TECHNICAL SPECIFICATION
FOR
78M MAINTENANCE / ACCOMMODATION SUPPORT VESSEL
OWNER :
BUILDER :
HULL NO :
DESIGNER :
78M MAINTENANCE / WORKING VESSEL
- 2 -
SECTION CONTENTS PAGE 1 GENERAL 3 2 HULL STRUCTURE 13 3 ACCOMMODATION & COMPARTMENTATION 18 4 CORROSION PROTECTION 31 5 MACHINERY & PIPING 39 6 DECK MACHINERY & HULL FITTINGS 55 7 SAFETY SYSTEM / RESCUE EQUIPMENT 63 8 ELECTRICAL 66 9 NAVIGATION & COMMUNICATION SYSTEM 77 10 DYNAMIC POSITIONING SYSTEM 80
78M MAINTENANCE / WORKING VESSEL
- 3 -
SECTION 1 - GENERAL
100. Intent
This specification together with the GA drawing is intended to describe the construction
of a Maintenance / Accommodation Support Vessel completely outfitted and equipped
for following duties.
1) To support in Topside & Subsea Maintenance
2) To support in Offshore Engineering Project
3) External Fire-fighting
4) Rescue
The vessel will be registered as unrestricted service.
101. General Description
The vessel is to be all welded steel construction with twin diesel engines, twin CP
azimuth propellers. The vessel’s accommodation is to be located forward on the main
deck and deckhouse.
Vessel design shall comply with
MARPOL 12A concerning fuel oil tank double hull requirement
SPS Code 2008
MLC 2006
102. Principal Particulars
Length overall : 78.00M
Length BP : 69.60M
Beam moulded : 20.00M
Depth moulded : 8.00M
Draft designed : 6.00M
Draft scantling : 6.50M
Max deadweight : about 3,500t
Accommodation
78M MAINTENANCE / WORKING VESSEL
- 4 -
6 x 1-berth cabins : 6 men
19 x 2-berth cabins : 38 men
40 x 4-berth cabins : 160 men
Total : 204 men
Tank capacity (approx)
Fresh water : 1,000 m3
Fuel oil : 1,300 m3
Water ballast (including D.W.): 2,000 m3
Drill water : 1,400 m3
Foam : 10 m3
Sewage Holding : 50 m3
Grey water : 50 m3
Dirty oil : 15 m3
Bilge : 30 m3
Hyd. oil : 30 m3
Working deck space : Abt. 800 m2, design load 10 t / m2
Engines / Propellers : 2 x 2,660 kw, c/w CPP azimuth propellers
Trial Speed : 12 knots at trial condition, 100% MCR, at design
draft and sea state two (2)
Deck height : 3,200mm between main deck and 1st deck.
2,800mm between 1st deck / 2nd deck / 3rd deck /
4th deck / navigation bridge deck.
3,000mm between navigation bridge deck and
compass deck
103. Classification
ABS +A1 (E) Offshore Support Vessel,
(FFV 1,
SPS),
+ AMS
+ DPS-2
78M MAINTENANCE / WORKING VESSEL
- 5 -
104. Registry
The vessel to be registered under Singapore flag.
105. Regulations
The vessel is to comply with: - a) Maritime Regulations of the Country of Registry b) International Loadline Convention 1966 and subsequent amendments c) Radio Communication Regulation to Government regulations d) SPS Code 2008 e) International Convention of Prevention of Collisions at Sea 1972. f) International Tonnage Admeasurement Convention 1969.
g) MARPOL 73/78 and subsequent amendments h) Solas 1974 and subsequent amendments i) IMCA Guideline for Dynamic Positioning Class 2 j) The Merchant Shipping (Non-convention Ship) Safety Regulation k) International Oil Pollution Prevention (1991) Act and Relevant Regulations
where applicable. l) Institute of Electrical & Electronics Engineer Applicable Marine Regulations
(Code 45). m) Latest International Tele-communication Convention (Radio Regulations)
GMDSS Regulation Area 3 n) Marine Labor Convention (MLC) 2006, with exemption from requirement on
individual sleeping room for each sea farer. o) IMO 468 (XII) Code on noise level onboard ships p) Class requirements q) MSC. 256(84) 2008 Means of Embarkation and Emergency Towing Procedure r) Solas Chapter II-2 and Part A of the ISPS Code s) PSPC requirement concerning dedicated water ballast tank coating
106. Certificates The following certificates are to be supplied to the owners at the time of delivery of the
vessel. 1) Builder’s certificate 2) Keel Laying Statement
78M MAINTENANCE / WORKING VESSEL
- 6 -
3) Classification Certificate (Hull and Machinery) 4) Cargo Ship Safety Equipment Certificate 5) Cargo Ship Safety Construction Certificate 6) International Tonnage Certificate 7) International Loadline Certificate 8) Cargo Ship Safety Radio Certificate 9) Cargo Gear Register
10) Deviation Table for both standard & steering compass 11) MARPOL Certificate & I.O.P.P. 12) MARPOL Certificate (Annex IV Sewage) 13) MARPOL attestation for Garbage Pollution Prevention 14) Sparks Free Certificate 15) Asbestos Free Certificate 16) Anti-fouling Certificate c/w Record of Anti-fouling System 17) International Air Pollution Prevention Cert 18) Noise & Vibration Measurement Statement of Fact Issued by Class 19) FMEA document & DP operation manual
107. Materials & Workmanship a) All materials and workmanship are to be of the acceptable quality. All steel
plates, sections, hull forging and castings are to meet classification’s requirements and supplied with test certificates where required by classification. All visible steel plates are to be smooth or straight where applicable.
b) All woods used to be suitable for the intended purpose and of acceptable quality. All timber to be free from nodes and well seasoned.
c) All smith work or fabricated fittings to be of neat design, strong, smooth & free from defects.
d) All castings to be of acceptable quality, close grained and free from all cracks, blow holes and other defects.
Steel castings to be manufactured to classification requirements and approval where required.
e) In case the thickness of steel plates and sections specified in the drawings by the consultant are not available, the Builder is to, with the approval of owner and class, substitute them with thicker plates and sections.
f) Bolts and nuts in exposed area to be SUS 316 material unless noted otherwise.
78M MAINTENANCE / WORKING VESSEL
- 7 -
108. Welding Vessel to be of all welded construction, in accordance with contract plans, specifications,
classification. Welding to be in accordance with classification requirements. All steel used to be of
good welding quality, free from laminations or other harmful defects and be class approved. Electrodes to be selected from classification approved lists. Welding schedules to meet classification requirement/standard. High standards of up-to-date welding practice and procedures are to be applied, associated with accurate alignment, fairness, edge preparation and gap widths.
Where possible, structure should be pre-fabricated in assemblies and sub-assemblies to
give the maximum possible amount of down hand welding. All welds which are liable to be exposed to sea water including all deck fittings,
external ladders and treads, bulwark stays, load line and draft marks etc. are to be of continuous type.
109. Inspection / Supervision
Throughout the construction period prior to the delivery, the surveyors, owner’s
representative and consultants are to be given free access to the Builder’s yard during
normal working hours for supervision and inspection. Shipyard to provide and maintain
permanent cleanliness, good house keeping and safety onboard during construction
period. Spilled oil shall be removed promptly. Garbage shall be removed daily and
lighted access shall be provided throughout the vessel.
110. Tests
Prior to the delivery, the hull, all machinery, electrical, piping, all equipment installed,
machinery and deck fittings, domestic equipment are to be thoroughly tested to class
requirement in the presence of the classification’s attending surveyor, owners and/or
their representative. The Builder is to submit a program for dock and sea trials to the
Owner and class two weeks before the start of the trials for their approval.
78M MAINTENANCE / WORKING VESSEL
- 8 -
111. Inclining Experiment
An inclining experiment which will ascertain the lightship weight and the vertical centre
of gravity at lightship condition is to be carried out by the Builder with the presence of
classification surveyor. Basing on these results, a final stability report including both
intact stability including crane operation conditions and damage stability are to be
prepared by the consultant for classification approval.
112. Dock Trials
Upon the completion of the vessel, the following trials are to be carried out:
1) All piping systems are to be fully tested, including the checking of valve name
plates.
2) Electrical power plants together with all lights
3) Auxiliary machinery
4) All deck machinery
6) Air-conditioning machinery
7) All pumps etc.
113. Sea Trial
Sea trial is to be arranged and carried out in accordance with a program approved by the
class/owners. The Builder is to supply a master, crew, all victuals and necessary
equipment and arrange the catering. The compass is to be adjusted during sea trial.
a) Speed Trials
Speed trials shall be conducted over a recognised measured mile in deep water.
Two (2) double runs are to be made with the engines running at maximum
continuous revolutions (100% MCR). Records of main engine operation
parameters (temperature and pressure), engine revolutions are to be taken.
b) Endurance Trials
Endurance trials of 4 hours with the engines developing 100% MCR output are
to be carried out in conjunction with speed trials according to class requirements.
c) Steering Trials
Steering trials are to be carried out with normal electro-hydraulic with engine at
100% MCR. The diameter of the turning circle and the time taken to complete a
full circle are to be recorded.
78M MAINTENANCE / WORKING VESSEL
- 9 -
d) Stopping & Astern Trials
With the vessel proceeding ahead at full power the main engine, controls are to
be moved from `full ahead’ to `full astern’ and the following records taken:
1) Time to bring the vessel to stop.
2) Distance run between initiation of order and stopping of vessel.
3) Time to a steady astern condition.
During the astern trial the vessel is to be inspected for occurrence of local
vibration.
e) Anchor trials
To be carried out in accordance with Classification Society and Owner’s
requirements.
f) DP trials
DP trials to be carried out in accordance with trial procedures to Classification
Society and Owner’s requirements.
114. Environmental Conditions
The vessel, plant, machinery and equipment, their components and related systems shall
be entirely suitable for service under the following conditions:
Ambient air temperature : 45 °C (max) in Summer, 0 °C (min) in Winter
Relative humidity : 95 % (max)
Sea water temperature : 32 °C (max) in Summer, 5 oC (min) in Winter
115. Delivery
Delivery of the vessel is to be taken afloat at Builder’s quayside.
116. Drawings
On completion, three (3) sets of the drawings in printed form approved or noted by the
classification as well as soft copy in CD, are to be supplied but not limited to the
following: -
1) General Arrangement
2) Hydrostatic Curves
3) Cross Curves
4) Stability Report
78M MAINTENANCE / WORKING VESSEL
- 10 -
5) Docking Plan
6) Tank Sounding table
7) Engine Seating Detail
8) Forward Hull Structure
9) Aft Hull Structure
10) Shell Expansion
11) Superstructure Details
12) Shafting Arrangement
13) Engine Room Layout
14) Shaft Support Detail
15) Bilge, Ballast & Firemain / Deck Wash System
16) Ship’s Fuel System
17) Engine Cooling System
18) Domestic FW & Sanitary System
19) Position of Tank Vent, Sounding & Filling Pipes
20) Schematic Wiring Diagram and Reference to Fittings
21) Main Switchboard Wiring & Short Circuit Calculations etc
22) Ventilation Arrangement
23) Safety Plans
24) Complete set of electrical diagrams
25) Structural Strength Calculation for Machineries and Equipment Foundation as
required by Class
117. Manuals of Machinery & Equipment
Four (4) sets of manual of major machinery and equipment in the English language are
to be supplied by the Builder for equipment provided by Builder.
118. Spare Parts
Spare parts for all equipment are to be provided according to Class requirements and
maker’s recommendation.
119. Noise & Vibration
The Builder is to pay particular attention avoiding undue resonance, and excessive
78M MAINTENANCE / WORKING VESSEL
- 11 -
noise and vibration that may arise on the Vessel during normal operation, particularly
in accommodation and service spaces. Sound absorbent material to be applied
wherever necessary.
Noise level criteria are to be in accordance with IMO Res. A 468 XII Code on Noise
level Onboard Ships.
Noise level measurements shall be carried out on the sea trials when
Vessel running ahead steadily at normal continuous rating of the main engine
without tunnel thrusters in operation.
Vessel in DP mode with bow thrusters on 40% load (For record purpose).
120. Plan for Approval
Prior to starting work, the Builder shall submit the specified working plans to the
Owner and/or the regulatory bodies for approval.
The list of the plans for approval shall be mutually agreed between the Owner and the
Builder.
Plans for approval shall be submitted in electronic copy to the Owner for comments
and approval. Comment if any shall be returned to the builder from the Owner within
5 working days after receiving. Any comments / approvals by Owner does not release
the responsibility of the Builder to comply with the requirement of relevant rules/
regulations.
The designer will amend/incorporate the owner, builder and class comments into the
drawings.
When any other plans or technical information such as detailed working plans are
requested by the Owner’s representative in addition to the list of plans, the Builder shall
show or submit them for reference.
The Builder’s standard plans and the subcontractor’s or the manufacturer’s plans may
be used as working plans for approval.
121. Standard, Material & Workmanship
Materials, machinery and equipment to be generally in accordance with ISO standards, JIS standards, IEC Standards and DIN standard, unless specifically agreed or stated herein. All material, machinery and equipment used in the construction of the Vessel are to be new and unused, of acceptable shipbuilding quality, suitable for the intended service
78M MAINTENANCE / WORKING VESSEL
- 12 -
and approved by the Owner and the Classification Society. All workmanship is to be of acceptable shipbuilding standard, and is to be to the satisfaction of the Owner. Welding to comply with class requirements. All equipment and major components are to carry permanent identification integrally cast-in, hard-stamped or engraved on a permanently secured non-corrodible plate. The identification is to show, at minimum, the manufacturer’s name or trade name, model type, size and rating. Associated instruments, gauges or metering devices must be of acceptable quality, fit for the intended purpose, non-corrodible and delineated in metric or S.I. units. All temporary construction equipment such as mounting lugs etc. is to be carefully removed by flame-cutting, re-welding and grinding flush and coated in accordance with paint manufacturer’s recommendations. Any equipment place in the Vessel, either permanently or temporarily, is to be protected from damage from all causes during the construction phase. Any item accidentally and physically damaged is to be removed and renewed in its entirety. The Builder is to ensure that all material, equipment and components delivered to his premises for use in construction or outfitting of the Vessel, and forming part of his Contract with the Owner, are to be officially logged into his premises and clearly identified. The material and components are to be stored under cover and properly protected from direct sunlight, rain, dust, insects or rodent attack, and during cold weather to be properly heated and ventilated to prevent deterioration of equipment or its components. All material and equipment are to be always accessible for inspection by Owner and,
if considered necessary, to be moved to more secure or a better-protected environment
shall any deterioration be apparent or considered likely to occur.
