Texas Department Jay R. Nelson, P.E. TxDOT District

Preview:

Citation preview

121’

PROPOSED 145’ROW

EXISTING ROW VARIES FROM 90’TO 125’

6" MONO CURB6" MONO CURB6" MONO CURB

6" MONO CURB

CL ROADWAY

31

31

313

12%

2%2%

LT PGL

RT PGL

2’

2%

FUTURE LEFT

TURN LANE

FUTURE

THRU LANE

FUTURE

THRU LANE

SCALE: 1"=10’

TYPICAL SECTION - DUAL LEFT TURN W/RIGHT TURN LANE

CLR.

ZONE

3’

CLR.

ZONE

3’

12’12’12’12’12’7’

CROWN

2’ 12’12’12’ 2’ 2’12’ 12’ 10’

PROPOSED 132’ ROW

EXISTING ROW VARIES FROM 90’TO 125’

TYPICAL SECTION - 1 LEFT TURN W/ RIGHT TURN LANE

6" MONO CURB RT PGL

FUTURE LEFT

TURN LANE

FUTURE

THRU LANE

12’12’6’

CROWN

2’

CLR.

ZONE

3’

1

1

3

3

2%

6" MONO CURB

12’12’

FUTURE

THRU LANE

6" MONO CURB

6" MONO CURB

CL ROADWAY

31

31

2%

LT PGL

2’

2%2%

SCALE: 1"=10’

108’

CLR.

ZONE

3’

12’12’12’ 2’ 2’12’ 12’ 10’

96’

12’

PROPOSED 120’ MINIMUM ROW - 130’MAXIMUM ROW

EXISTING ROW VARIES FROM 90’TO 125’

6" MONO CURB

6" MONO CURB6" MONO CURB

6" MONO CURB

CL ROADWAY

31

31

31

31

2%2%

LT PGL

FUTURE

THRU LANE

RT PGL

2’

2%2%

FUTURE LEFT

TURN LANE

FUTURE

THRU LANE

SCALE: 1"=10’

TYPICAL SECTION - 1 LEFT TURN

CLR.

ZONE

3’

12’12’6’

CLR.

ZONE

3’

CROWN

2’ 12’12’12’ 2’ 2’12’ 12’ 10’

ZONE

CLR.

ZONE

CLR.

3’ 96’ 3’

2’ 12’ 12’ 2’ 10’ 2’ 16’ 2’ 10’ 2’ 12’ 12’ 2’ 12’12’

FUTURE

THRU LANE

FUTURE

THRU LANE

PROPOSED 120’ MINIMUM ROW - 130’MAXIMUM ROW

EXISTING ROW VARIES FROM 90’TO 125’

6" MONO CURB6" MONO CURB

6" MONO CURB6" MONO CURB

CL ROADWAY

31

31

31

31

2%2%

RT PGLLT PGL

2%2%

SCALE: 1"=10’

CROWN

TYPICAL SECTION

2.00%2.00%

SCALE: 1"=10’

TYPICAL SECTION - BRIDGE

L

1.00’

RAIL

5.00’

SDWK

2.00’ 2.00’ 2.00’ 3 - 12.00’ LANES = 36.00’

1.00’

RAIL

PR2 RAIL

PR2 RAIL

T203 RAIL

CONST. JOINT

5’-4"

AS

SU

ME

D

ST

RU

CT

UR

E

DE

PT

H

AASHTO TYPE IV

PRESTRESSED CONCRETE BEAMS

2.00’

5.00’

SDWK

18.75’

PGL

1.00’

RAIL

40.00’ ROADWAY8.00’

MEDIAN

8.00’

MEDIAN

C CUSTER ROAD

1.00’

RAIL

T203 RAILPGL

3 - 12.00’ LANES = 36.00’

40.00’ ROADWAY

110’ OVERALL

by Texas Department of Transportation:

(512) 416-2055; all rights reserved

PROJECT MANAGERSENGINEERS PLANNERS

C 2002

R

Texas Department of Transportation

2033 - 29,100

2003 - 14,900

ADT:

TO: STONEBRIDGE DRIVE

FROM: U.S. 380

PROJECT LENGTH: 3.42 MILES

FEBRUARY 2003

FUNCTIONAL CLASSIFICATION: URBAN COLLECTOR

ROLL OF 3

Design Speed = 45 mph

Vert. Scale 1:10

Horiz. Scale 1:100

CSJ: 2351-01-013

Collin County

F.M. 2478 (CUSTER ROAD)

Design Schematic

Jay R. Nelson, P.E.

