View
222
Download
0
Category
Tags:
Preview:
Citation preview
Existing Industry Structure
DfT
SRA Strategic Planning & Policy.Overall cost control. Franchisors
Network Rail TOCS RoSCOS PTEs Railway Inspectorate
HSE
TrackSignalsStations
Not for profit
Run TrainsManage Stations
Lease trainsto TOCs
Buy ServicesPrime Consultees
Contractors
JarvisCarillion
Etc.
How Important is Rail?
• 4343..5m bus journeys per year5m bus journeys per year <2m rail journeys<2m rail journeys• Station FootfallStation Footfall
– DarlingtonDarlington 1.7m/year1.7m/year– MiddlesbroughMiddlesbrough 1.0m/year1.0m/year– MartonMarton 3,000/year3,000/year– Gypsy LaneGypsy Lane 9,000/year9,000/year– NunthorpeNunthorpe 10,500/year10,500/year
• Destinations from MiddlesbroughDestinations from Middlesbrough– Redcar CentralRedcar Central 128,000/year128,000/year– DarlingtonDarlington 114,000/year114,000/year– SaltburnSaltburn 79,000/year79,000/year– Redcar EastRedcar East 75,000/year75,000/year– YorkYork 53,000/year53,000/year– NewcastleNewcastle 50,000/year50,000/year– HartlepoolHartlepool 50,000/year50,000/year
Tees Valley Rail Demand Study 2000
Frequency (per hour)Frequency (per hour)
RouteRoute CurrentCurrent OptimumOptimum
Hartlepool – NewcastleHartlepool – Newcastle 11 22
Hartlepool – MiddlesbroughHartlepool – Middlesbrough 11 33
Hartlepool – YorkHartlepool – York 00 11
Middlesbrough – SaltburnMiddlesbrough – Saltburn 22 44
Darlington – SaltburnDarlington – Saltburn 22 22
Middlesbrough – Newcastle ExpressMiddlesbrough – Newcastle Express 0.50.5 11
Middlesbrough – NunthorpeMiddlesbrough – Nunthorpe 0.330.33 11
Middlesbrough – YarmMiddlesbrough – Yarm 11 22
New Stations
Phase 1Phase 1 Phase 2Phase 2
HartHart NortonNorton
Old BillinghamOld Billingham Riverside StadiumRiverside Stadium
RoseworthRoseworth Nunthorpe Park & RideNunthorpe Park & Ride
The IngsThe Ings
James Cook HospitalJames Cook Hospital
Halcrow Timetable & Capacity Study
No Infrastructure WorkNo Infrastructure Work
30 mins North of Hartlepool30 mins North of Hartlepool
New Stations on Durham CoastNew Stations on Durham Coast
Esk Valley – double frequencyEsk Valley – double frequency
Darlington – Bishop Auckland (hourly)Darlington – Bishop Auckland (hourly)
Hartlepool – SaltburnHartlepool – Saltburn
Ings StationIngs Station
Halcrow Timetable & Capacity Study
Infrastructure Improvements RequiredInfrastructure Improvements Required
3 Trains South of Hartlepool3 Trains South of Hartlepool - Reopened platform- Reopened platform
Clockface Darlington to SaltburnClockface Darlington to Saltburn - New Platforms at Darlington- New Platforms at Darlington
Hartlepool - DarlingtonHartlepool - Darlington - New Platforms at Darlington- New Platforms at Darlington
Newcastle Express via StillingtonNewcastle Express via Stillington - Track & Signal upgrade- Track & Signal upgrade
Teesside Airport StationTeesside Airport Station - DDA upgrade- DDA upgrade
Yarm to NunthorpeYarm to Nunthorpe - Yarm Turnback- Yarm Turnback
More services through MiddlesbroughMore services through Middlesbrough - New Bay Platform- New Bay Platform
Where Are We Now?
• WithdrawnWithdrawn– Hartlepool to Newcastle half hourlyHartlepool to Newcastle half hourly– Hartlepool to York via MiddlesbroughHartlepool to York via Middlesbrough– Saltburn – Middlesbrough – Darlington – NewcastleSaltburn – Middlesbrough – Darlington – Newcastle– Esk Valley Winter SundayEsk Valley Winter Sunday
• Under ThreatUnder Threat– Cross Country North of YorkCross Country North of York– Half hour frequency on the East Coast Main LineHalf hour frequency on the East Coast Main Line
Short term Objectives
• Retain existing networkRetain existing network• Restoration of recent withdrawalsRestoration of recent withdrawals• Better Rolling StockBetter Rolling Stock• Hartlepool to York (e.g. by Virgin)Hartlepool to York (e.g. by Virgin)• Yarm – Middlesbrough – NunthorpeYarm – Middlesbrough – Nunthorpe
– James Cook University Hospital Station?James Cook University Hospital Station?– Park and Rail at Nunthorpe?Park and Rail at Nunthorpe?
• Middlesbrough Station Improvements (DDA Compliance)Middlesbrough Station Improvements (DDA Compliance)• Middlesbrough to Newcastle Express via StillingtonMiddlesbrough to Newcastle Express via Stillington• Airport StationAirport Station
Recommended