122. Tests & Trials for Subsequent Vessels
Above-mentioned tests and trials to be conducted for each subsequent vessel, except
inclining test is for first vessel only, provided the lightship weight and the LCG of the
subsequent vessels fall within the classification requirements.
123. Vessel Operation Manual
To be compiled by Owner according to their operation practice, with necessary input
from designer and preparation work to comply for inspection to be supported by the
78M MAINTENANCE / WORKING VESSEL
- 13 -
builder.
124. DP Operating Conditions at Sea
The maximum sea conditions that the vessel is capable to operate with DP mode shall be
determined by the DP plot generated by the DP system supplier, basing on the thrusters
capacity as mentioned in this specification.
78M MAINTENANCE / WORKING VESSEL
- 14 -
SECTION 2 – HULL STRUCTURE
200. General
The steel hull and deckhouse are to be of all welded construction. Longitudinal framing
system is to be adopted in principle while transverse framing may be used at certain
locations to optimize structural configuration.
201. Keel
A flat plate keel is to be fitted.
202. Stem Bar
The stem is to be made up by thick vertical plate.
203. Skeg
A box shape skeg is to be fitted at the centreline.
204. Bottom Construction
The bottom is to be of double bottom except in part of the forward and aft area where
single bottom construction is to be adopted. In order to give a structural continuity in the
bottom, two engine girders P&S, together with the centre girder are to be extended as
far forward as possible and are to be linked with the longitudinal bulkheads of the tanks.
205. Shell Plating
The bottom and side plating are to be longitudinally plated, to have welded butts and
Seams.
206. Frames
Frames for main hull and 1st deck are to be bulb plate spaced at class requirement and to
be toe welded to the shell plating. Strong transverse ring frame (or web) / stringer is to
be fitted when necessary.
78M MAINTENANCE / WORKING VESSEL
- 15 -
207. Longitudinals
Longitudinals for main deck are to be bulb plate fitted at proper spacing. They are to
incorporate with strong beams of fabricated section fitted in way of deck openings and
other locations.
208. Girder & Pillars
Girders of fabricated sections together with pipe pillars are to be fitted in engine room.
209. Engine Girders
Engine girders are to be fitted. Resin chocks are to be used for engine and gear box
mountings according to makers and class requirements.
210. Decks
Deck plate thickness is to class requirement. Insert plate is to be fitted in way of heavy
equipment foundation.
Doubling plates are to be fitted under bollards and forward bulwark stays.
Aft deck and structure below to be specially reinforced in way of main crane pedestal.
211. Watertight / Oiltight Bulkheads
The W.T. / O.T. bulkheads are to be plated horizontally.
212. Future Moonpool
Future moonpool to be arranged in aft midship. Before opening of deck and bottom,
the future moonpool to be used as fuel oil tank.
Hull scantling at midship to be sized on the basis that deck and bottom plates are
removed.
213. Wheelhouse
The wheelhouse is to have 8mm plate for the front, 8mm for sides and top with angle
bar for vertical stiffeners and beams respectively.
214. Deckhouse
The deckhouse’s front plate is to be 8mm. The top, sides and aft end bulkhead are to be
78M MAINTENANCE / WORKING VESSEL
- 16 -
8.0mm. Stiffener and beam to be angle bar with size to class requirements.
Non-tight steel cover to be provided above 2nd deck forward mooring area.
215. Exhaust Casing
To be made of 8mm plate with angle stiffeners.
216. Bilge Keels
Two (2) bilge keels made of 340 x 12 Bulb plate are to be fitted.
217. Steel Fenders
750mm wide 15mm thick double plates are to be welded to upper side shell as shown on
the G.A.
Rubber fenders see section 6.
218. Crash Rail
Box shaped crash rail to be fitted above main deck, with handrails on top fitted
longitudinally along the 1st deck.
Sufficient freeing ports to be provided at lower part of the crash rail, opening area to class
requirement.
Insert plates with at least 50% extra thickness to be fitted at crash rail outboard in way of
D type rubber fenders.
Inboard of the crash rail to be open with pillars.
At outboard of the crash rail, openings to be provided in way of
- bollards, where the edge of the openings to be fitted with 3/4” round bar
- rescue zones
219. Drain Plug
Drain plugs of 42mm diameter with stainless steel 316 housing and bronze screw are to
be fitted in all tank compartments adjacent to hull bottom.
Two (2) sets each of square and hexagon spanners to be supplied.
220. Heeling Tanks
WB wing tanks shall be also used as heeling tanks to counter the heeling moment
78M MAINTENANCE / WORKING VESSEL
- 17 -
during lifting operation. The tank pumping to be by bilge / ballast and fire / GS pump.
221. Support For Helideck
To enable future installation of aluminum helideck suitable for operation of Sikorsky
S92 type helicopter, the under-deck structure at vessel bow to be suitably reinforced
in way of supporting legs of helideck.
222. Anti-rolling Tank
No. 2 and No. 8 water ballast tanks also used as anti-rolling tank. Tank dimension and
internal structure to be reviewed by anti-rolling system supplier. One(1) Sensor spare
for each type to be supplied .
223. Permanent Solid Ballast
To limit vessel list within acceptable range for crane operation, if necessary
permanent solid ballast of cement / scrap steel to be put in No. 9 WB/DW tank (S).
Weight of the permanent solid ballast to be minimized.
224. HIPAP Trunk
Watertight HIPAP trunk is provided at location shown in GA, size 1,200mm x
1,400mm minimum. Access by WT door with open -close indication in wheel house
and vertical ladder to be provided inside.
78M MAINTENANCE / WORKING VESSEL
- 18 -
SECTION 3 – ACCOMMODATION & COMPARTMENTATION
300. General The accommodation is to be arranged and fitted out generally in accordance with the General Arrangement drawing. Scheme of decoration together with colour scheme and samples of all decorative materials and finishes such as furnishing fabrics, plastic laminates, deck covering, paints etc. are to be submitted to the owners for approval prior to purchase. Modular toilet unit is to be provided for each cabin. Separate mess room is to be provided for crew and special personnel onboard. Fire rating of partition and insulation to SOLAS requirement. Cabin and wheelhouse clear height to be as far as practical 2,050mm.
301. Deck Coverings Steel decks are to be thoroughly cleaned and mastic coated before the installation of
deck coverings which are to be laid under all furniture. Schedule of Deck Coverings Wheelhouse top & wheelhouse Deck exterior & main deck : non skid deck paint Wheelhouse interior : 3mm thick vinyl sheet on latex Mess & passageways : 3mm thick vinyl sheet on latex Crew’s cabins : 1.8mm thick vinyl sheet on latex Washrooms and galley : 12” ceramic tiles on cement Engine room : steel chequer plate on top of floor bearers. Steering gear compartment : aluminum chequer plate on top of floor bearers (if
headroom permits) Deck Stores : non skid deck paint Provision stores : wood gratings on painted steel 302. Minor Bulkheads & Lining All steel minor bulkheads are to be lined with non-combustible material. Free Standing
bulkheads are to be non-combustible material. Internals of wash place to be painted.
Galley is to be lined from deck to deck head with non-combustible material and
stainless steel finishing. No lining for machinery spaces.
78M MAINTENANCE / WORKING VESSEL
- 19 -
303. Insulation
All exposed steel work is to be insulated on the inside with min. 50mm thick glasswool
and retained behind the linings. Min. 100mm thick for funnel bulkhead adjacent to
accommodation areas.
1) Wheelhouse & deckhouse : deckhead and sides
2) Main deck cabins : exposed deckhead, bulkheads and sides
3) Underdeck cabins : exposed deckhead, bulkheads and ship
sides.
4) Air conditioning room : bulkheads and sides
In way of living spaces on main deck, such as mess rooms, changing room / laundry,
hospital, galley etc, deck insulation with high noise reduction, such as floating floor or
equivalent to be laid.
Fire insulation arrangement to comply with class requirements.
304. Windows & Portlights
Windows to be fitted for wheelhouse and upper three tiers of deckhouse, other weather-
exposed areas to be fitted with portlights of 300mm dia. wherever necessary.
Wheelhouse windows are to be in accordance with International or National marine
standards in which the design pressures are given in terms of the windows
longitudinal location and height above the design waterline.
The thickness of the toughened safety glass is to be determined from the equations in
the standard based on design pressure and size of window. Windows are to be fitted
from the outside.
Polarized or tinted windows are not to be fitted. Retractable solar film blind to be
provided for the wheel house windows.
All windows are to be steel framed type. Portlights are to be steel frame type with
deadlight. All windows and portlight frame work to be of fibre glass or wood material.
305. Steel Doors
All external doors, except stainless wheelhouse doors, to be of steel with coaming
heights according to the loadline requirement, fitted with security latch internally as per
ISPS code requirement.
78M MAINTENANCE / WORKING VESSEL
- 20 -
Single action six dogs workable from both sides are to be fitted with clips and grease
fittings. The doors to be channel-framed tightened to gaskets of soft neoprene or similar.
Doors to be fitted with sturdy padlocks and hold-back hooks to retain them in open
positions.
Wheelhouse doors to be stainless steel type.
Eye brows to be fitted above weather doors without deck overhang.
306. Carpenter’s Work
All external doors are to be in steel complimented with composite doors installed with
400mm diameter see-through class except the wheelhouse doors. All internal doors to
be self closing type provided with rubber stoppers to prevent rattling, device hold-back
hooks to retain the doors in open position. Hardware to be of brass or chrome. Hinged
doors with large windows in wheelhouse. Store rooms to be provided with steel shelves
with retaining bars.
Arrangement of shelves, etc. to be sufficient for the intent of each store room. Ceiling in
accommodation and navigation spaces are to be of non-combustible type.
307. Wheelhouse
The wheelhouse is to be located on navigation bridge deck as per GA and to be fitted
with all navigation, communication and control equipment. The helmsman’s position at
the centre and directly behind the console fitted at forward and aft of the wheelhouse.
Wheelhouse windows are to be arranged to give maximum visibility all round. The
compass is to be located above the forward steering position.
One (1) toilet with one (1) toilet seat, one (1) wash basin and one (1) extractor fan to be
provided in wheelhouse.
An open pantry space to be provided, with L-shape sideboard.
308. Master’s Cabin
The Master’s accommodation cabin to be arranged at 4th deck. Cabin to comprise with
attached toilet compartment, fitted generally with the following:-
Bed room
- 1 built in berth with inner dimension 2,100x1,200, with drawers under and
reading light
78M MAINTENANCE / WORKING VESSEL
- 21 -
- 1 wardrobe
- 1 module toilet
- 1 rectangular window with dead light and curtain
Day room
- 1 3-person sofa
- 1 knee-hole desk with drawers
- 1 desk chair
- 1 coffee table
- 1 small refrigerator
- 1 book rack
- 1 clock
- 3 hat and coat hooks
- 1 rectangular window with dead light and curtain
- 4 spare power sockets
- 1 waste bin
- 1 key box (wall mounted)
- 1 safe box
Attached Toilet (Module Type)
- 1 washbasin (hot and cold water)
- 1 toilet paper holder
- 2 towel hook
- 2 tumbler rack
- 1 pedestal WC (European type) with seat, lid, toilet roll holder and grab rail.
- 1 shower with plastic curtains on rail, soap dish, grab rail, pre-mix temperature
mixer for hot and cold water
- 1 mirror cabinet
- 1 waste bin
- 4 coat hooks
- 1 WC cleaning brush with holder
- 1 flushing hose with nozzle
- 1 spare power point
- 1 extractor fan
78M MAINTENANCE / WORKING VESSEL
- 22 -
309. Chief Engineer’s Cabin
The Chief Engineer’s accommodation is to be fitted out generally as per Master’s cabin
except key box and safe box.
310. Attached Washroom for Cabins
Module type washrooms attached to each cabin are to be fitted out generally as
follow: -
- 1 shower fitted with plastic curtain, soap dish, grabrail and pre-mix temperature
mixer for hot and cold water
- 1 china washbasin with hot/cold water supplies
- 1 extractor fan
- 1 toilet paper holder
- 2 towel hooks
- 2 tumbler racks
- 1 waste bin
- 1 WC cleaning brush with holder
- 1 flushing hose with nozzle
- 1 mirror cabinet
- 1 spare power point
- 4 coat hooks
- 1 pedestal WC (European type) with seat, lid & toilet roll holder & grabrail.
311. One Berth Cabin
The cabins are to be arranged on superstructure decks for Officers, and to be fitted
generally with the following:-
- 1 built in berth with inner dimension 2,100x900, with drawers under and reading
light
- 1 wardrobe
- 1 built in settee for 2 person - 1 coffee table - 1 kneehole desk with drawers - 1 desk chair - 1 book rack
78M MAINTENANCE / WORKING VESSEL
- 23 -
- 1 clock - 1 waste bin - 2 hat and coat hooks - 4 spare power sockets - 1 rectangular window with dead light and curtain Partition to be fitted between sleeping space and living space wherever practical as shown in GA.