TxDOT District Engineer

Texas Department

of Transportation

by Texas Department of Transportation:

(512) 416-2055; all rights reserved

PROJECT MANAGERSENGINEERS PLANNERS

C 2002

R

Texas Department of Transportation

Paul A. Tucker DatePaul A. Tucker Date

2033 - 29,100

2003 - 14,900

ADT:

TO: STONEBRIDGE DRIVE

FROM: U.S. 380

PROJECT LENGTH: 3.42 MILES

FEBRUARY 2003

78

BEGINPROJECT

ENDPROJECT

FR

ISC

O

McKINNEY

VIRGINIA PKWY

720

STONEBRIDGE DR

75

121

380

LOCATION MAPN.T.S.

FUNCTIONAL CLASSIFICATION: URBAN COLLECTOR

ROLL OF 3

Design Speed = 45 mph

Vert. Scale 1:10

Horiz. Scale 1:100

CSJ: 2351-01-013

Collin County

F.M. 2478 (CUSTER ROAD)

Design Schematic

Jay R. Nelson, P.E.

TxDOT District Engineer

Texas Department

of Transportation

78

BEGINPROJECT

ENDPROJECT

FR

ISC

O

McKINNEY

VIRGINIA PKWY

720

STONEBRIDGE DR

75

121

380

THIS DOCUMENT IS RELEASED FOR THE

PURPOSE OF INTERIM REVIEW ONLY.

UNDER THE AUTHORITY OF PAUL A. TUCKER,

P.E. 77234. IT IS NOT TO BE USED FOR

CONSTRUCTION, BIDDING, OR PERMIT PURPOSES.

THIS DOCUMENT IS RELEASED FOR THE

PURPOSE OF INTERIM REVIEW ONLY.

UNDER THE AUTHORITY OF PAUL A. TUCKER,

P.E. 77234. IT IS NOT TO BE USED FOR

CONSTRUCTION, BIDDING, OR PERMIT PURPOSES.

LOCATION MAP

4:5

9:2

0 P

M12/2

1/2

005

\\U

sdal1

fp01\p

w\M

cK

inney\C

uste

r R

oad\S

chem

ati

c_2003\A

pproved S

chem

\CU

ST

ER

_S

CH

EM

01A

.dgn

=3^8’18.92"

R=5000’

L=273.89’

T=136.98’

LC=N1^20’43"W

273.86’

=3^8’18.92"

R=5000’

L=273.89’

T=136.98’

LC=N1^20’43"W

273.86’

=3^8’18.92"

R=5000’

L=273.89’

T=136.98’

LC=N1^47’36"E

273.86’

=3^8’18.92"

R=5000’

L=273.89’

T=136.98’

LC=N1^47’36"E

273.86’

=1^19’46.34"

R=8618.48’

L=199.99’

T=100.02’

LC=N0^26’39"W

199.98’

=0^46’29.02"

R=16000’

L=216.35’

T=108.17’

LC=N0^45’35"W

216.34’

N00^13’25"E

19.83’

N0^13’26"E 378.18’

PI= 186+83.82

PI= 196+37.24

PI= 199+11.14

PI = 203+13.15

CURVE DATA

PT= 200+48.08

PRC= 197+74.18

CURVE DATAPC= 195+00.28

PI= 184+09.94

CURVE DATA

CURVE DATA

PT= 188+20.78

PRC= 185+46.88

PC= 182+72.99

PC=176+94.81

PROPOSED DRAINAGE

EASEMENT

PROPOSED DRAINAGE

EASEMENT

PROPOSED DRAINAGE

EASEMENT

PROPOSED DRAINAGE

EASEMENT

PROPOSED DRAINAGE

EASEMENTBinary

CURVE DATA

CURVE DATA

PT= 178+94.82

PT= 167+10.60

PC= 164+94.25

STA. 217+05.61

STA. 192+23.56

STA. 179+20.74

Binary

PI = 165+94.25= 01^14’00" LT

PT = 205+58.46

CURVE DATA

=2^27’10"

