View
117
Download
0
Category
Tags:
Preview:
DESCRIPTION
THE NEW GUIDELINE FOR THE CERTIFICATION OF WIND TURBINES, EDITION 2010. 22.04.2010. Germanischer Lloyd ( GL). GL‘s History in Guidelines (Wind). 1977 First activities in wind energy 1986 1st Guideline (onshore) 1993 1st revision of onshore Guideline 1994 European Offshore Study - PowerPoint PPT Presentation
Citation preview
THE NEW GUIDELINE FOR THE CERTIFICATION OF WIND TURBINES, EDITION 201022.04.2010
Germanischer Lloyd (GL)
Belgium 2%
United Kingdom
40%Denmark 29%
Netherlands17%
Ireland 2%
Sweden 9%
Germany 1%
GL‘s History in Guidelines (Wind)
1977 First activities in wind energy
1986 1st Guideline (onshore)
1993 1st revision of onshore Guideline
1994 European Offshore Study
1995 1st Guideline (offshore)
1999 Revision of Guidelines
2003 3rd revision of onshore Guideline
2004 Supplement
2005 Revision of offshore Guideline
2008 Start for GL 2010
2010 Publication of GL 2010
The Project – a long way to go
• review and revision of all chapters and sections of the existing edition• clarification of new information with regard to concepts, developments and solutions of both technical and certification background• harmonization with existing
guidelines and standards
The Project – a long way to go
• preparation of draft chapters and sections including revisions and new items• discussion and clarification
of all drafts in the technical committee of GL
• layout, editorial office, translation• print and publication
mean wind speedturbulence
Load Assumptions
• GL Guideline, Edition 2003 with Supplement 2004• IEC 61400-1, 2nd Edition• IEC 61400-1, 3rd Edition• Best Engineering Practice• GL 2010 ?
• full flexibility and maximum options• additionally update of
load case catalogue
Small Wind Turbines (SWT)Source: Tozzi Nord
Source: Southwest Windpower
Source: Lehmkuhl
Local Markets
Type and Project Certification
IPEIPE
Project –CertificateProject –
Certificate
Site Design Conditions
Site Design Conditions
Commissioning Surveillance
Commissioning Surveillance
Periodic MonitoringPeriodic Monitoring
Design AssessmentDesign Assessment
Site SpecificDesign Assessment
Site SpecificDesign Assessment
Manufacturing Surveillance
Manufacturing Surveillance
Prototype TestingPrototype TestingQuality ManagementQuality Management
Type-Certificate
Type-Certificate
Transport and Install. Surveillance
Transport and Install. Surveillance
Thank you very much!
Please visit us at our Booth No. 1120.
Further InformationMike Woebbeking
Germanischer Lloyd Industrial Services GmbHCompetence Centre Renewables Certification
Head of Machinery Components and Safety Department / Deputy Head of Certification Body
Brooktorkai 1820457 Hamburg GERMANY
Phone: +49 (0) 40 - 3 61 49 - 33 07 Fax: +49 (0) 40 - 3 61 49 - 17 20
Email: mike.woebbeking@gl-group.com www: http://www.gl-group.com/GLRenewables
Recommended