View
213
Download
0
Category
Preview:
Citation preview
THEMIS/GBO CDR Peer Review 1 Univ. of Calgary, Apr. 26-27, 2004
Ground Based Observatories (GBO)MCDR
Stewart Harris
THEMIS/GBO CDR Peer Review 2 Univ. of Calgary, Apr. 26-27, 2004
Approach to System I&T
Lab testing where necessary and possible• For instance, testing of temperature limits on cameras
• Cold limit testing on commercial components
Get in the field early and often• Establish network of GBOs well before satellites launched
• Prototype to be deployed winter ’03-’04– ASI deployed with OSE in Calgary late Feb.– CSE deployed in Athabasca mid-Apr– GMAG (E/PO type) deployed in Athabasca mid-Apr
Original Deployment Schedule• 5 Units to be deployed by winter ’04-05
• Additional 15 Units deployed by winter ’05-06
THEMIS/GBO CDR Peer Review 3 Univ. of Calgary, Apr. 26-27, 2004
Observatory I&T Flow
ASI Sensor Fab / Integration
(UCB)
Subsystem Acceptance Test
(incl performance verification)
GMAG / GPS Fab / Integration
(UCLA)
Subsystem Acceptance Test
(incl performance verification)
OSE Fab / Integration
(UCB)
Subsystem Acceptance Test
(incl performance verification)
Subsystem Inspection
Subsystem Inspection
Subsystem Inspection
System Integration
Functional Test
Burn - In
Shipment to Site
On-Site Functional Test and Verification
Remote Comms Verification
Physical Installation
Custodian Orientation
Remote Data Acquisition &
Control Verification
Installation Team departs site only after Operation is confirmed
Unattended Operation
THEMIS/GBO CDR Peer Review 4 Univ. of Calgary, Apr. 26-27, 2004
Current Deployment Schedule
Deployments scheduled between May and Oct in ’04, ’05, ‘06
By Winter ’04-’05: 6 GBOs done• Summer ’04: deploy 4 in
Canada, 2 in Alaska
By Winter ’05-’06: 14 GBOs done• Summer ’05: deploy 6 in
Canada, 2 in Alaska
• Demonstrate operational breadth of network
By Time of Themis Launch (Oct. ’06): 20 GBOs completed• Summer ’06: deploy final 6
in Canada
• Complete the network, have all operating
THEMIS/GBO CDR Peer Review 5 Univ. of Calgary, Apr. 26-27, 2004
Deploy Schedule Summary
No. Site Abbrev. Location Latitude Longitude GMAG type Deploy12 Athabasca ATHA Canada 54.7 246.7 NRCan & GPS-2 Apr-049 Prince George PGEO Canada 53.9 237.4 GMAG-Proto Jun-043 Mcgrath MCGR USA 63 204.4 GMAG-1 (6/18/04) Jul-047 Lac de Gras LGRA Canada 64.6 250 GMAG-2 (6/21/04) Jul-04
14 The Pas TPAS Canada ? ? GMAG-3 (6/28/04) Sep-042 Fort Yukon FYU USA 67 199.6 GI & GPS-1 Oct-04
8 Fort Simpson FSIM Canada 61.8 238.8 CGSM & GPS-3 May-054 Kiana KIA USA 66.6 214.7 GMAG-4 (9/24/04) Jun-055 Inuvik INUV Canada 68.3 226.7 CGSM ('06) & GPS-4 Jun-051 Gakona GAK USA 62.4 214.8 GI & GPS-5 Jul-05
10 Rankin Inlet RANK Canada 62.8 267.9 CGSM & GPS-6 Jul-0518 Nain NAIN Canada 56.5 298.3 GMAG-5 (9/27/04) Aug-0519 Gangon GANG Canada 51.9 291.8 GMAG-6 (3/14/05) Sep-0515 Pinawa PINA Canada 50.3 264 CGSM & GPS-7 Oct-05
11 Fort Smith FSMI Canada 60 248.1 CGSM & GPS-8 May-0613 Gillam GILL Canada 56.4 265.4 CGSM & GPS-9 May-0616 PBQ PBQ Canada 55.3 292.3 NRCan & GPS-10 Jun-066 White Horse WHOR Canada 60.7 224.9 GMAG-7 (5/2/05) Jul-06
20 Goose Bay GBAY Canada 53.3 299.6 GMAG-8 (5/9/05) Aug-0617 Kapuskasing KAPU Canada 49.4 277.6 GMAG-9 (5/16/05) Sep-06
Notes:
“GMAG-n” is a full UCLA-built system with GMAG sensor, expected delivery in parentheses
“GPS-n” is a UCLA-built system with GPS-only
THEMIS/GBO CDR Peer Review 6 Univ. of Calgary, Apr. 26-27, 2004
GBO Data Flow
THEMIS/GBO CDR Peer Review 7 Univ. of Calgary, Apr. 26-27, 2004
Data Responsibilities
Collaborator’s responsibilities:1) UCalgary physically installs and maintains the Canadian GBO's
2) UCB physically installs and maintains the Alaskan GBO's
3) UCalgary recovers all GBO data (UCB ASI, UCLA GMAG, H&S) and GBO team (UCLA, UCB, UA) picks up data at UCalgary.