R=11459.16’

L=490.55’

T=245.31’

LC=N01^00’10"W

490.52’

PC= 200+67.90

PI = 177+94.81

PI = 165+94.25

CITY OF MCKINNEY 15’ SANITARY SEWER EASEMENT

CITY OF MCKINNEY 15’ SANITARY SEWER EASEMENT

CITY OF MCKINNEY 15’ SANITARY SEWER EASEMENT

CITY OF MCKINNEY 15’ SANITARY SEWER EASEMENT

CITY OF MCKINNEY 10’ SANITARY SEWER EASEMENT

STONEBRIDGE - FOUNTAINVIEW

NEW CONSTRUCTION

N00^13’26"E 679.51’

S00^20’50"E 2304.45’

N01^06’50"W 984.21’

N02^13’45"W

2610.89’

FOUNTAINVIEW PHASE ONE

CABINET N, PAGE 123

P.R.C.C.T.

0.460 AND 0.165 ACRE

CHANNEL EASEMENT

VOLUME 553, PAGE 216

D.R.C.C.T.

0.184 ACRE

CHANNEL EASEMENT

VOLUME 553, PAGE 201

D.R.C.C.T.

Proposed Residential

Area

Proposed Residential

Area

FH

FH

FH

FH

ExistingHouse

ExistingHouse

ExistingHouse

ExistingHouse

MH

TF

P

LP

FH

FH

MH

MH

Stock P

ile

LP

LP

LP

LP

LP

TF

P

LP

LP

TF

P

TF

P

FH

TF

P

CO

TT

ON

RID

GE

RD

S

600

2000

2600

8800

26500

40400

600

2000

2600

FM 2478

300

1000

2600

9100

27500

40400

300

1000

2600

FO

UN

TA

INV

IEW

DR

.

FM 2478

CO

UN

TY

RO

AD

22

50

6800

10500

100

12800

19400

50

68

00

10

40

0

50

7400

11100

CO

UN

TY

RO

AD

22

9300

14300

21400

2600

9500

14200

FM 2478

ST

ON

EB

RID

GE

DR

.

3500

3900

5700

4500

7300

10700

FM 2478

8500

32700

49300

PROPOSED LANE DIRECTIONAL INDICATOR

VEGETATIVE FILTER STRIPS WILL BE USED AS THE TOTAL

SUSPENDED SOLIDS CONTROL MEASURES ON THIS PROJECT.

VEGETATIVE FILTER STRIPS WILL BE USED AS THE TOTAL

SUSPENDED SOLIDS CONTROL MEASURES ON THIS PROJECT.

PROPOSED GRADE AT PGL

STA. 176+38 TO STA. 178+48

STA. 179+97 TO STA. 182+07

BEGIN RETAINING WALL

STA. 185+00

BEGIN RETAINING WALL

STA. 182+00

STA. 195+00

END RETAINING WALL

END RETAINING WALL

STA. 193+50

STA. 192+83 TO STA. 195+02STA. 165+23 TO STA. 172+87

STA. 185+47 TO STA. 189+70

STA. 190+72 TO STA. 192+83

STA. 196+43 TO STA. 217+58

CULVERT 2

STA. 218+17

CULVERT 1

STA. 199+49

PR

OP

. R

OW

120’

140’ TAPER

140’ DECEL140’ TAPER

80’ STORAGE

PR

OP

. R

OW

14

5’

210’ TAPER140’ STORAGE 70’ DECEL

140’ TAPER

140’ DECEL280’ STORAGE

140’ TAPER 140’ DECEL280’ STORAGE

140’ STORAGE70’ DECEL

210’ TAPER

140’ DECEL280’ STORAGE 140’ TAPER

PROPOSED SLOPE PROTECTION

PROPOSED SLOPE PROTECTION

STA. 159+24 TO STA. 164+00

STA. 217+58 TO STA. 218+98

AREA WHERE PAVESTONE WALL REQ’D FOR GRADING

EL

DO

RA

DO

PA

RK

WA

YE

LD

OR

AD

O P

AR

KW

AY

INTERSECTIONFUTURE SIGNALIZED

140’ STORAGE

SCALE: 1"=10’

EXIST.