312. Two Berth Cabin
Cabins to be arranged as shown on the General Arrangement Drawing, each fitted generally with the following:- - 1 built-in two-tier double or 2 built-in single wooden berths with inner dimension
2,100x900 with plywood bases and drawers under - 1 reading light for each berth - 2 lockers - 1 book rack - 2 sets berth curtain rails - 1 waste bin - 1 kneehole desk with drawers - 1 chair - 4 spare power sockets - 4 coat hooks - 1 rectangular window with deadlight and curtain
313. Four Berth Cabin
Cabins to be arranged as shown on the General Arrangement Drawing, each fitted generally with the following:- - 2 built-in two-tier wooden berths with inner dimension 2,100x900 with plywood
bases and drawers under lower tier - 1reading light for each berth - 4 lockers - 1 book rack - 4 sets berth curtain rails - 1 waste bin - 1 kneehole desk with drawers - 1 chair
- 4 spare power sockets
78M MAINTENANCE / WORKING VESSEL
- 24 -
- 4 coat hooks - 1 rectangular window with deadlight and curtain
314. Mess Rooms Crew mess
Crew mess room situated on the main deck is to be generally fitted out as shown on the
GA: -
- Dining tables c/w formica top and edge fiddles
- 6 spare power points
- 16 upholstered chairs
- 1 sideboard with drawer
- 1 clock, battery quartz type
- 1 commercial four-slot toaster
- 1 900 watt microwave oven
- 1 200 litres refrigerator
- 1 hot & cold water dispenser, 2.5l/hr
- 1 32” LED TV and DVD player
- 1 commercial coffee machine
PAX mess
PAX mess room situated on the main deck is to be generally fitted out as shown on the
GA: -
- Dining tables c/w formica top and edge fiddles
- 10 spare power points
- 80 upholstered chairs
- 1 sideboard with drawer
- 1 clock, battery quartz type
- 4 commercial four-slot toaster
- 2 900 watt microwave oven
- 2 250 litres refrigerator
- 1 bain marie with 8 pans
- 1 salad bar (6 frame)
- 2 twin tub juice dispencer
78M MAINTENANCE / WORKING VESSEL
- 25 -
- 2 hot water urn of 25 litre each
- 1 50” LED TV and DVD player
- Ice maker
- Ice cream maker
- 1 drinking fountain
- 2 commercial coffee machine
- 1 book shelf
315. Recreation Rooms
Recreation room 1
Recreation room 1 situated on 3rd deck is to be fitted out generally as shown on the
GA: -
- 1 L-shape 10-seat sofa
- 2 coffee tables with formica top
- 4 spare power points
- 1 clock, battery quartz type
- 1 sideboard with drawer
- 1 book shelf
- 1 32” LCD TV & DVD player
- 1 white notice board
Recreation room 2
Recreation room 2 situated on the 2nd deck is to be fitted out generally as shown on the
GA: -
- 1 L-shape 8-seat sofa
- 2 coffee tables with formica top
- 4 spare power points
- 1 clock, battery quartz type
- 1 sideboard with drawer
- 1 book shelf
- 1 32” LCD TV & DVD player
- 1 white notice board
78M MAINTENANCE / WORKING VESSEL
- 26 -
316. Conference Room
To be located on bridge deck and fitted out generally as shown on the GA-
- 1 meeting table
- 15 meeting chairs
- 1 sideboard with drawer / sliding door
- 1 white writing board
- 1 deck with chair
- appropriate 4-tier file cabinet
- 4 spare power points
- 1 clock, battery quartz type
- 1 projector with screen
- 15 coat hooks
- 1 LAN socket
317. Offices
Superintendent office (Main deck)
- 3 decks with drawer
- 3 chairs
- 2 sideboard for filing with drawers
- 2 open shelf for filing, on top of sideboard
- 4 spare power points
- 1 clock, battery quartz type
- 1 waste bin
- coat hooks
- 1 white board
- Auto telephone
- 1 LAN socket for each desk
- 1 desk light for each desk
Ship office (1st Deck)
- 2 decks with drawer
- 2 chairs
- 2 sideboard for filing with drawers
- 2 open shelf for filing, on top of sideboard
78M MAINTENANCE / WORKING VESSEL
- 27 -
- 4 spare power points
- 1 clock, battery quartz type
- 1 waste bin
- coat hooks
- 1 white board
- Auto telephone
- 1 LAN socket for each desk
- 1 desk light for each desk
Charterer office (Bridge deck)
- 2 decks with drawer
- 2 chairs
- 2 sideboard for filing with drawers
- 2 open shelf for filing, on top of sideboard
- 4 spare power points
- 1 clock, battery quartz type
- 1 waste bin
- coat hooks
- 1 white board
- Auto telephone
- 1 LAN socket for each desk
- 1 desk light for each desk
General office (Bridge deck)
- 2 decks with drawer
- 2 chairs
- 2 sideboard for filing with drawers
- 2 open shelf for filing, on top of sideboard
- 4 spare power points
- 1 clock, battery quartz type
- 1 waste bin
- coat hooks
- 1 white board
- Auto telephone
- 1 LAN socket for each desk
78M MAINTENANCE / WORKING VESSEL
- 28 -
- 1 desk light for each desk
Construction office (Bridge deck)
- 2 decks with drawer
- 2 chairs
- 2 sideboard for filing with drawers
- 2 open shelf for filing, on top of sideboard
- 4 spare power points
- 1 clock, battery quartz type
- 1 waste bin
- coat hooks
- 1 white board
- Auto telephone
- 1 LAN socket for each desk
- 1 desk light for each desk
318. Medic / Hospital
The medic / hospital on main deck shall have medical supplies in accordance with
Class requirements for the number of personnel on board. To be situated on main deck
and to be fitted out generally as follows:
Medic
- 1 single berth
- 1 single door locker
- 1 desk
- 2 chair
Hospital
- 2 medical beds, 1 fixed, 1 movable with lockable wheels, and to be fitted with
emergency call facilities to wheelhouse
- Medical Chest in accordance to Class
- 1 4-drawer steel cabinet
- 1 unit toilet with bath tub
- 1 80 liter refrigerator
- 1 sink hot/cold water
78M MAINTENANCE / WORKING VESSEL
- 29 -
319. Deck Store
Stainless steel shelves are to be fitted.
320. Laundry / Changing Room
The laundry / changing room situated on the main deck is to be fitted out generally as
follows: -
- 2 wash basins with cold and hot freshwater taps and soap dishes
- 1 oil skin
- 3 Heavy duty industrial washing machine (approx. 12 kg)
- 3 Heavy duty industrial spin dryer (approx. 15 kg).
- 4 spare power points
- 1 foldable ironing board
- 1 deep bowl sink with cold and hot freshwater taps
- 60 lockers arranged in two tiers, each 1,000mm high, with lock
- 1 shower cubical
- 1 toilet cubical
- 1 long wood bench with stainless steel legs
- 2 Portlights with deadlight
321. CO2 Room
This compartment is to store the CO2 bottles. Force exhaust to be arranged. CO2 room is
to comply with class requirements.
322. Galley
The galley situated on main deck is to be fitted out generally as follows:
- 3 stainless steel 4 hot plate marine electric range c/w large ovens fitted with batten
arrangements to prevent movement of pans, and with stainless steel exhaust canopy
over.
- 1 grill table
- 1 bread oven
- 2 stainless steel twin bowl deep sink with shelves, lockers under and plate racks over,
and flexible mixer tap with hose.
- Assorted cupboards, workbenches, plates rack, etc – in stainless steel.
78M MAINTENANCE / WORKING VESSEL
- 30 -
- 8 power sockets
- 2 double-door commercial refrigerator of min. 400 L, with stainless steel external
finishing.
- 1 food waste disposal to be fitted below sink
- 1 Commercial food mixer
- 2 Rice cooker
- 2 Commercial type dishwasher
- 2 Commercial deep fryer comply with class requirement, with fire extinguishing
system.
- 2 hot water urn, 19l
- 1 garbage compactor
- 1tilting frying pan
- 2 Portlights with deadlight
- 1 microwave oven
- 1 food mixer
323. Provision Store
This compartment is to be fitted with Stainless steel shelves c/w retaining battens.
Composite grating is to be fitted on floors. Lock for the door. Provision room bulkhead
and deckhead shall be painted. Air-conditioning is to be provided for the store.
324. Chiller / Freezer Room (walk in type)
See section 5.
325. Bosun Store
The bosun store incorporated with the chain lockers is to be situated forward of the
collision bulkhead on 1st deck and fitted out with steel shelves and hooks.
326. Engine Room
The engine room is to house all machinery and equipment at convenient locations
described elsewhere. Steel chequer plates of 4.5mm are to be used for flooring secured
with galvanised steel self trapping screws to steel bearers and fitted with hand grib as
necessary.
78M MAINTENANCE / WORKING VESSEL
- 31 -
All moving parts to be provided with guards or rails or both. Portable handrails to be
provided in strategic positions for protection of crew’s safety. Workbench to be fitted at
suitable location.
One common battery operated telephone to be fitted. Marine clock and clinometer to be
suitably positioned.
Engine room store and workshop to be separated out with wire mesh wall and doors.
Steel shelves to be provided in engine room store.
327. Steering Gear Compartment
This compartment is to be fitted out with steering gear. Common battery operated
telephone to meet classification requirement to be fitted.
328. Air Conditioning Rooms
Two (2) Air Handling Unit (AHU) Rooms to be provided to house the air
conditioning unit, located as per the General Arrangement Plan. Lightings, ventilation
ducts and scupper pipe to be provided.
329. Engine Control Room
Engine control room is to be equipped with:-
• Main switchboard
• Machinery control console (MCC)
• Office desk
• Office chair
• power points
• Book shelves
• One (1) packaged air-conditioner, sea water cooled.
High Voltage Insulated rubber mats to be placed in front the switchboard.
330. Bow Thruster Compartment
This compartment is to be fitted with bow thruster machinery with suitable forced
ventilation. Flooring to be 4.5mm aluminum chequer plates.
331. Utility Trunks
78M MAINTENANCE / WORKING VESSEL
- 32 -
In deckhouse, trunk through decks to be provided for laying of piping, cable and air
duct.
Watertightness to be maintained at each deck, deck penetrations to be provided when
piping / cable / air duct pass through decks.
At each deck level openings with portable panels to be provided for each trunk for
personnel access during installation and maintenance.
332. Paint Store
To be provided on main deck and fitted with steel shelves. Local fire fighting with sea
water from deck wash line to be provided. Electrical fittings / lights to be explosion
proof type.
333. Incinerator / Garbage Room
To be provided on 1st deck.
334. Pray Room
To be provide on 1st deck, with carpet and compass.
335. Gym
To be provide on 2nd deck, with two (2) motorized tread mills, one (1) weight lift,
one (1) exercise bike and one (1) rowing machine. Equipment to be supplied by
Owner.
Appropriate power sockets to be provided.
Full height mirror to be fitted at aft bulkhead.
336. Smoking Room
To be provide on 2nd deck, with mechanical exhaust fan with 15 air-changes per hour.
Air-conditioning to be provided without return air. To be provided with wood benches.
78M MAINTENANCE / WORKING VESSEL
- 33 -
SECTION 4 - CORROSION PROTECTION
400. General
All de-scaling, shop-priming, de-rusting and painting work shall be carried out as
outlined below.
Dedicated water ballast tank, i.e. No.l W.B./D.W tank, No.8 W.B./D.W.(C) tank, No.9
W.B./D.W.(P&S) tanks and No.10 W.B./D.W. (P&S) tanks, surface preparation, paint
application, painting scheme etc. to comply with PSPC requirement.
The paint scheme is to be based on design life of three (3) years except for areas
under PSPC requirement.
A detailed painting scheme based on the standards specified below shall be prepared
by the builder to owner’s approval. The chosen colours are based on the available
standard colour shade of the supplier of coating material, but all exterior paints
according to Owners standard colour shades.
Paint application should be in accordance with paint supplier’s recommendations.
Deviations or changes that prove to be required during execution of the work will be
agreed jointly between the supplier, builder and Owner regarding necessary measures
for the performance of work. On the event that the temperature conditions necessary
during application are impossible to achieve, alternative coating system as
recommended by supplier of coating material will be applied, subject to Owner’s
approval.
Steel structure surfaces, except manual welded beads, erection seams and butts, may
be painted before leak test.
Final layer of coating is to be applied in one run.
Coating of machineries and electric equipment to be done in accordance with
manufacturer’s standard coating systems.
78M MAINTENANCE / WORKING VESSEL
- 34 -
Colour scheme to be agreed between owner and builder.
Not listed members of items to be prepared and coated as per their surroundings.
Representative of painting supplier wherever necessary is to present during paint
application at the yard for technical service and supervision.
Inaccessible spaces like tubular pillars are to be separated airtight from adjacent
structure and will have no internal surface protection.
Gas cut sharp edges to be grounded smooth before application of paint.
The surface of copper, copper alloy, aluminium alloy, stainless steel, and non-
corrosive material shall not be painted unless otherwise specified.
401. De-scaling & Priming
Plates and Profiles
All steel material to be pre-blasted to SA 2.5 and immediately coated with one (1)
coat of shop primer.
Fittings and Equipment
The steel surface of fittings and equipments such as pipe seats, grating supports,
auxiliary machinery seats, etc., to be generally power-cleaned with wire brush or disc-
sander to remove the weather rust and loose mill-scale.
402. Preparation & Application
Surface Preparation before Painting
Surface preparation to be inspected and accepted by paint supplier and Owner before
application of paint.
Prior to the application of the coating system, secondary surface re-preparation is to
be carried out where the shop primer has been damaged or weathered or missing,
according to the following schedule as guideline and subject to paint maker’s
recommendation :
78M MAINTENANCE / WORKING VESSEL
- 35 -
Area Preparation Grade
Underwater hull, flat bottom to deep load line SA 2 ½
Topsides, above deep load line incl. external
bulwark
SA 2 ½
Weather deck P St 3
Exterior superstructure and decks P St 3
Interior superstructure P St. 2
engine room, stores etc. P St 2
W.B. tanks SA 2 ½
F.O. tanks, D.O. Tanks, Sludge tanks P St 3
L.O. tanks P St 3
Potable water tanks SA 2 ½
Void spaces & cofferdams P St 3
Generally P St 2
Definition of Grades
The Swedish Standard SIS 055900-1967 and/or German Standard DIN 55928, part 4,
applies to all cleanness grades mentioned.
Application
The coating materials will generally be applied by means of airless spraying. Paint
brushes or rollers will be used for marking the different coloured areas or for painting
small structural members and for lettering, as well as for setting-off edges.
The paint not to be applied during periods of rain, snow, fog or mist in the open air,
and also not to be applied when weather conditions may cause condensation (when
relative humidity is above 85% and the steel temperature is lower than 3°C above dew
point), except when paint maker has confirmed a particular paint can be applied
during such weather conditions.
