ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges...

Preview:

Citation preview

Th

yssen

Kru

pp

Permanent Bridges

Elevated steel constructions andStadium roofs

System Bridges(auxiliary bridges)

Architectural buildings,Turn-key constructions,Shopping-Centers,Central-Stations

Our Production range

Hydraulic steel structures and conveyor systems

Th

yssen

Kru

pp

Linking continents - by train across the Suez Canal The El-Ferdan Bridge, the largest swing bridge in the world

Longest swing bridge in the world

Breaking span 340 m

Swinging weight 13,200 tons

Opening November 2001

Th

yssen

Kru

pp

River railway bridges

Technical Data bridge over the river Rhine

Length: 274 mSpan length: 3 x 91.30 mHeigth: 20.00 mSteel construction: 2,650 tonsConstruction time: 23 months

Technical Data bridge over the river Elbe

Length: 240 mSpan length:66.9/105.8/66.9 m Heigth: 17.75 mSteel construction: 2,700 tonsConstruction time: 8 months

Th

yssen

Kru

pp

River road bridgesOver the Askerø-Fjord, Sweden and the river Saale by Beesedau

Technical Data Askerø-Fjord, Sweden

Length steel bridge: 386 mPylon height:: 100 mSteel construction: 2,191 tonsRopes: 313 tonsConstruction time: 8 months

Technical Data bridge across the river Saale

Length steel bridge: 311 mWidth of arch: 180 mHeight of arch: 38 mSteel construction: 4,400 tonsConstruction time: 31 months

Th

yssen

Kru

pp

The Transrapid – Project in Shanghai We manufactured and supplied points and actuators for the line between Pudong Airport and the Centre of Shanghai.

Th

yssen

Kru

pp

The Transrapid – Project in Shanghai

Th

yssen

Kru

pp

The Transrapid – Project in Shanghai We manufactured and supplied eight switches for the line between Pudong airport and the Shanghai city centre

Th

yssen

Kru

pp

Messe Hannover Conference CenterAn internationally significant steel construction „made in Hannover“

Technical Data

Steel construction: 4,500 tonsTotal length steel construction: 170 mConstruction time: 13 monthsEuropean Steel Construction Award 1991

Th

yssen

Kru

pp

Messe Hannover Exhibition hall 8/9A new dimension in exhibition hall construction

Exhibition Hall 8/9, Hannover

Length: 238 mWidth: 135 mCovered area: 32,000 m²Steel construction: 2,400 tonsConstruction time: 12 months

Exhibition Hall 6, Düsseldorf

Dimensions: 165 m x 165 mPrimary framework: 1,500 tonsSpace frame + cable subsupport: 790 tonsConstruction time: 14 months

Th

yssen

Kru

pp

The „AufSchalke“ Arena (Veltins-Arena)The most modern event centre in Europe

Technical data roof construction

Free span area: 226 m x 186 mWeight fixed roof construction: 3,500 tonsWeight moving roof panel: 560 tonsConstruction time: 10 months

Th

yssen

Kru

pp

The new Soccer Worldcup Stadium for Hannover

Modernization of existing Arena for 2006 World Cup

Capacity: 50,000 spectatorsNew roof with trapezoidal steel and membrane constructionOrder: September 2002Completion: September 2004

Th

yssen

Kru

pp

Volkswagen AutoStadt - Vehicle towersMultistorey parking platforms

Technical Data

Heigth: 50 mDiameter: 28 mCars to be stored: 400 each towerGlass area: 8,800 m²Walled-in space: 99,300 m³Construction time: 18 months

Th

yssen

Kru

pp

Materials handling and systems -1 For more than 30 years we have been a relaible and competent partner in the field of internal stock goods handling.

Th

yssen

Kru

pp

Materials handling and systems -2 Power + Free conveyors – sort, collect, store and distribute with one system.

Recommended