R.O.W.

EXIST.

R.O.W.

TYPICAL SECTION EXISTING ROADWAY

10’10’

32’

90’ MIN.

TWO COURSE SURFACE

TREATMENT

10" FOUNDATION COURSE

5/16 IN/FT 5/16 IN/FT

2’

2’2’

2’

PROPOSED R.O.W.

PROPOSED RETAINING WALL

12

0’

PR

OP

. R

OW

120’

PR

OP

. R

OW

50-YR

Q = 4317 cfs

V = 9.19 ft/s

WSE = 705.05 ft

Q = 3605 cfs

V = 8.65 ft/s

WSE = 704.18 ft

25-YR

ROWLETT CREEK

HYDRAULIC DATA

EXISTING BRIDGE

FROM STA. 189+81.59

TO STA. 190+57.55

END RETAINING WALL

STA. 205+63.98

BEGIN RETAINING WALL

STA. 204+07.48

DATA FURNISHED BY TxDOT

XXXX 2033 ADT

XXXX 2023 ADT

XXXX 2003 ADT

STA. 189+70 TO STA. 190+72

11

TRAFFIC DATA

120’

PR

OP

. R

OW

90’

EX

IS

. R

OW

90

EX

IS

. R

OW

12

0’

PR

OP

. R

OW

10

5’

EX

IS

. R

OW

12

0’

PR

OP

. R

OW

90

EX

IS

. R

OW

12

0’

EX

IS

. R

OW

END BRIDGE

ABUTMENT 2

STA. 190+72.00

BEGIN BRIDGE

ABUTMENT 1

STA. 189+70.00

keerC ttelwo

R

keer

C ttelwo

R

PROPOSED PAVEMENT

FOUNTAINVIEW PHASE ONE

CABINET N, PAGE 123

P.R.C.C.T.

780

770

700

750

760

730

740

710

720

PROPOSED DRIVEWAY PAVEMENT

BEGIN PROJECT

CSJ # 2351-01-013

STA. 159+23.65

BEGIN PROJECT

CSJ # 2351-01-013

700

750

730

740

710

720

220+00215+00210+00205+00200+00195+00190+00185+00180+00175+00170+00165+00160+00155+00

PROPOSED

MULTIPLE

BOX CULVERT

3 - 5’ X 5’

PV

T S

TA

. 1

63

+6

2.9

8

EL

EV

. 7

03

.93

PV

T S

TA

. 1

61

+8

9.1

2

EL

EV

. 7

04

.31

0.1964 ACRE ROW TAKE

VOLUME 2875, PAGE 345

D.R.C.C.T.

CO

TT

ON

RID

GE

RO

AD

S

0.7183 ACRE ROW TAKEVOLUME 3005, PAGE 322

D.R.C.C.T.

FO

UN

TA

INV

IEW

DR

IVE

ST

ON

EB

RID

GE

DR

IVE

PROPERTY BOUNDARIES

0.041 ACRE

CHANNEL EASEMENT

VOLUME 553, PAGE 208

D.R.C.C.T.

BOOKER LIVING TRUST

39.18 ACRE TRACT

CLERK’S FILE NO. 95-0020521 L.R.C.C.T.

WESTERRA STONEBRIDGE, L.P.

15.2919 ACRE TRACT

CLERK’S FILE NO. 96-0106740

L.R.C.C.T.

WENTWOOD PARTNERS, LTD

67.67 ACRE TRACT

CLERK’S FILE NO. 97-0064925 L.R.C.C.T.