78M MAINTENANCE / WORKING VESSEL
- 36 -
Film Thickness
All stated film thicknesses are dry film thicknesses. The actual total film thickness
may deviate from the specified film thickness as follows:
- Shell external, water ballast tanks: 85 % of the points measured are to correspond
to the specified film thickness or more. Remaining points measured are allowed to
be 15 % less of that stated film thickness.
- All other Areas: 85 % of the points measured are to correspond to the specified
film thickness or more. Remaining points measured are allowed to be 15 % less of
that film thickness.
Film thickness shall not to be measured on irregular surfaces, such as welding seams
and corners or edges of structural members. For repair coats in overlaps, higher film
thickness to be tolerated.
The shop primer is included in the total film thickness.
Appearance of Finish
Painting of the exposed structural steel surfaces such as outside of shell, deckhouse,
etc. and of living spaces and passages in accommodation to be free from sags and runs.
In other areas except the above, paint sags and runs which are not considered harmful
to the performance, need not to be removed.
Damaged Coatings
The surface preparation of damaged or destroyed, partly finished or finished surfaces
will be carried out by disc or wire brushed according to specification but maximum to
P St 3.
Covering
All parts and fittings (e.g. glass, label plates, rubber gaskets, spindles etc.) to be
protected or covered before application of coatings is commenced.
78M MAINTENANCE / WORKING VESSEL
- 37 -
403. Painting Schemes
Following specifications based on coating system are for guidance. Other
specifications of equal standard would be acceptable.
Code Colour Code DFT (Microns)
Flat Bottom
1 coat HEMPADUR 17630 20320 Cream 150
1 coat HEMPADUR 17630 12170 L Grey 150
1 coat HEMPADUR 45182 25150 Yellowish Grey 75
1 coat HEMPEL’S A/F OLYMPIC 86950 60700 Brown 150
1 coat HEMPEL’S A/F OLYMPIC 86950 51110 Red 150
Waterline to Main Deck Including Bow & Bulwark External
1 coat HEMPADUR MASTIC 45881 50630 Redbrown 125
1 coat HEMPADUR MASTIC 45881 53246 Orange 125
1 coat HEMPATHANE TOP COAT 55210 53246 Orange 50
Superstructure, Deckhouse External & Railings
1 coat HEMPATEX HI-BUILD 46410 50630 Redbrown 100
1 coat HEMPATEX HI-BUILD 46410 12170 Grey 100
1 coat HEMPATEX ENAMEL 56360 10000 White 50
Exposed Deck & under wood Sheathing Including Bulwark Interior 1 coat HEMPADUR MASTIC 45881 50630 Redbrown 125 1 coat HEMPADUR MASTIC 45881 53246 Orange 125 Interior Exposed Accommodation Spaces, Machinery Rooms, etc 1 coat HEMPALIN PRIMER 12050 50410 Red 40 1 coat HEMPALIN UNDERCOAT 42460 10000 White 40 1 coat HEMPALIN ENAMEL 52140 10000 White 35
78M MAINTENANCE / WORKING VESSEL
- 38 -
Steel behind Lining 1 coat HEMPADUR MASTIC 45881 11480 Grey 100 Ballast Tanks, Chain Lockers, Void Space, Fore & Aft Peak 1 coat HEMPADUR MASTIC 45881 50630 Redbrown 150 1 coat HEMPADUR MASTIC 45881 11480 Grey 150 Potable Water, Foam Tanks
1 coat HEMPADUR 15400 50900 Light Red 100
1 coat HEMPADUR 15400 10000 White 100
Bilges – Engine Room, Bow Thruster Room & Steering Gear Room
1 coat HEMPADUR MASTIC 45881 50630 Redbrown 125
1 coat HEMPADUR MASTIC 45881 10000 White 125
Funnel Internal
1 coat HEMPALIN PRIMER 12050 50410 Red 40
1 coat HEMPEL’S SILVIUM 51570 19000 Light Alu 25
Deck Equipment, Cranes, Davits, Hatches, etc
1 coat HEMPADUR MASTIC 45881 11480 Grey 50
1 coat HEMPATHANE TOPCOAT 55210 10270 Grey 50
Wheelhouse top and exposed decks to be non-skid by adding Hempel anti-slip beads 67420
or anti-slint 67500
78M MAINTENANCE / WORKING VESSEL
- 39 -
404. Pipe Work Coloring All exposed piping systems are to be identified with color bands at 2m intervals in
accordance with the following color schemes.
1) Bilge & ballast : black
2) Fire main : bright red
3) F.W. System cold : blue
hot : blue with red band
4) Fuel oil : brown
5) Lub. oil : yellow
6) Hydraulic oil : purple
7) Sea suction : green
8) Sea water cooling : light green
9) Compressed air : grey
Galvanised pipes are to be etched-primed and then top-coated with color code.
405. Cathodic Protection
Appropriate numbers and sizes of zinc anodes are to be welded to the immersed loaded
hull, bow thruster tunnels and inside of the sea chest for three (3) years lifespan.
78M MAINTENANCE / WORKING VESSEL
- 40 -
SECTION 5 - MACHINERY & PIPING
500. Machinery General
All main and auxiliary engines, pumps etc., are to be approved type and supplied with
certificates as required by the classification. They are to be supplied and fitted by the
Builder.
501. Main Engines
Two (2) units of marine engine, 2,660 kw each, Medium speed and air started. With
front PTO for fire pumps and shaft generators. Run on MDO and exhaust to comply
with Tier II criteria.
502. Generating Sets
- Three (3) 550 Kw air start diesel driven alternators (440V/3/60Hz). Engine
exhaust to comply with Tier II exhaust criteria. Run on MDO.
- Two (2) 1,200 kW shaft generators, driven by main engine front PTO through 1-
in 2-out gear box.
- One (1) emergency diesel generator set, radiator or air cooled, rated approx
150 kW (440V/3/60Hz). To be provided with fuel tank for 36 hours running.
The unit must be auto-started within 45 second after main power failure.
503. Azimuth Propeller & Shaft
Azithmuth propeller two (2) sets, controllable pitch propeller. Driven by main engine
through cardan shaft. Control at wheelhouse aft and forward control station. Interface to
DP system to be provided.
504. Bilge / Ballast / Fire / GS / DW Pump
Two (2) vertical self-priming centrifugal 2 speed SW pumps of 120m3/hr at 30m and
250m3/hr at 60m total head. Suction and discharge pressure gauges to be provided.
Casing : Bronze
Shaft : Stainless steel
Impeller: Bronze
78M MAINTENANCE / WORKING VESSEL
- 41 -
Seal : mechanical
Location of the pumps to be in engine room.
The pumps are also to be used as heeling pumps.
505. Bilge Pumps
Two (2) sets. To be located in different compartment as much as practical. Specs are
identical to above except capacity to be 60m3/hr at 30 m head and suction and discharge
pressure gauges to be provided.
One (1) daily bilge pump 5m3/hr at 30 m head to be provided.
506. Fuel Transfer Pump
Two (2) 50 m3/hr at 50m head horizontal gear c/w relief valve. To have a cast iron
body with carbon steel impeller and shaft. To have one (1) remote stop switch outside
engine room.
507. Dirty Oil / Sludge Pump & Sewage Transfer Pump
One (1) electric driven horizontal positive displacement type screw pump installed in
the engine room for dirty oil / sludge discharge, and shall deliver 5m3/hr at 45m head.
One (1) electric driven self-priming centrifugal pump to be installed for sewage
transfer, capacity 5m3/hr at 45m head.
508. Auxiliary SW. Cooling Pumps
Two (2) horizontal centrifugal S.W. circulating pump, electrically driven, to be fitted to
serve air conditioning system and refrigeration systems. Capacity of the pump to meet the
system cooling design requirement. To be low speed at 1800 rpm.
GS pump to be connected to the system as standby set.
Deck machinery HPU to be cooled by independent centrifugal S.W. pump, with G.S
pump as standby connection, if water cooled.
509. FW Domestic Pressure Set
Two (2) fresh water pressure sets, each complete with one (1) pressure tank of about
1,500 litres with working pressure about 5 bar with pressure relief valve.
Three (3) domestic FW pump to be provided for the FW domestic pressure system with
78M MAINTENANCE / WORKING VESSEL
- 42 -
one (1) of the pump as standby unit.
510. FW Transfer Pump
One (1) 50 m3/hr at 30m head horizontal centrifugal pump to be installed.
511. Calorifier / Hot Water Circulation Pump
Two (2) electric calorifiers each with capacity of 1,500 litre with heating capacity of 65
kW to be installed in engine room. Each unit to be fitted with four (4) heating coils.
Three (3) centrifugal pumps each of 3.5m3/hr at 25m total head to be installed for hot
water circulation, with one (1) pump as standby unit, to be electrical driven.
512. Emergency Fire Pump
One (1) horizontal self-priming centrifugal S.W. pump of 65m3/hr at 60m total head to
be electrical driven. To be installed in bow thruster compartment.
513. Incinerator
One (1) incinerator with capacity of 180,000 Kcal / hr to be installed in incinerator
room.
514. Ballast Water Treatment Plant
The plant to be provided for the prevention of transporting harmful aquatic
organisms and pathogens via water ballast discharges from vessels, which will be
installed in the engine room. Capacity(150m3/h) to be according to class requirement.
515. Exhaust Pipes & Silencers
Exhaust pipes from main and auxiliary engines to be led to top of funnels. Exhaust pipe
for emergency generator engine to be led to atmosphere directly. Exhaust pipes and
silencers to be well insulated and covered with galvanized sheeting. All exhaust
silencers to be fitted with spark arrestor. Drain pipe and valve to be provided.
516. Engine Cooling System
Tube / shell or plate cooler to be provided. Capacity to maker’s requirements. G.S pump
to be connected to main engine SW cooling system as standby pump.
78M MAINTENANCE / WORKING VESSEL
- 43 -
517. Lub Oil System for Main / Auxiliary Engines
To engine maker’s requirement.
518. Compressed Air System
Compressed air working system shall comprise of air for engine starting and general
service, and consist of: -
a.) Engine Starting System
- 2 air compressors, air-cooled type, capacity 25 m3/hr at 30 bar, electrically
driven.
- 2 air receivers, 300L approximately at 30 bar (to be confirmed by engine maker)
- 1 oil/water separator
- 1 control air dryer
- 2 pressure switches for auto start/stop of air compressors
Assorted pressure gauges, pressure reducing valves, relief valve, filter etc to be supplied
for both systems with cross connections.
b.) General service air compressor
- 2 air compressors, air cooled type capacity 600m3 / hr at 9 bar, electrically
driven.
- 2 general service air receivers at 9 bar with capacity of 800L each.
Three (3) working air connections to be provided on main deck at each port and
starboard.
One (1) connection on 1st deck aft at each port & starboard.
One (1) connection on 2nd deck aft at each port & starboard.
One (1) connection on 3rd deck aft at each port & starboard.
One (1) connection on nav. bridge deck aft at each port & starboard.
Sea chest blow-down to be ¾” NB STP steel pipe, 4Kg/cm2
Main engine control and other equipment controls to be taken from the general service
air receiver through pressure reduction valves and control air dryer.
519. Oily Bilge Water Separator
One (1) MARPOL standard oily water separator complete with pump and oily water
discharge alarm to be fitted. Capacity 2 m3/hr with oil content less than 15 ppm.
78M MAINTENANCE / WORKING VESSEL
- 44 -
520. Side Thrusters
Two (2) transverse tunnel CP bow thrusters each giving thrust of approx.12 t, to be
driven by electrical motor. To be 900 rpm with dia about 2,250 mm.
All necessary controls, interface to DP and interlocks to be provided.
521. Sewage Treatment Plant
One (1) biological type sewage treatment plant for 204 men of vacuum type complied
with MARPOL requirements.
522. Fresh Water Maker
Two (2) sets of Reverse Osmosis water maker (each abt. 60T/day).
523. Purifiers
Two (2) LO purifiers of 800 ltr/hr each and one (1) Fuel oil purifier 1,500 ltr/hr shall be
supplied and installed by the Builder. Capacity to be confirmed by engine maker.
524. Piping General
All pipes are to be arranged according to good marine practice with sufficient bore and
thickness for the purpose intended. They are to be well clamped to the ship’s structure
and to have minimum number of bends. Approved type of bulkhead fitting is to be used
where piping penetrates a watertight or oiltight bulkhead, deck or tank top. Expansion
bends are to be fitted where necessary to avoid damage due to expansion or movement
of the structure. Mud boxes, strainers, filters and valves are to be arranged according to
classification’s requirements.
All valves will be marked with appropriately named plates. Bunker station will be
arranged on deck with common filling and discharge of diesel oil. Pipes of 1-1/2”
(38mm) and over to be butt welded with flanged connections, below 1-1/2” (38mm) are
to be screwed with unions.
All bare steel pipelines to be painted with primer prior to final finish coat as per paint
specification.
525. Pipe & Valve Materials
78M MAINTENANCE / WORKING VESSEL
- 45 -
Pipes:- Hull pipes to ISO / JIS / CB or equivalent. For pipes passing through tanks, pipe scantlings may be increased to be to Classification requirement. System Material Remarks Bilge + Ballast Hot-dip galvanised steel Seamless Sch 80 Fire + Washdeck Hot-dip galvanised steel Seamless Sch 80 S.W. Cooling Hot-dip galvanised steel Seamless Sch 80 F.W. Cooling Vendor recommendation Seamless Sch 40 Fuel Oil Black Seamless Sch 40 Lub Oil Black Seamless Sch 80 Sanitary, Fresh Water Hot-dip galvanised steel Seamless Sch 40 PE (accom) to maker’s standard Soil Pipe Hot-dip galvanised steel Seamless Sch 80 PE (accom) to maker’s standard Air + Sounding Hot-dip galvanised steel Seamless Sch 80 Except for oil tank Control air Copper To class requirement Starting Air Hot-dip galvanised Steel Seamless Sch 80 Working Air Hot-dip galvanised Steel Seamless Sch 40 Exhaust Black steel ME 8mm, AE 6mm With heat resistance paint Where galvanising is specified, this is to be carried out after fabrication as far as practical. Piping is not to be led through tanks as far as practical. However if need the thickness should be Sch120 or thicker. Valves:- Valves to be JIS standard. Shipside valves and sea valves to have cast steel or bronze body with class certificates. Valves on bilge, ballast, cooling water (S.W. and F.W.), fire and washdeck may be cast iron body with bronze trim. Valves on compressed air system, fuel oil and lub oil systems to be steel or bronze.
