The role of data science in informing disaster mitigation and resilience policy · 2018-08-06 ·...

Preview:

Citation preview

www.csiro.au

The role of data science in informing disaster mitigation and resilience policy

Simon Dunstall, Decision Sciences, CSIRO Data61August 2018

1 |

Informing

community understanding, knowledge of environmental and community vulnerability, natural hazard impacts mitigation, and regional development policyusing data science, computational modelling, and engagement between science and stakeholders

Data61 Decision Sciences2 |

Understanding long‐term MSL and storm surge impacts

3 |

https://www.youtube.com/watch?v=nlXM4IuU‐YA• Dynamic models incorporating 

localized rainfall, storm surge, sea‐level rise, stormwater drainage, terrain interaction

• Effect of mitigations• Limits of mitigations• Building community 

understanding• Basis for infrastructure and 

land‐use policy

Data61 Decision Sciences4 |

Data61 Decision Sciences5 |

Satellite Surveying and Mapping Application Centre in China, CSIRO used SPH and DEM methods to test scenarios such as the hypothetical collapse of the massive Geheyan Dam in China

Data61 Decision Sciences6 |

ALTERNATIVE PLANNING INITIATIVES (ALTERPLAN) (www.alterplan.org.ph)DIGITAL PRODUCTIVITY AND SERVICES FLAGSHIP  (www.csiro.au)

Legazpi City – 9 BarangaysAlbay Province has active volcano, risks from frequent typhoons, heavy rainfall, flooding, mudslides, lahar flow

Nine barangays - low risk from lahar, high risk from flooding and storm surge.

Informal settlers – 50% of popn in nine barangays, 25% of popn of entire City.

ALTERNATIVE PLANNING INITIATIVES (ALTERPLAN) (www.alterplan.org.ph)DIGITAL PRODUCTIVITY AND SERVICES FLAGSHIP  (www.csiro.au)

ALTERNATIVE PLANNING INITIATIVES (ALTERPLAN) (www.alterplan.org.ph)DIGITAL PRODUCTIVITY AND SERVICES FLAGSHIP  (www.csiro.au)

Study Area Hazardsflooding storm surge

landslide ground subsidence

ALTERNATIVE PLANNING INITIATIVES (ALTERPLAN) (www.alterplan.org.ph)DIGITAL PRODUCTIVITY AND SERVICES FLAGSHIP  (www.csiro.au)

ALTERNATIVE PLANNING INITIATIVES (ALTERPLAN) (www.alterplan.org.ph)DIGITAL PRODUCTIVITY AND SERVICES FLAGSHIP  (www.csiro.au)ALTERNATIVE PLANNING INITIATIVES (ALTERPLAN) (www.alterplan.org.ph)DIGITAL PRODUCTIVITY AND SERVICES FLAGSHIP  (www.csiro.au)DIGITAL PRODUCTIVITY AND SERVICES FLAGSHIPwww.csiro.au

DR‐SSP Map –Bgy 37 (Bitano)

SLR 0.0 m SLR 0.14 m

SLR 0.8 mSLR 0.4 m

Data61 Decision Sciences12 |

Informing and guiding

infrastructure change, industry practices, emergency response resourcing, and policy and regulatory changeusing data science, computational modelling, quantitative risk analytics, and science‐government‐industry engagement

Data61 Decision Sciences13 |

Data61 Decision Sciences14 |

Data61 Decision Sciences15 |

A bare‐earth fire break in Pinus radiataplantation in the Green Triangle of south‐eastern South Australia with associated fuel management zone to augment the effectiveness of the fire break

In this case the fuel management zone consists of tree removal for ~3 m from the road, a first thinning and a pruning to 2.5 m at age 9 years

Data61 Decision Sciences16 |

Gurnang, NSW

Data61 Decision Sciences17 |

Powerline Bushfire Safety Program

• The Powerline Bushfire Safety Program (PBSP) was established by the Victorian government in response to the 2009 Black Saturday bushfires

• Research supporting PBSP decision‐making around electrically‐caused bushfires:• Why electrically‐caused bushfires account for over most bushfire‐related deaths in Victoria since 1950

• Informing policy and regulatory change• Estimating the performance of existing and future network technologies

• Providing comprehensive risk analyses, asset prioritisations and mapping products, to inform decision‐makers about the highest‐value locations to replace existing powerlines.

19 |

Data61 Decision Sciences20 |

https://youtu.be/JZVYTkYY2u4

Data61 Decision Sciences21 |

https://youtu.be/JZVYTkYY2u4

Data61 Decision Sciences22 |

https://youtu.be/JZVYTkYY2u4

Consequence mapping

For explanatory and illustrative purposes only. This diagram is not based on real data. 

24 |

Probabilistic impact areaWind variation• Probability of fire reaching particular location• Colour scale shows probability (red = high)

Electrical asset wildfire risk map

25 |

Data scale:• 2.1M fire simulations• 20M ignition rate data points at (pole, option) level

27 |

https://youtu.be/n5_SwJzFUP4

PBSP: policy and regulatory change• Overall policy position oriented around facilitating data‐driven 

optimized investment profiles, enabled by regulations which communicate technical requirements but moreover state the community’s risk tolerance and accepted trade‐offs.

• Regulatory change leading to investment in partnership between the state and electricity companies. Quantitative risk analytics as a guiding principle.

• A$200M in targeted powerline undergrounding• Locations selected based on quantitative risk assessment

• A$300M in staged REFCL rollout across codified areas• According to new electrical safety regulations• Sequencing directly based on quantitative risk assessment• Final A$100M funded from processes overseen by National Energy Regulator (AER)

• Likelihood and consequence datasets as “standards”• “Official” estimates of fire likelihood reduction due to HV powerlines• Used multiple times in justifying risk‐reducing exemptions to regulations

• Financial penalty scheme for electrical fire starts• Risk reduction estimates used in “tapering” fire counts over time• Expected annual cost and cost variability analysis, for fairness and acceptability

• Emerging national standard in approach and data• Applications in other Australian states and internationally• Prime analytics case study and a model for approaches to other hazards 

Data61 Decision Sciences29 |

Building

data, modelling,computation, and decision supporttechnologies and communities

Data61 Decision Sciences30 |

Data, technology, products and services stack

Data61 Decision Sciences31 |

Model‐oriented services

Data acquisition

Data repositories

Data marshalling, transformation, repair, inference and workflow

Analytics and computational models

Data products

Information and decision support

Investment, regulation and policy change Situational awareness and response

Data61’s Geostack Engine

32 |

Three key components constitute Geostack

Gathering Processing Awareness

Remote sensing

Sensor networks Survey data

Geotagged data

Live scanning

Cloud compute

Analytics

GIS applications

Real‐time spatial information

Fire simulation

Data61 Decision Sciences33 |

www.research.csiro.au/spark

Concluding remarks

• Data products (e.g. fire maps), models (e.g. Spark) and systems drive informed investment, regulation and policy

• Data collection and transformation ranges in scale and complexity, from citizen engagement through to automated beneficiation of remotely‐sensed data for use in models

• It is vital to ensure that key elements are commonly available and openly developed

• Groups and organisations need to contribute from a foundation of core competency, and share and use the world‐class skills of others

Data61 Decision Sciences34 |

Data61 Decision Sciences35 |

http://www.confer.nz/idrim2018/

www.csiro.au

http://www.data61.csiro.au

Thank You

36 |

Recommended