CL

YD

E A

. &

LU

CR

ET

IA

M. G

EE

R

3.0

0 A

CR

E T

RA

CT

CL

ER

K’S

FIL

E N

O.

96

-0

00

63

66

L.R

.C.C

.T.

KILLIS MELTON

95 ACRE TRACT

VOLUME 729, PAGE 47

D.R.C.C.T.

WENTWOOD PARTNERS, LTD

67.67 ACRE TRACT

CLERK’S FILE NO. 97-0064925 L.R.C.C.T.

STONEBRIDGE - FOUNTAINVIEW

NEW CONSTRUCTION

CHANNEL EASEMENT

WENTWOOD PARTNERS, LTD

67.67 ACRE TRACT

CLERK’S FILE NO. 97-0064925 L.R.C.C.T.

0.184 ACRE

CHANNEL EASEMENT

VOLUME 553, PAGE 201

D.R.C.C.T.

0.460 AND 0.165 ACRE

CHANNEL EASEMENT

VOLUME 553, PAGE 216

D.R.C.C.T.

CLIFF C. HENDERSON

15.86 ACRE TRACT

CLERK’S FILE NO. 94-0024047 L.R.C.C.T.

GE

OR

GE

D. &

MA

RIL

YN

K. P

RA

TT

0.4

45

AC

RE

TR

AC

T

CL

ER

K’S

FIL

E N

O.

94

-0

05

55

28

L.R

.C.C

.T.

L109 MCKINNEY INVESTMENTS, LTD

PARCEL 808

WESTERRA STONEBRIDGE, L.P.

50.483 ACRE TRACT

CLERK’S FILE NO. 96-0106740

L.R.C.C.T.

I-20/SOUTH COLLINS, LTD.

14.980 ACRE TRACT

CLERK’S FILE NO. 2001-0053128 L.R.C.C.T.

AMBROSE & ELINOR SECOR

1.96 ACRE TRACT

VOLUME 785, PAGE 378

D.R.D.C.T.

SWISHER PARTNERS L.P.

12.401 ACRE TRACT

C.C.F.NO. 00-0051512

VOLUME 4671, PAGE 2224

D.R.C.C.T.

WESTERRA STONEBRIDGE, L.P.

196.9216 ACRE TRACT

CLERK’S FILE NO. 96-0106740 L.R.C.C.T.

SHADDOCK DEVELOPERS, LTD

57.575 ACRE TRACT

VOLUME 4670, PAGE 1919 D.R.C.C.T.

THE 2478 JOINT VENTURE 57.685 ACRE TRACT

CLERK’S FILE NO. 92-0014476 L.R.C.C.T.

PROPOSED MEDIAN NOSE PAVEMENT

PROPOSED BRIDGE

PI = 165+94.25= 01^14’00" LT

PROPOSED MULTIPLE

BOX CULVERT

4 - 6’ X 6’

0.50%

PV

I S

TA

. 2

16+

00.0

0

EL

EV

. 722.9

6

RT

&L

T T

.O.P

.

EL

EV

. 7

20

.81

RT

&L

T T

.O.P

.

EL

EV

. 725.4

6

RT

&L

T T

.O.P

.

EL

EV

. 724.9

6

RT

&L

T T

.O.P

.

EL

EV

. 724.4

6

RT

&L

T T

.O.P

.

EL

EV

. 723.9

6

RT

&L

T T

.O.P

.

EL

EV

. 723.4

6

RT

&L

T T

.O.P

.

EL

EV

. 7

22

.95

RT

&L

T T

.O.P

.

EL

EV

. 7

22

.24

RT

&L

T T

.O.P

.

EL

EV

. 7

21

.53

0.72%

110’ V.C.

K = 90

E = 0.17’

PV

I S

TA

. 2

05

+7

2.3

5

EL

EV

. 7

15

.59

PV

T S

TA

. 2

06+

27.3

5

EL

EV

. 7

15

.98

PV

C S

TA

. 2

05+

17.3

5

EL

EV

. 7

15

.87

-0.50%

230’ V.C.