526. Bilge & Ballast System Bilge pipes are to be arranged with valves, strainers, mud boxes, manifolds and pumps
in accordance with the piping drawing to meet the Classification’s requirements. Mud
78M MAINTENANCE / WORKING VESSEL
- 46 -
boxes and strainers to be galvanized.
Bilge suctions are to be fitted to the following compartments:
Bosun Store bilge well
Bow thruster room
Engine room bilge wells
Azimuth propulsion compartment
Winch compartments (Fwd & aft)
Void spaces
Bilge system valves to be remote control type with electric actuators from location
above main deck.
High level alarm shall be provided for engine room bilge wells.
Ballast suctions are to be fitted to all ballast water tanks. Transfer of ballast water
between port and starboard tanks is available from the system. Striking plate to be
installed under each bell mouth.
Chain lockers, bosun store to be drained by bilge ejectors driven by G.S pumps. 527. Fuel Oil System Fuel oil pipes are to be arranged with valves, filters, manifolds, pumps and tanks in
accordance with the piping drawing and to meet classification’s requirements. The fuel oil bunkers and day tanks are to be arranged as shown on the GA drawing. FO
day tanks to be positioned at convenient locations. Air pipes and sounding pipes (and/or level gauge) are to be fitted to each tank. A bunkering line is to be led to the main deck, P&S for filling for all bunkers. The fuel transfer pumps together with the pipes and valves etc is to be arranged to
transfer fuel oil from bunker tank and discharge to either of the FO day tanks. Each FO day tank is to be provided with supply, filling and overflow pipe, drain valve,
sight glass or content gauge to meet classification requirement. Transfer of cargo fuel oil between port and starboard tanks is available from the system.
Striking plate to be installed under each bell mouth. Drip tray of 150mm height to be fitted in way of pumps, flow meters etc wherever necessary and with drain cocks for drainage to FO drain tank.
528. Bunkering / Discharge System
The system to cater filling / discharging for:-
78M MAINTENANCE / WORKING VESSEL
- 47 -
a) Fresh water filling: Female 100 mm, one each at port midship and starboard midship.
b) Fuel oil filling / discharge: Female 100 mm, one each at port midship and starboard
midship. Discharging by FO transfer pump.
Deck terminations to be fitted with approved type of quick couplings. Butterfly valves
to be fitted adjacent to quick couplings.
Fuel oil connections to be provided with drip trays with sufficient capacity.
For Sewage and dirty oil, deck discharge connection to meet MARPOL 73/78, location at
main deck aft of deckhouse.
529. Air & Sounding Pipe
Ventilation head for fresh water to be provided with stainless steel insect screen and
for fuel oil with stainless steel spark-arresting gauge. Sounding pipes shall be of
welded type with closure devices. Self closing sounding pipes are to be provided for
all double bottom tanks. Tank sounding pipes shall not to be located on the main deck
working area as far as possible.
530. Hydraulic Oil Systems
The hydraulic piping of solid drawn steel (internals to be acid cleaned) for deck
machinery to be arranged in accordance with the manufacturer’s recommendations and
to meet classification requirements. Adequate strainers to be provided.
After flushing onboard, oil sample to be taken and sent for analysis, and comply with
equipment maker's recommendation.
531. Fire Fighting & Deck Wash Service Seawater for the general and wash deck service is to be supplied from the GS and fire
pump to hydrants fitted on the weather decks, steering gear room, bow thruster room and engine room.
Paint store to be protected by nozzles tap off the system, or equivalent to class requirement..
532. Freshwater System Potable water tanks are to be arranged as shown on the G.A. Water is to be supplied to
the aft / forward main deck, accommodation and engine room through self-contained, automatic pressure tanks fitted in the engine room. Transfer between any tanks shall be executed by FW transfer pump, with manifold in
78M MAINTENANCE / WORKING VESSEL
- 48 -
engine room. Suitable deck fittings to be provided for common filling and discharge on main deck P&S.
533. Hot Freshwater System Hot freshwater system is to be drawn from cold freshwater into calorifier and piped to
wash places and galley. Hot water circulation pumps to be used for circulation. Hot water pipes to be suitably lagged.
534. F.W. Sanitary System Fresh water sanitary pipes are to be arranged with valves, S-trap and scuppers in
accordance with marine practice and meeting classification requirements. 535. Sanitary Fittings 1) Washbasins : white vitreous China, or stainless steel 20” x 16”
with 1/2” cold hot water supply. Taps to be chromed plated.
2) Showers : light coloured 6” or 12” ceramic tiles with 3/8”
cold and hot water screw down taps and mixing valves.
3) W.C. (Vacuum type) : white vitreous China with plastic seats and lids.
1” F.W. supply with valve. 4) Galley sink unit : 16” S.W.G. stainless steel twin bowl unit 1/2” hot
& cold F.W. supplies. Chrome plated taps. 536. Scuppers & Discharges
Discharges from washbasins, showers, sinks and internal scuppers are to be grouped into
a common cross main to sewage treatment plant or the sewage holding tank or discharge
overboard through storm valve. Discharges from hospital are to be led to sewage
treatment plant directly. Air pipe to be arranged from top of the cross main and sewage
treatment plant. Discharge from vacuum type W.C. to be grouped into a separated
common cross main led to sewage treatment plant or the sewage holding tank. Overflow
from the sewage treatment plant to be led to sewage holding tank. One transfer pump
installed for the system to transfer sewage in the sewage holding tank to shore or to the
sewage treatment plant.
78M MAINTENANCE / WORKING VESSEL
- 49 -
Scuppers from the refrigeration spaces are to be led overboard via a storm valve suitably
lagged. A scupper from the air conditioning compartment is to be led overboard via a
storm valve suitably lagged.
50mm scuppers to be fitted in toilets. Laundry and galley scuppers to be 80mm, each
corner of galley to be fitted with a scupper. All internal scuppers to be trapped, and fitted
with portable gratings.
Discharges and traps generally to be as follows:-
Showers: 50mm with P-trap
Washbasins: 32mm with deep seal bottle trap
Galley sink: 80mm with water and grease trap, strainer to be fitted
W.C. s: to vacuum toilet maker's standard
Cleaning plugs to be fitted where required.
Open superstructure/deckhouse decks to be drained by min. 50mm scuppers.
Moisture condensate drainage to be provided from behind accommodation panelling.
537. Refrigeration System
The built-in walk-in chiller and freezer shall be furnished and installed as shown on the
GA drawing. The two (2) complete sets compressors units shall be fitted in the engine
room with easy accessibility.
Performance criteria shall be cold room temperature at -18 oC and cool room
temperature +4 o C.
Each compartment shall be accessible through a proper stainless steel insulated door
with 150mm minimum polyurethane to preserve temperature. Each compartment shall
be thermostatically controlled, in addition each compartment shall be fitted with a drain
for excess water and condensation.
Provision for latching access door from inside will be provided. Extra precaution shall
be taken to ensure that a vapour seal be maintained. The chiller and freezer will be
fitted with deep shelves all around for storing food, with sea rails.
The two (2) compressor sets shall be identical, with one serving as a standby unit, fitted
with proper sealed refrigeration valves so either unit can be isolated for service. The
operating unit will service both the chiller and freezer fan/evaporator units, with
pressure/temperature controlled expansion valves, tied to each thermostat, controlling
the compressor operation, and required flow of cooling medium to each unit. The
78M MAINTENANCE / WORKING VESSEL
- 50 -
system will be designed to operate with R407a. Proper valued dryers, with bypass, and
moisture indicating sight glasses will be fitted. All compressor motors will be TEFC
enclosures, belt driven.
A remote temperature gauge complete with alarm bell system will be provided outside
the chiller / freezer. Suction & pressure gauges (permanent) will be provided for each
compressor. The bottom of the walk in boxes will be finished in red ceramic tile, with
wood grating over, the sides and overhead will be stainless steel sheet metal over non-
flammable, oil resistant type of insulation. Shelves will be stainless steel frames with
stainless steel bottoms and raise min. three tiers high and minimum of 300mm above
floor level.
538. Air Conditioning
Accommodation spaces to be central air-conditioned with cooling and heating. The
accommodation to be maintained with overpressure.
Designing Conditions:
Outside Temperature: 45 °C, 95% R.H. in summer, 0 °C in winter
Inside Temperature: 25 °C, 65% R.H. in summer, 20 °C in winter
Fresh Air Intake: 30%
Living spaces and wheelhouse shall be fully air conditioned and spot cooling for the
galley, provision store, sickbay, wash place, paint store and control rooms.
Two (2) independent central air handling units to be installed, one unit in AHU room 1
to serve main deck, 1st deck and 2nd deck spaces, the other in AHU room 2 to serve
3rd , 4th deck and wheelhouse.
The single duct, high velocity air conditioning system comprise of
- One (1) refrigeration plant in engine room
- Two (2) central air handling units
- Room units
- Duct system
The system is designed in accordance with normal marine practice, the IMO and class
Regulations where applicable.
Refrigerating Plant for Air Conditioning
78M MAINTENANCE / WORKING VESSEL
- 51 -
The plant consists of two (2) compressors with CU-NI condenser, one unit act as
100% standby so that in the event of failure of the one unit, the other will serve with
same capacity. The cooling medium is R-407a, which by direct evaporation cools
chill water that circulates between the refrigerating plant and AHUs. Two (2) chill
water circulating pumps to be installed, one as 100% standby.
For operation of the plant, the delivery includes a main starter panel with electric
controls of the condensing unit, chill water circulating pumps and the air handling
unit.
The seawater-cooled condenser is manufactured with CU-NI pipes and condenser
covers of bronze.
Central air handling unit
Each central air handling unit incorporates
- filtering / mixing function
- fan function with medium pressure centrifugal fan of marine design, V-belt
driven by electric motor
- cooling function with air cooler by chill water in circulation
- discharge function with connections to the duct system.
The air handling units shall be mounted on seating with rubber mounting.
Return Air is drawn from cabins / rooms and passageways through the exhaust units
and travels through the un-insulated duct system to the mixing chamber on the central
air handling unit. The mixing function is equipped with connection pieces for direct
mounting of ducts.
The system includes a high-pressure centrifugal fan, the suction side of which is built
together with a suction box. The suction box is equipped with connection pieces for
direct mounting of the un-insulated duct system.
Sickbay, Sanitary and Service Spaces
For sickbay, sanitary spaces, linen stores, oil skin room, provision store, change room
and laundry, the air should not be returned.
Wheelhouse
78M MAINTENANCE / WORKING VESSEL
- 52 -
In addition to central air-conditioning, the wheelhouse is to be fitted with two (2) nos.
air-cooled split type wall or floor mounted unit, with external unit mounted on the top
of wheelhouse.
ECR
ECR is to be installed with SW cooled floor-mounted air conditioning unit.
Fire Damper
Fusible fire dampers and fire dampers with indicators are to be provided as necessary.
Dampers are to close automatically in the event of fan failure, fire or shut down.
Dampers are to be fitted with manual over-ride facilities.
Adjustable dampers are to be installed to duct work as necessary for balancing.
All penetration pieces required for the installation work are to be provided, and to be of
an approved type so as not to affect the integrity of the fire divisions of the vessel.
After completion of the installation and construction, the system is to be tested and air
balanced.
539. Ventilation
Engine Room Ventilation
Main and auxiliary diesel engines are to draw combustion and cooling air from engine
room. The engine room is to have two (2) separate electrically driven main fans of
low-noise type with sound attenuator, each to have 50% required capacity. One of
them is to be reversible. The fans to have sufficient capacity according to ISO8861
requirement and to be capable to maintain overpressure in engine room. The fans to
be installed in fan rooms. Air ducts to be made of galvanized sheet. Natural exhaust
shall be provided via funnel. Air inlets and outlets shall be installed at least 6 m above
water level.
Steering Gear Room Ventilation
One (1) axial flow supply fan is to be provided above main deck for steering gear
room ventilation. Exhaust by natural.
Bow Thruster Compartment Ventilation
78M MAINTENANCE / WORKING VESSEL
- 53 -
One (1) axial flow supply fan is to be provided inside bow thruster compartment for
ventilation. Exhaust by natural. Air inlet and outlet are located at forward of 2nd deck.
The air supply is to cater for the cooling of bow thruster motors, emergency fire pump
motor etc.
Winch Compartment Ventilation
For forward winch compartment and aft winch compartment P&S, one (1) each axial
flow supply fan is to be provided for ventilation. Exhaust by natural.
Galley Ventilation
One (1) exhaust fan is to be provided for galley ventilation. Galley is to have an
independent exhaust system with stainless steel hood over range. Supply by natural.
Emergency Generator Room Ventilation
One (1) supply fan is to be provided for emergency generator room ventilation.
Exhaust by natural.
Sickbay, Sanitary Spaces etc. Ventilation
Sickbay, sanitary spaces, linen stores, oil skin room, provision store, change room and
laundry etc. to be provided with exhaust fans.
540. External Fire-fighting System
External fire-fighting equipment for Fi-Fi Class 1 shall be installed.
The following equipment are to be fitted for the vessel:-
a) Fire Pumps
Two (2) units seawater pumps 1,825 m3/hr at 125m head.
The pumps to be driven from main engine PTO via flexible coupling with clutch
and step-up gear.
b) Fire Monitors
Two (2) units monitors at 1,200 m3/hr each (one of them is dual barrel
water/foam)
The monitors are to be remotely controlled from wheelhouse.