4) UAlberta recovers CGSM and NRCAN GMAG data. UCB picks up data from UAlberta.
5) UCalgary responds to all high level GBO H&S issues. UCB acts in backup capacity for this role.
6) UCalgary maintains the physical status of the Canadian GBO's
7) UCB maintains the physical status of the Alaskan GBO's
8) UCLA validates the GMAG data and directs UCalgary to make any configuration or calibration changes. Changes are discussed and approved by GBO team.
9) UCalgary validates ASI data. UCalgary will make changes to an instrument configuration/calibration after consulting with the GBO team (if the action is not already specified in the ops doc).
10) UCLA will recover the E/PO data. UCB picks up data from UCLA.
11) UCLA will validate data and respond to any H&S issues.
THEMIS/GBO CDR Peer Review 8 Univ. of Calgary, Apr. 26-27, 2004
CDR Peer Review Results
RFA # Status Title Action SummaryGBO-1 Closed Create test and verification
planA T/V Plan document is forthcoming. Test matrix and test flow are completed.
GBO-2 Closed Create configuration control plan
Each site will have hardware configuration list that is unique. Software configuration for each site will be identical, based on reference system developed and maintained at UCB. This will be covered in CC Plan.
GBO-3 Closed Provide go/no-go criteria on GBO operational components
The GBO Operations Handbook will cover this.
GBO-4 Closed Specify mission criticality of E/PO elements
E/PO sites have never been considered as mission critical elements. They are educational opportunities.
GBO-5 Closed Responsibilities for Critical Monitoring
GBO Operations Handbook will cover this.
GBO-6 Closed Establish network security plan GBO network security plan is in process. Will cover details of filtering network I/O, and configuration of network data servers.
GBO CDR Peer Review on 26-27 April, 2004 resulted in 6 RFAs. All have been closed by the review board.
THEMIS/GBO CDR Peer Review 9 Univ. of Calgary, Apr. 26-27, 2004
CDR Peer Review Results
Suggestion # Title Discussion StatusGBO-S1 Humidity Control Implement humidity sensors, include in housekeeping will comply
GBO-S2 Active Thermal Control
Implement additional thermal protection will comply
GBO-S3 Lightning Implement lightning arresters - GPS includes this. Other external components under review.
under review
GBO-S4 Cemented Lenses Follow manufacturer's environmental (temperature, humidity) recommendations for cemented optics.
under review
GBO-S5 Exterior Field Hardware label
Include contact information on enclosure will comply
GBO-S6 GBO OSE and ASI enclosure materials
Review material compatibility for sun exposure will comply
GBO-S7 Setting up the ASI Provide set up fixture for levelling and orientation. will comply
GBO-S8 Satellite Photos of Cloud cover
Archive satellite imagery of cloud cover, for future data analysis.
will comply
GBO-S9 Data comms open year round
Maintain year-round communications to monitor station status. Note: GMAG to be operated continuously
will comply
GBO-S10 Observatory enclosure sizes
Review tranportability of enclosures, relative to maximum size constraints.
will comply
GBO-S11 Recognize Canadian participation
E/PO group reference Canandian participation will comply
GBO-S12 Iridium satcomm Review power requirements and reliability available. will comply
GBO CDR Peer Review on 26-27 April, 2004 resulted in several recommendations, summarized below...
Recommended