th EAC MoM point no. 18.3.05. We are hereby uploading point...

Preview:

Citation preview

Please refer to 18th EAC MoM point no. 18.3.05. We are hereby uploading point wise reply

of Expansion of group housing at Khasra No. 1058m, 1726M/1, 1725M/2, 1724M,

1056M, 1058M, 1060/1 at Village Pasona Pargana, Loni, District-Ghaziabad, Uttar Pradesh

by M/s Nipun Builders & Developers Pvt. Ltd. – Environmental Clearance -

[F.No.21-130/2017-IA-III].

You are requested to kindly consider reply & take up our case in the upcoming Meeting of EAC

POINT WISE REPLY

S.NO. QUARRY REPLY

1 Certified compliance report issued by the MoEF&CC

Regional Office, Lucknow on environmental

conditions stipulated in the existing environmental

clearance

Certified Compliance Report is attached as

Annexure 1

2 Give a conformity status to conditions stipulated in

Annexure XIV of the amended EIA Notification vide

S.O. 3999 (E) dated 09.12.2016.

This is an Expansion project and most of the

points of the conditions given in MoEF

notification dated 09.12.2016 are being

followed and the conditions will be fully

complied in the expansion area.

3 Notarized affidavit of undertaking by Board of

Director(s) stating, no construction activity has

commenced at the site and Project Proponent

undertakes that the construction works will be

commenced only after obtaining all necessary

clearances from statutory authorities

Affidavit regarding no construction work is

carried out in expansion area is attached as

Annexure 2.

4 Submit an assessment of the cumulative impact of

expansion and increased inhabitation being carried

out or proposed to be carried out by the project for

traffic densities and parking capabilities in a 5 kms.

radius from the site. A detailed traffic management

and a traffic decongestion plan drawn up through

an organization of repute and specializing in

Transport Planning shall also be submitted.

• Main road connecting to the project site

is 75 m.

• Separate entry exit will be provided

Internal road width is 6 m wide.

• Speed breakers proposed at the entry

exit gate, at the entry/exit ramps of

basements and at regular interval of the

internal road.

• Signage for speed limit restricted to 20

kmph will be displayed along the

internal roads.

• One way internal traffic movement is

proposed.

• Parking norm as per local regulation

5 Compliance report of ECBC norms This is an Expansion project the ECBC norms

will be followed to the extent possible.