78M MAINTENANCE / WORKING VESSEL
- 54 -
c) Fixed Water Spraying System
The vessel is to be protected by a permanently installed water-spraying system consisting of a number of nozzles fitted on all deck levels. The fixed water spraying system is to provide protection for all outside vertical areas of hull, superstructures deckhouses and other equipment. The uniformly distributed water rate to be min. 5 litres / minute / m2. The arrangement of the water spraying system is to be such that necessary visibility from the wheelhouse and the control station for remote control of the fire fighting water monitors can be maintained during water spraying.
d) Foam System. Foam system to install as per fire pump maker recommendation, one (1) set of foam mixer consisting of eductor and metering valve with mixing ratio 1-5% to be fitted.
e) Dispersant Spray Nozzle Spray nozzles to be provided at port and starboard midship. Pipe connection from general service SW.
541. Lifting Beams
Lifting beams are to be fitted over each main engine, diesel alternator completed with trolley / pully / chain block with SWL to lift heaviest component of main engine or generator.
542. Flow Meter
Flow meters to be provided for engine fuel consumption, each engine to be fitted with two (2) flow meters, one in FO inlet line and one in FO return line. Flow meters to be provided at filling / discharge station for each of FW and FO, with local read-out and remote printing in ECR. Calibrated certificate to be provided for the flow meter.
543. Maintenance Tools Following are to be provided. - 0.5-ton chain blocks x 2, 1-ton chain blocks x 2, , 1.5-ton chain blocks x 2, , 2-ton
chain blocks x 2 - Workbench with adjustable light and drawers under in the engine room - 125mm vice mounted to the workbench
78M MAINTENANCE / WORKING VESSEL
- 55 -
- one set of assorted hand tools for general maintenance - steel sounding tape x 2, bronze sounding tape x 2 - electrical hand inspection lamp with wandering leads x 2 - steel locker with padlock for spares - lathe machine 1.2M lathe bed - Drill press up to 25mm dia drill - Electric Grinder with tween disc - Electric Threader up to 50 mm dia pipe - Electric Hack Saw - 2 x 400 Amp welding set c/w 100 m welding cable and associated attachment
544. Lifting Lug in Engine Room
Lifting lugs (of JIS or equal with SWL marking) suitable for use of chain blocks are
to be fitted at the following positions:
Two (2) points above each main engine, trolley beam c/w pulley and chain
block
Two (2) points above each generator engine
Two (2) points above each generating alternator
Allow for further 20 points as nominated by Owner’s representative
545. Oxygen & Acetylene System
Oxygen and acetylene bottles for gas welder / cutter set to be arranged on main deck
aft of deckhouse, with securing to deckhouse aft bulkhead. Servicing to engine room
and working deck to be by portable hose. Nine (9) bottles to be provided, 40 litre each,
6 bottles for Oxygen, 3 bottle for Acetylene.
546. Heeling Monitoring System
Heeling monitoring system to be provided with at least the following.
- Pressure sensor type level gauging for each heeling tank.
- Vessel four-corner draft meter.
- Vessel inclination meter.
- Others if necessary
The one-screen display should be at both wheelhouse aft console and ECR.
78M MAINTENANCE / WORKING VESSEL
- 56 -
547. Valve Quick Closing System
Oil tank valves to be quick closed with pneumatic control system.
548. HIPAP Valve
For future implementation to install HIPAP System, HIPAP valve is to be installed in
HIPAP trunk with particular as follows.
Valve type: Gate valve
Gate valve flange: 500 mm
Gate valve control: Automatic, remotely controlled from wheelhouse aft station
78M MAINTENANCE / WORKING VESSEL
- 57 -
SECTION 6 – DECK MACHINERY & HULL FITTINGS
600. General
All deck machinery and equipment are to be supplied and installed to meet
classification approval.
601. Anchors, Chain Cables & Mooring Lines
The anchors, chain cables and mooring lines are to be supplied in accordance with the
classification’s requirements. For guidance, they are as follows:
- Two (2) AC-14 HHP stockless anchors, stowed in anchor-pockets, each of 2,655 kg.
- Total length of 687.5m (as minimum) x 46mm / Grade U3 stud-link-chain cables,
divided to port (12 lengths) and starboard side (13 lengths) with swivel and shackle.
- Two (2) chain-stoppers, roller type.
- Mooring lines: 12 x 60m long mooring ropes of min. 29 t breaking strength, both ends
spliced and canvas wrapped.
- Emergency towing line as per MSC.256 (84)
602. Anchor Windlass
Two (2) sets electro-hydraulic anchor windlass, with both local control at site and
remote control from wheelhouse, suitable for specified diameter cable complete with
one hawser drum and one warping head are to be provided. The cable lifter, hawser
drum and warping head are to be independently clutched. They are to be securely
mounted on fabricated steel seating on forward of 2nd deck above the chain lockers.
Chain pipes, cable stoppers and hawse pipes are to be arranged to suit.
Capacities - 10 tonnes at 9m/min for chain cables.
6 tonnes at 15m/min and at light loads 30m/min for mooring lines.
603. Deck Cranes
Main Crane
One (1) unit of lattice boom offshore crane, diesel-hydraulic driven pedestal type,
designed and manufactured in accordance to API Specification 2C and ABS Class and
78M MAINTENANCE / WORKING VESSEL
- 58 -
Man-riding Certification. Complete with at least the following.
- Load indicator and associated safety devises and alarms.
- Night working explosion proof flood lights three (3) sets.
- Man-riding winch and double 3t tugger winches with tag line for cargo
stabilisation.
- Two way hand-free radio communication for crane operator.
- Crane operator cabin air-conditioning.
- Electrical and air supply central slew ring.
SWL 64t at outreach 6.2 m Maximum working radius 36.6m. Fly hoist to be included.
Maker Favelle Favco 8/10K or equivalent.
The crane consists of a rotating system, mounted onto the stationery pedestal, with the
extendible lattice type crane boom, operated by winches and rigging system powered by
hydraulic power pack.
Boom rest made from steel pipes or I beams to be provided.
The crane to be delivered with necessary steel wire.
Aux Crane
One (1) electro-hydraulic telescopic crane to be installed. SWL 3t at outreach 12m.
Independent hydraulic power pack to be provided for the crane.
The crane to be delivered with necessary steel wire.
Crane to be designed with dynamic factor of 1.3 min.
604. Spread Mooring System
Vessel is to be provided with four (4) + one (1) spare Flipper Delta anchors or equal,
5000 kg each for spread mooring.
Each anchor is to be fitted with 3m pig tail chain of equal breaking strength.
Anchor wires of 1,500m length and minimum 38mm diameter to be delivered with
winches. Construction is to be 6 x 36 RHRL, EIPS, IWRC GALV. Anchor ends to be
terminated with a spelter socket and connected by a swivel. Each wire must have a valid
certificate.
Spread Mooring Winch - (4 sets)
Single Drum mooring winch, two left and two right hand configuration. Each winch
78M MAINTENANCE / WORKING VESSEL
- 59 -
comprises a single mooring drum, driven by a dial displacement, low speed high torque
hydraulic motor via double stage spur gear reduction. Two (2) forward sets to be
installed in bosun store, and two (2) aft sets to be installed in winch compartment.
The drum can be engaged or disengaged from the hydraulic drive via hydraulic cylinder
operated jaw clutch attached on the 2nd stage spur drive pinion gear. One of the drum
flange is welded with a brake race, equipped with a spring acting, hydraulic cylinder
release band brake via link mechanism.
The drum can be free-wheeled by de-clutching from the drive with the fail-safe brake
off. A dragging brake is installed onto the drum shaft to control pay out speed during
free-wheel or quick release wire from drum when emergency. SW cooling for brake
system to be provided.
The winch is equipped with spooling assembly to ensure proper laying of wire rope on
the drum. Spooling assembly is driven by sprocket chain drive from the motor drive
shaft. A dog clutch is provided for engage or disengage the spooling gear from the
drive, as well to fine adjust the alignment of wire to the drum.
The winch is completed with steel fabricated skid frame, to house all the parts and
components and is designed for deck mounting type.
The winches are to be powered by two units of electro-hydraulic power packs c/w
accumulator system. Every winch is to be supplied with a local control stand. A central
control panel to be located in the wheelhouse is supplied for remotely control.
Drum Pull (1st Layer) : 40T x 0-10m/min (low speed)
10T x 0-30m/min (high speed)
Drum Capacity : 1,500m x 38mm dia. wire rope
Brake Holding : 80T (static)
Clutch : Hydraulic cylinder operated jaw clutch
Line Tension and Length Meters
Anchor line tension monitors are required with facility to preset tensions and length in
order to set anchor wire tension values and distance to give an alarm if they change.
Length and tension meters shall be fitted on all winches, each having readout at the
central control station (wheelhouse) and pressure gauge for local location.
The tension meter shall have a digital readout and capable to connect to a PC for
78M MAINTENANCE / WORKING VESSEL
- 60 -
keeping of records.
Anchor Fairleaders, Sheaves and Anchoring Arrangement
Mooring wire is to pass over a sheave on the same level of the winch, and led upwards
passing through deck seal to another sheave located on deck, then horizontally to swivel
fairlead before connection to anchor.
Swivel fairleaders and intermediate sheaves are to be of generous size to accommodate
the wire size without nipping or over-bending.
Fairleaders are to incorporate taper roller shank bearings for the swivel heads and roller
bearing sheaves. Swivel heads are to be counterbalanced.
All intermediate sheaves are to be of the heavy duty / high load chrome steel roller
bearing type.
All roller bearings are to be fitted with seals and sufficient provision for lubrication.
Anchor Stowage Arrangements
The anchors are to be arranged to stow against substantial "cow catchers" anchor rack
constructed from approx 250mm diameter heavy wall pipe.
Anchors are to self stow readily with the flukes hooked under the horizontal tube.
Due to their proximity to the accommodation care is to be taken to ensure freedom from
movement and banging in a seaway when the anchors are hove up tight.
605. Mast
The navigation mast is to be completely fitted out with necessary brackets and stays for
navigation lights and shapes. Climbing rungs to be provided to top, arranged for access
to light trays and necessary fittings. Blocks for aerials, yard arms and ensigh staff to be
fitted and SUS316 sheaves for signal flags and shape hoists to be arranged on mast as
required. Cable fastener, bolts, nuts, bar and steps to be of SUS 316 material.
606. Manholes
All manholes are to be standard elongated shape with stainless steel studs and bronze
nuts. In way of accommodation, they are to be of recessed type with flush wooden
covers to match deck level. Manholes in engine room to be raised type.
78M MAINTENANCE / WORKING VESSEL
- 61 -
607. Hull Marks
Draft marks are to be in metric P&S forward, amidship and aft as per the relevant
regulations.
Tank markings to be by bead weld on ship shell plate.
Bow thruster mark, bulbous bow mark etc are to be provided.
Frame markings approximately at every five (5) frames to be by doubler plates welded
to bulwark stay plate on deck and frames in engine room.
Manhole markings to be by bead weld on the cover.
Funnel logo by plate bolted or welded to angle bar fitted at funnel side.
608. National Colours
“Staff” to be installed at mast for national colours.
609. Storm Rails (Grab Rails)
Storm rails to be fitted all round wheelhouse and on exterior bulkheads. Storm rails also
to be fitted in convenient positions in toilets and engine room.
Storm rails inside accommodation space to be 32mm dia polished stainless steel pipe.
610. Drainage for Decks
Suitable scupper pipes to be positioned in funnels, along all exposed weather deck to
facilitate deck drainage. Rubber plugs to be provided for main deck.
611. Doors
Steel doors to be fitted as shown on the General Arrangement drawing. All exterior
doors and internal W.T./G.T. doors to be in steel. All watertight doors to outside are
complemented with composite doors with deadlights, with automatic door closer on
inner doors.
Internal wooden doors in accommodation spaces to be of flush type.
612. Mooring Chock / Bollard / Fairlead
To be provided where necessary for mooring arrangement.
Onboard SWL test to be conducted with witness by class surveyor and statement of fact
to be issued by class. SWL mark to be by bead weld.
78M MAINTENANCE / WORKING VESSEL
- 62 -
613. Handrails & Stanchions
Stanchions are to be 75 x 9.5 F.B. x 1000mm high with short backstays and spaced not
more than 3 frames spaces apart. Top rails of 1.5” galvanised pipe and the lower rails of
19mm round bar. At access points, pipes substituted by 1/4” short link SUS chain with
hook and eyes.
614. Watertight Sliding Doors Below Main Deck Watertight doors below main deck to be hydraulic driven sliding type. They should be able to be remotely operable locally from each side of the bulkhead.
Indicators to be provided at the wheelhouse control station showing whether the door is
closed or open, and an audible alarm is to be provided at the door closure. The door’s
power, control and indicators should be provided with emergency electrical power in
case of main power failure. Individual hand–operated mechanism to be provided so that
the door can be opened and closed by hand at both side if control system failed.
615. Covers for Deck Equipment
Strong canvas covers for compass, FIFI monitors, cyscan, radius, capstan, gyro
repeaters, searchlights, tugger and anchor windlass etc. are to be provided.
616. Handrails & Grabrails
Handrails and grabrails are to be fitted at strategic positions for maximum safety and to
meet rule requirements.
617. Ladders
All ladders to be steel construction. External ladders to be non-slip, made of chequer
plate or similar construction. Vertical ladder to be constructed with 19mm square bar
rungs welded to steel flat bar and to be 250mm clear of steel bulkheads.
Hand grips to be fitted as necessary.
Dust cover plate to be installed for all external and internal stairs.
618. Hawse Pipes & Anchor Recesses
Two (2) 12”NB, Sch. 80 hawse pipes welded to 20mm anchor recesses. Chain pipes to
78M MAINTENANCE / WORKING VESSEL
- 63 -
be 8” NB, Sch 80.
619. Rubber Fenders
Appropriate number of D type rubber fenders at shipside as shown in GA.
620. Deck Sheathing
75mm thick 200 mm (min.) piece width marine type Balau or equal hardwood deck
sheathing over T-section is to be fitted to the aft deck as shown on drawing.
622. Tugger Winches
Two (2) sets tugger winches, 10 t SWL at 12 m / min, to be installed. Each winch is to
be complete with one (1) wire drum and one (1) warping head with local control. 200
m x 26 mm diameter wire is to be fitted to each winch. To share common hydraulic
pack with anchor windlass.
623. Capstans
Two (2) electro-hydraulic capstans shall be installed at main deck aft (P & S), with
pulling force of 5 tonnes at 15m/min. Variable speed control to be located at main
deck aft.