K = 121

E = -0.55’

PV

I S

TA

. 2

03+

53.0

1

EL

EV

. 7

16

.69

PV

T S

TA

. 2

04

+6

8.0

1

EL

EV

. 7

16

.11

RT

&L

T T

.O.P

.

EL

EV

. 716.2

6

RT

&L

T T

.O.P

.

EL

EV

. 7

20

.09

RT

&L

T T

.O.P

.

EL

EV

. 7

19

.37

RT

&L

T T

.O.P

.

EL

EV

. 718.6

6

RT

&L

T T

.O.P

.

EL

EV

. 7

17

.84

RT

&L

T T

.O.P

.

EL

EV

. 7

17

.22

RT

&L

T T

.O.P

.

EL

EV

. 7

16

.51

RT

&L

T T

.O.P

.

EL

EV

. 7

15

.83

RT

&L

T T

.O.P

.

EL

EV

. 7

15

.95

1.40%

0.97%

PV

C S

TA

. 202+

38.0

1

EL

EV

. 7

15

.08

-0.74%

195’ V.C.

K = 91

E = 0.52’

PV

I S

TA

. 2

00

+2

2.9

5

EL

EV

. 7

12

.07

PV

T S

TA

. 2

01

+2

0.4

5

EL

EV

. 7

13

.43

PV

C S

TA

. 1

99

+2

5.4

5

EL

EV

. 7

12

.79

210’ V.C.

K = 123

E = -0.45’

PV

I S

TA

. 197+

60.4

9

EL

EV

. 7

14

.00

PV

T S

TA

. 198+

65.4

9

EL

EV

. 7

13

.23

PV

C S

TA

. 1

96

+5

5.4

9

EL

EV

. 7

12

.98

155’ V.C.

K = 90

E = 0.33’

PV

T S

TA

. 195+

54.5

9

EL

EV

. 7

12

.01

PV

I S

TA

. 194+

77.0

9

EL

EV

. 711.2

6R

T&

LT

T.O

.P.

EL

EV

. 7

11

.65

RT

&L

T T

.O.P

.

EL

EV

. 7

15

.79

RT

&L

T T

.O.P

.

EL

EV

. 7

14

.55

RT

&L

T T

.O.P

.

EL

EV

. 7

13

.17

RT

&L

T T

.O.P

.

EL

EV

. 7

12

.54

RT

&L

T T

.O.P

.

EL

EV

. 7

12

.97

RT

&L

T T

.O.P

.

EL

EV

. 7

13

.53

RT

&L

T T

.O.P

.

EL

EV

. 7

13

.33

RT

&L

T T

.O.P

.

EL

EV

. 7

12

.45

-0.75%0.50%

PV

C S

TA

. 1

93

+9

9.5

9

EL

EV

. 7

11

.84

150’ V.C.

K = 120

E = -0.23’

PV

T S

TA

. 192+

25.0

0

EL

EV

. 7

13

.14

PV

I S

TA

. 1

91

+5

0.0

0

EL

EV

. 7

13

.70

PV

C S

TA

. 1

90

+7

5.0

0

EL

EV

. 7

13

.33

PV

I S

TA

. 1

88

+0

0.0

0

EL

EV

. 7

11

.95

L OF

ROWLETT CREEK

C

RT

&L

T T

.O.P

.

EL

EV

. 7

10

.74

RT

&L

T T

.O.P

.

EL

EV

. 7

11

.84

RT

&L

T T

.O.P

.

EL

EV

. 7

12

.58

RT

&L

T T

.O.P

.

EL

EV

. 7

13

.30

RT

&L

T T

.O.P

.

EL

EV

. 7

13

.42

RT

&L

T T

.O.P

.

EL

EV

. 7

12

.95

RT

&L

T T

.O.P

.

EL

EV

. 7

12

.45

RT

&L

T T

.O.P

.

EL

EV

. 7

11

.95

RT

&L

T T

.O.P

.

EL

EV

. 7

11

.35

0.60%

-0.73%

120’ V.C.

