Title V Site Operating Permits (SOPs)

Carolyn Maus, P.E.Air Permits Division

Texas Commission on Environmental Quality

Environmental Trade Fair 2015

Why Title V?

How is the initial application reviewed?

What are the other application types?

Is there public input?

How is EPA involved?

Why Title V?

Why Title V?

•Title V permit needed

Major source

Affected source

category

•How is the initial application reviewed?

Initial ApplicationBasic Info.

• Due before site operation begins or 12 months after TCEQ/EPA action

• All site-wide and unit requirements

• Public notice and EPA review

Initial ApplicationWhat’s in it?

• Area map, plot plan, process information

• Forms with detailed site information

• PM/CAM

• Compliance status

• Certification

Initial ApplicationPreliminary Review

Completeness

Company/Site Info.

Site Operations

Introduction

Initial ApplicationTechnical Review

• 30 TAC Chapter 106/116 permits

• Major NSR Summary Table:

PSD/NA permits

Emission points in the MAERT

Monitoring/testing, recordkeeping, reporting

Initial ApplicationMajor NSR Summary Table

AIR CONTAMINANTS DATA

Emission Point No. (1)

Source Name (2)

Air Contaminant Name (3)

Emission Rates *

Monitoring and Testing Requirements

Recordkeeping Requirements

Reporting Requirements

lb/hr TPY** Special Condition

Special Condition

Special Condition

TK-1 Tank VOC 2.5 0.24 5, 6 5, 7 5, 7, 8

Contents of current MAERT

Special Condition numbers with requirements for the EPN

Initial ApplicationTechnical Review

Site-wide requiremen

ts• OP-REQ1

Unit-specific

requirements

• OP-SUM• OP-UA

Negative applicabilit

y• OP-REQ2

Initial ApplicationNegative Applicability

Lacks information

Shows that all exemption criteria are met

Initial ApplicationMore Technical Review

Compliance

• OP-ACPS• Compliance History

Review

PM/CAM • OP-MON

Initial ApplicationPeriodic

Monitoring• Does the rule contain sufficient

monitoring?

• Does it have sufficient monitoring frequency?

•If you answered No at least once, you’ll need PM.

Initial ApplicationCompliance Assurance

Monitoring•

Emission Limit

Control Device

Pre-control ≥ major

CAM applies!

Initial ApplicationResolving Deficiencies

The permit reviewer will:

• Send a list of deficiencies

• Review applicant responses

• Request additional information if needed

Initial ApplicationWorking Draft Permit

The applicant will:

• Submit comments within 30 days

• Legibly mark changes on forms or draft

• Clearly indicate new, revised, and deleted data

• Certify updates prior to public notice

What are the other application types?

SOP Renewals

SOP RenewalTimeline

Permit

issued

Permit expiratio

n

Five year permit term (unless otherwise

noted)

TCEQ sendsrenewal

notification

Application due(6-18 months before

expiration)

SOP RenewalApplication

• Update all requirements

• Evaluate PM/CAM for all units

• Certify compliance status

• Public notice and EPA review

SOP Revisions and Notifications

SOP Revisionsand Notifications

• Reviewed by:

TCEQ

EPA

The public

• Purpose is to maintain current applicable requirements

Notifications

•••

What is a notificatio

n?Can I use

a notificatio

n?

When should I

submit my notification

?

Notification Types

Off-permit changes:• Add applicable requirements from site

changes• New unit• New PBR/standard permit

Operational flexibility:• Remove unit• Modify applicable requirements• Decrease NSR emission limits.

Off-permit changes

• Add applicable requirements from site changes

• New unit• New

PBR/standard permit

Operational flexibility

• Remove unit• Modify

applicable requirements

• Decrease NSR emission limits

SOP RevisionsTypes

• Administrative

• Minor

• Significant

SOP RevisionsApplication

• Describe each change

• Identify affected emission units

• Use appropriate TCEQ forms

Administrative Revision

What changes?

When is it due?

Procedures?

30 TAC §122.211

30 days after anniversary

Operate before issuance; No public notice/EPA review

Minor Revision

What changes?

When is it due?

Procedures?

30 TAC §122.215

Before operation

Operate before issuance; Public announcement/EPA

review

Significant Revision

What changes?

When is it due?

Procedures?

30 TAC §122.219

Before operation

Operate after issuance; Public notice/EPA review

Is there public input?

Public Notice

Applicant Tasks

Post Signs

PublishNotice

PublicViewing

SubmitForms

How is EPA involved?

EPA Review

• 45-day review period

• Concurrent with public notice/announcement

• Stops if comments are received:

Begins again after comments are addressed

Final State Action

After EPA review:

• TCEQ issues permit

• 60-day public petition period:

EPA may receive valid petition

TCEQ resolves objections

Permit may be modified

Submitting Applications to TCEQ

TCEQ

APIRT, MC 161

P.O. Box 13087

Austin, TX 78711-3087

Mail a copy of all applications to the appropriate TCEQ regional office.

Submitting Updates to Applications Under Review

[Name of Assigned Permit Reviewer]

TCEQ

Air Permits Division, MC 163

P.O. Box 13087

Austin, TX 78711-3087

Mail a copy of all updates to the appropriate TCEQ regional office.

Submitting Info. to EPA Region 6

Air Permits Section (6PD-R)

EPA, Region 6

1445 Ross Avenue, Suite 1200

Dallas, Texas 75202-2733

• Send all applications on a CD

• Send all application updates to: R6AirPermits@EPA.gov

• Identify the permit number

Questions?