624. Hatches
Watertight hatches to be provided for the following compartments:
- engine room (1 off)
- steering gear (1 off)
- bosun store (1 off)
- ECR (1 off)
Rungs or vertical ladder to be fitted for each hatch. Safety cage to be fitted for ladders
above 2.1m height wherever practical.
625. Anchor Chain Locker
Two (2) chain lockers are to be constructed forward of the collision bulkhead. The
capacity of each locker is to be sufficient to stow specified length of chain cables.
The chain cables are to be self-stowing.
78M MAINTENANCE / WORKING VESSEL
- 64 -
Cable ends are to be attached with quick release.
Foot holes are to be cut in the centre division adjacent to the access opening, which is
to be fitted with watertight manhole cover.
Chain pipes and hawse pipes to be of welded steel construction designed to give easy
stowage of the anchors and cables. A permanent flushing arrangement to be provided
in the hawse pipes for cleaning the anchor cables.
Bottom will be fitted wooden sheet.
78M MAINTENANCE / WORKING VESSEL
- 65 -
SECTION 7 - SAFETY SYSTEM / RESCUE EQUIPMENT
700. Life Saving / Rescue Equipment
Life saving equipment is to be in accordance with the requirements of the Class and
Government authority for total complement of two hundred and four (204). Quantity
below are provided as guidance.
1) Life raft & davit: four (4) fifteen (15) men inflatable life rafts with full
emergency pack in rigid fibreglass container
conforming to SOLAS convention. Two (2) davits to be
provided for life raft launching.
2) Lifebuoys : total sixteen (16) lifebuoys to be supplied:
- four (4) with (4) 28 m buoyancy lines
- eight (8) with 30 m buoyancy line and self-igniting
electric buoy lights
- two (2) with self-igniting lights and smoke signals.
- two (2) with self-igniting lights.
3) Lifejackets : Two hundred and four (204) approved type lifejackets to
be supplied and stowed adjacent to each berth plus two
hundred and four (204) additional spare jackets to be
stowed on mustering deck in weather proof boxes.
4) Pyrotechnics : - One (1) line throwing apparatus (4 projectiles & 4 lines)
- Twelve (12) parachute distress rockets.
- Two (2) orange smoke signals.
- Six (6) hand flares
5) Rope Ladders : Two (2) embarkation rope ladders to be provided
6) Life Boat: Two (2) SOLAS-certified type life boat c/w davit for
launching over each side, each 102 men capacity. To be
of rigid construction and be capable of sailing for min.
four (4) hours at min 6 kts speed in calm water as per
SOLAS rules requirement.
Fast Rescue Boat: Two (2) SOLAS-certified type 15-person including
crews FRC diesel propulsion with A frame davit to be
78M MAINTENANCE / WORKING VESSEL
- 66 -
provided on the port & starboard side of 1st deck. To be
of rigid construction.
7) Immersion suit: one for each crew / pax to be provided plus ten (10) spare
sets.
8) First Aid Kit : 3 sets, one each for wheelhouse, engine control room
and mess room conform to SOLAS standard
9) Emergency Escape Breathing Device : 8 sets conform to SOLAS standard
701. Fire Detection & Alarm / General Alarm System
Fire and general alarm supply system is to be taken from 220V A.C. and the 24V D.C.
supplies. Break glass Alarm push buttons are to be fitted at each exit points at every deck,
in wheelhouse, bow thruster compartment, steering gear room and engine room. Alarm
bells are to be sited in each deck at centre passage, main deck external and wheelhouse.
An alarm horn is to be installed in the bow thruster compartment and steering gear
compartment. In the engine room, an alarm horn complete with a red rotating beacon is
also to be fitted. The installation shall meet SOLAS, Classification and relevant
Authority requirements.
Fire detection with smoke detector installed in each cabin and common room, and
smoke and heat detector in the passage way, galley and machinery spaces. The system
shall be addressed type.
702. Fire-fighting Equipment / System
Fire-fighting equipment is to be provided to meet classification and government
regulations and generally in accordance with the following:
1) Firemain
A firemain and ND 40 bronze hydrants are to be installed.
International shore connection is to be fitted.
2) Fireman’s Outfit
Four complete fireman’s outfit are to be provided, each consists of:
a) Two (2) aluminium asbestos-free protective clothing
b) One (1) breathing apparatus & safety line (c/w spare cylinder and BA
compressor)
c) One (1) 12” fireman’s axe
78M MAINTENANCE / WORKING VESSEL
- 67 -
d) One (1) safety lamp of portable battery type (3 hours)
e) Two (2) sets of gloves & boots & helmet with visor
3) Portable Fire Extinguishers
Fire extinguishers as required by the classification/government authority are to
be supplied and installed.
Replacement charges are to be supplied.
4) Fire Blanket
Two (2) off to be provided in engine room and galley.
Fire Axes
Two (2) off. 36” long fire axe with wooden handle.
5) Fixed CO2 System
A full flooding CO2 system consisting gas bottles c/w quick operated valves and
auto alarms is to be provided for engine room fire fighting. The CO2 bottles to be
stowed inside CO2 room. Operation is to be manual arranged both on the bottle(s)
and in a “break glass” pull box at the engine room access.
A separated CO2 system to be provided for protecting incinerator room, the CO2
bottles to be stowed inside CO2 room.
6) Engine room fixed water-based local fire-fighting system
The system should comply with IMO requirement and protect following areas.
- main engines
- diesel generator engines
- FO purifiers if fitted with heater.
703. Rescue Zones
Rescue zones, length at least 5 m, shall be established at both sides of the vessel and
shall meet the class requirements, in way of which bulwark gates with 2m width to be
provided. When not in use, normal bulwark height is obtained. The area shall be
clearly marked from outboard.
Rescue zones shall be service by means of scrambling nets, with width not less than
5m and weighted at bottom. It should be long enough to extend min. 1m below the
light draft of the vessel.
The rescue zone to be free of hull fittings, projections and overboard discharges.
Pilot access rail / fittings to be provided.
78M MAINTENANCE / WORKING VESSEL
- 68 -
SECTION 8 - ELECTRICAL
800. General Installation
Electrical apparatus and wiring system are to comply generally with the respective
classification society’s requirements.
All electrical fittings used to be of good quality and suitable for tropical and marine
environment.
All electrical fittings inside hazardous area to be explosion proof type.
801. System of Supply
a) 440 volts, 3 phase, 60 Hz - for power (motor)
b) 220 volts, 1 phase, 60 Hz - for lightings and power less than 3 kW
c) 24V D.C. - for alarms, emergency lights in selected areas, radio, navigational
aids, navigation lights and other emergency loads.
802. Power Supply
-Normal Supply:-
The A.C main power supply system is to be obtained from
- Three (3) 550 KW, 440/3/60, 0.8 P.F. and 3 wire air start diesel engine driven
generators.
- Two (2) 1,200 KW shaft generators.
The diesel driven generators shall be capable of parallel operation.
The diesel generators and shaft generators shall be capable of parallel operation for short
period for load transfer only.
-Emergency Supply:-
For emergency duties the power supply shall be obtained from a 150 KW capacity,
440V/3/60 generator arranged for independent battery starting in the event the main
power supply fails.
-Shore Supply:-
A 400 Amp T.P 440/3/60, 3 wire watertight shore supply complete with connection box,
78M MAINTENANCE / WORKING VESSEL
- 69 -
sequence indicator, circuit breaker and connected to the main switchboard.
-24V D.C Supply:-
a) The 24V D.C main supply is to be obtained from two (2) banks of 2 x 24V 200
AH main batteries via the main battery charger. Batteries to be sized for ship’s
transitional power supply for emergency duties without re-charging. Batteries to
be float charged by two (2) 40 amp battery chargers.
In the event of failure of the main (or emergency) source of power, the
emergency batteries (transitional power supply) shall automatically supply power
to the emergency lighting communications and navigation aids, etc.
b) A 24V D.C supply for the radio equipment is to be obtained from one (1) bank of
2 x 200 AH main batteries via the radio battery charging panel, powered by one
(1) 40 amp battery charger, automatically regulated.
803. Switchboard - Main
The main switchboard shall be of opened hinged front and opened back screw type and
arranged in the engine control room. A fixed louver complete with fine insect netting
shall be installed in the back plate.
It shall be fitted with split busbars, circuit breakers, voltmeters, ammeters, frequency
meter and earthing for controlling the entire A.C. system. For generator protection the
generator circuit breakers shall have under voltage trip inverse time over current and
instantaneous trip devices. Synchronising equipment for manual parallel operation of
diesel driven generators shall be installed with synchronising lamps, synchroscope,
selector switch for generators, frequency meter, governor motor switch etc. In addition to
under voltage and over current relays, a reverse power relay shall be provided.
Interlocking between shore power connection and generators shall be fitted. An earthing
indication light and testing switch shall be fitted and also a selector switch for ammeter
and voltmeter.
The internal wiring of the switchboard shall be carried out in EPR insulated wire to
Classification and specification with a maximum operating temperature and having the
following insulation grades:-
- Power Cables : 660 volts
- Control Cables : 250 volts
78M MAINTENANCE / WORKING VESSEL
- 70 -
On completion of manufacturing and before despatched to the vessel the switchboard
shall be subject to an electrical voltage test of 2000 volts at a frequency between 25 to
100 cycles in accordance with Classification requirements.
A rubber insulating mat shall be laid full length in front of and behind the switchboard. It
shall have a minimum width of 900mm.
All components throughout the switchboard shall be provided with white-black-white
traffolite nameplates clearly indicating the components service and normal full load
current ratings. The plates shall be secured with brass pins or screws.
An insulated handrail shall be fitted to the front of the switchboard; it shall be at a
convenient height and run the full length of the switchboard.
804. Switchboard - Emergency
One (1) emergency switchboard similar in construction to main AC switchboard shall be
provided for the control of diesel engine driven emergency alternator set. During normal
operation the emergency switchboard shall receive power from the main switchboard.
Distribution of electrical power shall be made available both at 440V and at 220V levels.
The 220V distribution shall be derived from a 440/220V transformer.
805. Distribution Board – 24V DC
The 24 volt D.C. switchboard shall be provided for battery charging and distribution of
DC sources. It shall be equipped with all necessary voltmeters, ammeters, isolation,
changeover and selector switches for battery charging and circuit breakers, as required.
A dummy push button switch to simulate power failure shall be incorporated.
806. Cable Installation
All cables shall meet with Classification rules. Where exposed to damage, and in
machinery spaces, cables to have galvanised steel wire braid armour and PVC outer
sheathed.
Care shall be exercised in the run of all cables to avoid areas of excessive temperature,
action from condensed moisture or drip and protected from risk of mechanical damage.
Power cable and signal cable should be laid in separate cable trays with distance between
to class requirements.
When required, the watertightness of the cable ends situated below the bulkhead deck
shall be ensured by appropriate means at the time of installation.
78M MAINTENANCE / WORKING VESSEL
- 71 -
Normally cable runs shall not include joints. If a joint is absolutely necessary or desirable,
it shall be carried out in a suitable box of such design that the conductors remain properly
insulated and protected from atmosphere action, and fitted with terminals and busbar of 4
dimensions proportionate to the current rating.
In toilet and washroom areas as far as practicable only cables absolutely necessary for the
supply of equipment used in these spaces shall be permitted.
All cables to be regularly colour coded or labelled.
Penetration of watertight decks and bulkhead shall be effected in watertight manner.
Lighter individual stuffed glands or boxes containing several cables and filled with fire
retarding packing shall be used for this purpose.
807. Cable colours
Vessel current carrying parts of different polarity shall be clearly marked with
distinguishing colours as follows:-
RED : PHASE ONE
YELLOW : PHASE TWO
BLUE : PHASE THREE
808. Cable Tray / Supports
Cables within machinery spaces shall be secured by approved type ties onto perforated
galvanised steel tray/galvanised cable ladder.
In accommodation spaces, cables shall be run behind panelling in horizontal or vertical
run in an orderly manner and clipped to straps welded to frames. Where it is not practical
to run cable behind panelling the cable shall be covered with battens.
Cables subject to weather or mechanical damage shall be run suitably supported in pipe
with welded unions. Pipe shall be smooth on the interior and not subject to deterioration
from the effects of moisture. The pipes shall have their ends shaped or bushed in such a
way as not to damage the cable covering. The pipes shall be mechanically and
electrically connected to terminating boxes
809. Electric Distribution
Distribution shall be by the three wires with neutral earthed system.
Distribution of power throughout the vessel shall be generally as described.
78M MAINTENANCE / WORKING VESSEL
- 72 -
810. Distribution Boards
Distribution boards situated in Accommodation spaces shall be installed in an easy
accessible manner.
Outgoing circuits shall be fitted with traffolite nameplates indicating the circuits,
maximum amps, and rating of fuse fitted.
A.C. and D.C. distribution boards are to be double pole type.
Power and lighting distribution boards in number and size as necessary.
811. Switch Panels
Switch panels shall be sited at the wheelhouse and all outgoing circuits fitted with
nameplates indicating the circuits.
Radio Switch Panel (24V D.C.)
The radio switch panel shall be powered from the radio battery via the radio charging
panel. It shall be fitted with indication lights, ampere and voltage meters, fuses, circuit
breakers and alarm indicator.
Navigation Light Switch Panel (24V D.C.)
This panel shall be fitted with a built-in transformer rectifier 220V AC/24V DC
indicators, switches, buzzers, fuses, failure alarm indicator and change-over switch. Main
supply is obtained from 220/1/60 A.C supply and emergency from the main batteries.
812. Motors
All motors shall be suitable for working in climatic conditions and in accordance with the
requirements of Classification.
Generators and motors in excess of 50 kW shall have built in space heaters.
813. Motor Starters
All motor starters shall be tested in accordance with Classification.
All motor starters shall be enclosed in 16 SWG quality bright mild steel cases. The
applied paint shall be treated in accordance with Classification Regulation.
All cut outs and door edges shall be suitably sealed with gaskets, ensuring that the case is
both dust-proof and hose-proof to IP22 or IP44.
78M MAINTENANCE / WORKING VESSEL
- 73 -
Every starter shall have the load break insulator mechanically interlocked with the case
door; ensuring power is off when door is opened.