K = 90

E = 0.20’

PV

T S

TA

. 1

80

+9

9.3

9

EL

EV

. 7

07

.72

PV

C S

TA

. 1

79

+7

9.3

9

EL

EV

. 7

07

.80

PV

I S

TA

. 1

80+

39.3

9

EL

EV

. 707.3

6

210’ V.C.

K = 121

E = -0.45’

PV

I S

TA

. 1

77

+3

8.7

7

EL

EV

. 7

09

.54

PV

T S

TA

. 1

78+

43.7

7

EL

EV

. 7

08

.78

PV

C S

TA

. 1

76+

33.7

7

EL

EV

. 7

08

.48

RT

&L

T T

.O.P

.

EL

EV

. 7

08

.97

RT

&L

T T

.O.P

.

EL

EV

. 7

10

.14

RT

&L

T T

.O.P

.

EL

EV

. 7

09

.54

RT

&L

T T

.O.P

.

EL

EV

. 7

08

.93

RT

&L

T T

.O.P

.

EL

EV

. 7

08

.33

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.73

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.67

RT

&L

T T

.O.P

.

EL

EV

. 7

08

.37

RT

&L

T T

.O.P

.

EL

EV

. 7

09

.02

-0.50%1.01%

140’ V.C.

K = 93

E = 0.26’

PV

T S

TA

. 1

75+

35.3

5

EL

EV

. 7

07

.49

PV

I S

TA

. 1

74

+6

5.3

5

EL

EV

. 7

06

.79

PV

C S

TA

. 1

73+

95.3

5

EL

EV

. 7

07

.14

120’ V.C.

K = 120

E = -0.15’

PV

T S

TA

. 172+

60.0

0

EL

EV

. 7

07

.82

PV

C S

TA

. 1

71

+4

0.0

0

EL

EV

. 7

07

.82

PV

I S

TA

. 1

72+

00.0

0

EL

EV

. 7

08

.12

RT

&L

T T

.O.P

.

EL

EV

. 7

06

.12

RT

&L

T T

.O.P

.

EL

EV

. 7

08

.14

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.21

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.12

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.62

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.97

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.62

RT

&L

T T

.O.P

.

EL

EV

. 7

07

.12

RT

&L

T T

.O.P

.

EL

EV

. 7

06

.62

100’ V.C.

K = 100

E = 0.13’

0.50%

0.89%

PV

I S

TA

. 1

63

+1

2.9

8

EL

EV

. 7

03

.69

PV

C S

TA

. 1

62

+6

2.9

8

EL

EV

. 7

03

.93

-0.50%

PV

C S

TA

. 1

60

+1

9.1

2

EL

EV

. 7

03

.98

170’ V.C.

K = 122

E = -0.29’

PV

I S

TA

. 1

61

+0

4.1

2

EL

EV

. 7

04

.73

ST

A. 159+

34.9

5

BE

GIN

CO

NS

TR

UC

TIO

N

MA

TC

H E

XIS

TIN

G P

VM

T.

RT

. &

LT

. T

.O.P

.

EL

EV

. 7

03

.23

RT

&L

T T

.O.P

.

EL

EV

. 7

05

.62

RT

&L

T T

.O.P

.

EL

EV

. 7

05

.12

RT

&L

T T

.O.P

.

EL

EV

. 7

04

.62

RT

&L

T T

.O.P

.

EL

EV

. 7

04

.12

RT

&L

T T

.O.P

.

EL

EV

. 7

03

.82

RT

&L

T T

.O.P

.

EL

EV

. 7

04

.25

RT

&L

T T

.O.P

.

EL

EV

. 7

04

.43

RT

&L

T T

.O.P

.

EL

EV

. 7

03

.81

EXISTING R.O.W.

C OF CUSTER ROAD (FM 2478)

MA

TC

H L

INE

ST

AT

ION

22

0+

00

N00^20’50"W

L

L

L

EXISTING GRADE 60’ RIGHT OF C

EXISTING GRADE 60’ LEFT OF C

EXISTING GRADE AT C

PROPOSED ROADWAY CONSTRUCTION

L

EXISTING ROADWAY

PROFILE LEGEND

PLAN LEGEND

Recommended