge. Seeded verges are

springing to life.

Acton’s Farm to Watermill greenway –

Surfacing of pedestrian/cycle route

commenced.

Looking across the planted landscape

mounding towards Pond H1.

Looking east across Watermill

Underbridge.

Looking east towards Hillcroft Farm

Overbridge from Watermill Underbridge.

Looking west from Watermill

Underbridge.

Hillcroft Farm Overbridge looking

towards Adam’s Farm Overbridge.

Powdermill Underbridge looking east towards

Adam’s Farm Overbridge. Safety and

environmental barrier finishing works underway.

Powdermill Underbridge – Highway

drainage being installed through steel

ducts slung off the bridge deck.

Looking west through Adam’s cut

towards Adam’s Farm Overbridge.

Looking east across Decoy Pond

Underbridge towards Chapel Wood cut.

Decoy Pond Underbridge – Safety and

environmental barrier works underway.

Pond H6 in operation

near Decoy stream.

Greenway Bridge G05 – Abutment tie-in

and access track crossover slabs

completed.

Looking east along the climbing lane

towards Upper Wilting.

Finishing works underway approaching

Crowhurst Road Underbridge from the

west.

Railway Underbridge looking east

towards Queensway. Safety barrier and

landscape planting underway.

Interface between safety barrier and

environmental barrier at Railway Bridge

– awaiting special bracketry for infill.

Queensway cutting looking east

towards the Queensway Junction.

Landscape planting underway.

Greenway tie-in works at the Upper

Wilting Farm entrance off Crowhurst

Road.