All outgoing cable terminations shall be located above in removable 6.5mm gland plate
located in the base of the case thus providing ready access to terminals and glands.
A starter shall be provided for all electric motor 0.5HP and above.
Motors up to 15kW rating shall be started by means of a ‘DIRECT ON LINE’ type
starter. Motors between 15kW and 55kW shall be started by means of a “STARDELTA”
type starter. Motors above 55kW shall be started by means of an “AUTO-
TRANSFORMER” type starter or soft starter.
All the motor starters for oil related pumps, heaters and fans to engine room shall be
fitted with remote stop stations located one in the passageway outside the machinery
space and one in the wheelhouse.
814. Transformers
Two (2) step-down transformers one as standby, shall be installed in Engine Room to
provide for general lightings and power supply for the vessel, approximately each 125
KVA capacity.
Two (2) step down transformer for 220V emergency supply, approx. each 50 KVA
capacity.
815. Storage Batteries
All batteries shall be of the lead acid type.
All batteries shall be installed in battery room on the compass deck. The batteries shall be
sat on non-absorbent insulating supports with similar spacer blocks at the sides to secure
air circulation space all round the battery.
The battery space shall be painted with a corrosion resistant paint.
816. Shore Connection Equipment
Provision shall be made to connect a 400A, 440 Volt, 3 Phase, 60 Hz, supply from shore
to the main switchboard. It should also be used as power output connection.
The system shall be arranged so that it is not possible to parallel ship’s alternators with
shore supply.
The connection box shall be complete with circuit breaker, phase sequence indicator,
78M MAINTENANCE / WORKING VESSEL
- 74 -
pilot lamps and socket.
817. Fuses & Circuit Breakers
Fuses circuit breakers used throughout the installation shall be of the Classification
approved type and shall be suitably sized to circuit requirements.
818. Switches
All switches in the accommodation are to be flushed mounted and switches in the engine
room and other machinery and watertight compartments are to be watertight and metal
mould (marine type)
Control switches shall be suitably sized to circuit requirements.
819. Sockets & Terminals
Cable sockets and connecting terminals shall be of such dimensions that the
maximum current likely to flow through them shall not produce heat which would be
injurious to the installation.
Where soldering is adopted for securing cable sockets and connecting terminals,
corrosive solid or liquid flukes shall not be used.
Accommodation:-
Non-watertight 220/1/60, universal switch sockets, flush or surface mounted shall be
fitted throughout the accommodation spaces.
Engine Room/Galley/Stores
Watertight 220/1/60, switch sockets, marine moulded type surface mounted shall be
fitted throughout the engine room, galley and store space
820. Lighting
All rooms shall be provided with electric lighting. In general, fluorescent light are to
be fitted unless the incandescent lamp shall be provided where impractical.
Main lighting shall be laid out for 220 V. Light fittings are to be fitted with vibrating
dampers where necessary.
Emergency lights are to be installed according to the rules and IEC regulations.
Lighting for Accommodation
All cabins are to have ceiling light fitting, bed lamps, desk lamps, socket outlets.
78M MAINTENANCE / WORKING VESSEL
- 75 -
Mirror light with socket shall be mounted in cabins’ bathroom/washstand.
Fluorescent light fittings are to be provided in all alleyways and stairs.
Bridge and chart room is to have ceiling lighting and working light over chart-table
and radio table.
Plug sockets with suitable number shall be provided including dimming device for
chart-table lamp, compass lights, tachometers and rudder angle indicator.
Plug socket for daylight signaling lamp shall be provided.
For mess room additional wall and ceiling lightings with separate on/off switch with
dimmer to be provided.
Lighting for Engine Room & Other Technical Room below Main Deck
Engine rooms and other machinery room below main deck are to be fitted with
watertight fluorescent light fittings and watertight plug sockets. Engine room lighting
shall be supplied from different distribution board and shall be arranged alternatively
to minimize blackout of entire engine room should failure occur to any one source.
Lighting for Deck
Floodlights, 6 x 400W, all facing aft, two (2) each to be provided at navigation bridge
deck, 3rd deck and 1st deck.
Floodlights, 6 x 400W, to be provided on both side inboard of the box rail illuminating
the main work deck.
All lighting on deck shall be provided with on/off switches to be installed in the
bridge. Watertight plug sockets are to be fitted in alleyways at outside doors in each
side. Brass and/or copper and/or stainless steel watertight light fittings are to be
installed for outside lighting.
Sufficient lighting to be provided along the cargo rails, rescue zones, main deck aft
working area, and forward mooring area which is covered.
Lighting in following areas to be fed from both main and emergency power source.
- Rescue boat / lifeboat stowage location, launching appliances, reception and
rescue areas.
- Flood lights for the sea in way of rescue zones and rescue boat launch and
recovery area.
Search Light
78M MAINTENANCE / WORKING VESSEL
- 76 -
Searchlights: 4 x 2,000W, 220/1/60, remote controls at fore & aft control station within
reach of helmsman. They should be capable of 50 lux illumination with an area not
less than 11m diameter at 250m with 360 degree rotation and class cert to be
provided..
821. Navigation Lights
Double tier lens, 220VAC 1Ø 40 watt navigation lights shall be fitted. The navigation
lights shall be according to International Regulations. At least to consist of the
following:-
- One (1) Masthead lights
- One (1) Port light
- One (1) Starboard light
- One (1) Stern light
- Two (2) Anchor lights
- One (1) set of Immigration lights
- One (1) set NUC lights (three in number)
All navigation lights shall be controlled by a 6-way indicator panel fitted in the
Wheelhouse. The supply shall be taken normally from the main and emergency 220/1/60
A.C. supply.
Each navigation light shall be controlled and protected by a double pole switch and fused
on each conductor. A mimic diagram with visual and audio indicator shall be fitted.
822. Emergency Lights (220V A.C.)
Emergency light is to be provided and fitted at strategic points in the wheelhouse, lobby,
steering gear, bow thruster compartments, engine room, at entrances, galley, mess and
radio area. All to Classification and relevant Authority requirements.
Emergency lights shall be automatically energised on failure of main A.C. supply and
shall form part of the normal lighting system.
Following emergency lights to be fed from 24V D.C. before taken over by 220V A.C.
- one in wheelhouse
- one each at corridor of each tier of deckhouse
- one in steering gear room
- one in engine room
78M MAINTENANCE / WORKING VESSEL
- 77 -
- one in engine room forward part
- one in engine room tween deck
- one in bow thruster compartment
823. CCTV System
CCTV system shall have seven (7) cameras at following locations.
- four (4) in forward, with two at ship mooring winch / anchor windlass and two at spread
mooring winches.
- two (2) at aft, at spread mooring winches.
- one (1) at monkey island facing downwards to deck area.
Display is to be at wheelhouse aft control station, with 21” colour monitor.
824. Main & Auxiliary Engine Alarm
All alarm shall be operated on 24V D.C. supply. The main engine shall be supplied from
D.C. main switchboard.
All the engines and low level alarms shall be provided with a panel in the Engine Control
Room and in the wheelhouse fore and aft control stations with visual and audio indicators.
A steering gear visual and audio alarm indicator shall be provided in the wheel house and
ECR.
825. Reefer Plugs
Two (2) 440V and two (2) 220V reefer plugs to be installed at forward of cargo deck for
connection of reefer containers.
826. Gas Detector
Two portable gas detectors for H2S, CO2, CO, O2 and hydrocarbon to be provided.
827. Engine Room Alarm Device
In the engine room, the separate alarm indicating panels shall be provided, which
consist of:
General alarm
Machinery alarm
Fire alarm
78M MAINTENANCE / WORKING VESSEL
- 78 -
Water mist alarm
CO2
828. MOB Alarm
Bridge operated “Man Overboard” alarm to be installed which is clearly audible
throughout the vessel and is separated and distinct from all other alarms.
829. LAN
Cabling for LAN to be installed, with sockets in wheelhouse, ECR, ship office, single
cabins and twin cabins. The hub to be installed in wheelhouse.
830. Safety & Emergency Operation
All necessary safety and emergency operation are to be located in separate control
panels.
Separate safety control system shall be situated in the control places in engine control
room and on the bridge if required by rules and regulations.
The main engines are to be provided with separate safety system for each engine
according to the rules. Indication and controlling of the vessel at the aft control station
shall be reflection of actual movement of the vessel. Indication shall be properly
colored and named.
831. Roll Reduction Monitoring System
To be installed at wheelhouse forward and aft control station, with display of vessel
rolling period, rolling angle, vessel draft / trim etc. The system will also indicate the
required liquid level in anti-rolling tank to optimize the roll reduction performance.
832. Hospital / Chiller / Freezer Alarm
Hospital audio alarm acknowledged at wheelhouse is to be activated by press button
near each hospital bed reachable by patient on bed.
Chiller / freezer audio alarm acknowledged at wheelhouse and galley is to be
activated by press button inside the freezer.
78M MAINTENANCE / WORKING VESSEL
- 79 -
SECTION 9 – NAVIGATION & COMMUNICATION SYSTEM
The following navigation and communication equipment are to be supplied and fitted to
comply with GMDSS A3 and IMO / SOLAS latest requirement.
900. Navigation
1) Daylight signaling lamp, 24V DC C/W battery in a box.
2) Standard magnetic reflector compass
3) Autopilot.
4) 3 x IMO approved Gyrocompass, with repeaters at steering gear compartment,
forward and aft consoles and 2 x wing bearing taking repeaters for interface with DP.
5) Radars: Two (2) daylight display color radars one each of S and X band. One (1) of
which shall be gyro stabilized and fitted with an automatic electronic plotting facility
(IMO type approved). One repeater for X band radar to be fitted on the aft control
console.
6) Echo sounder: Color display 200 KHz c/w transducer etc. One repeater to be fitted
at chart table.
7) Speed log: Doppler type, range –10 to 45 knts
8) Electronic Chart
9) 2 x DGPS and appropriate display for precise position fixing at operational sites
10) CVS and window wipers: 2 x 300mm CVS & 5 x horizontal window wipers (3
forward and 2 aft)
11) Navigation lights and shapes: to rule requirements
12) Ship’s whistles: 1 x compressed air operated, 250-700 Hz, remote controlled in
W/H consoles.
13) Horn: 1 x mechanical fog horn, portable type
14) Bell: 1 x 300mm dia. brass bell with ship’s name and year of completion of the
vessel
15) Barometer: 2 x 150mm dials in brass case
16) Clinometers: 4 off
17) Wind Anemometer: 3 sets to have interface with DP
18) International Code of Signals: 1 set plus national ensign and Flag of building
78M MAINTENANCE / WORKING VESSEL
- 80 -
country
19) Nautical publication: 1 lot, (owner supply)
20) Engine telegraphs: 3 off (2 in W/H, 1 in ECR) and 2 at local
21) Navigation shapes: to rule requirement
22) Binoculars: 2 pairs, 7 x 50 adjustable with eye piece in wood box. Marine type.
23) Bar parallel rules: 1 off, 300mm (owner supply)
24) Thermometers: 3 off, 100mm diameter - 20o to 50 o C
25) Chronometer: 1 off
26) Automatic identification system (IMO approval)
27) Interfacing: to be provided for radar, speed log, gyro etc.
28) Weather fax receiver
29) Voyage Data Recorder (VDR)
30) GPS Navigator
31) BNWAS (bridge navigation watch alarm system)
32) Two (2) international signal code manual (One for visual, one for radio)
33) Radio clock 1 off
901. Communication
Radio / communication equipment to be provided to IMO/SOLAS and GMDSS A3
requirement
1) PA / talkback System: throughout the ship, main control station in wheelhouse.
2) Sound powered telephone system providing service to all command and control
centres, including wheelhouse, engine side, ECR, steering gear room, bow thruster
room, fire control station etc.
3) GMDSS Communication (Sea Area `A3’)
- 1 x MF/HF, 250W, voice, DSC & NBDP, ship and shore distress alerts etc.
- 1 x MF/HF DSC watch keeping receiver
- 3 x 25W VHF, 220/1/60 & 24V DC with converter fully synthesized with DSC,
all ITU channels, dual and multiple watch, 2 remote handsets. One
of them to be with helicopter communication frequencies.
- 2 x VHF watch receiver with DSC decoder
- 4 x 2-way VHF handheld transceivers, waterproof type. One (1) for each rescue
zone and each rescue boat.
78M MAINTENANCE / WORKING VESSEL
- 81 -
- 1 x Navtex receiver
- 1 x Inmarsat C - SES Satellite system
- SSAS
- LRIT to IMO requirement
4) Inmarsat System
1 x Felcom 500 is to be fitted
5) EPRIB, GMDSS satellite 408 MHz EPRIB
6) SART: 2 sets, GMDSS 9GHz
7) TV antenna: 14 outlets
8) Integrated telephone / command system: 1 exchanger, 48 lines max.
9) One (1) helicopter beacon.
10) Two (2) transistorized portable loud hailer.
78M MAINTENANCE / WORKING VESSEL
- 82 -
SECTION 10 – DYNAMIC POSITIONING SYSTEM
The vessel shall be equipped with dynamic positioning system to class requirement for
DPS-2 notation.
The control of the DP shall be at the aft wheelhouse console together with the
independent joystick system in accordance with class requirements.
The DP system shall generally consist of the following as minimum.
- Duplex DP workstations with two control and field cabinet
- One (1) Cyscan laser system
- VRU or MRU to DP-2 requirement
- Two (2) UPS
- One (1) printer
- One 1) laptop PC
- One changeover switch (DP/IJS/manual control)
- 2 x DGPS (1 x DPS112 & 1 x DPS110) positioning reference system
- Shall be capable of performing "DP follow ROV mode"
"ROV follow" function to be included.
The system shall have interface with the acoustics, DGPS, gyrocompass, wind tracker,
VRU, UPS, printer, etc.
The electrical system on vessel including the switchboard and the piping shall be
designed and installed according to the class requirement to meet DP Class 2.
FMEA report should be prepared by third party consultant engaged by Builder. FMEA
report is to be approved by Class.
All the supporting operation system and equipment must be designed / arranged to meet
/ comply with class requirement for DP-2.
Recommended