GI CHEMICAL EARTHING ELECTRODE
Technical Specification
Model MATERIAL Length Outer Pipe Inner Pipemm
SR502/503 GI 2000/3000 50 25SR802/803 GI 2000/3000 80 40
*Also available in other custom Size.
Different name of this produce1.Chemical Earthing
3. maintenance free Earthing electrode4.safe earthing electrode5.GI CHEMICAL EARTHING ELECTRODE
Dia.(mm) Dia.(mm)
2. Chemical Earthing electroed
Terminal Galvanizationmm (micron)
40X8 80-10065X10 80-100
COPPER BONDED CHEMICAL EARTHING ELECTRODE
Model MATERIALLength Outer Pipe Inner Pipe
mmSB502/503 CB* 2000/3000 50 25SB802/803 CB 2000/3000 80 40
* CB::-COPPER BONDED FARTHING ELECTRODE *Also available in other custom Size.
Different name of this produce
1. copper bonded earthing electrode
3.copper earthing electrode4.copper bonded chemical earthing
Dia.(mm) Dia.(mm)
2.copper coated eathing electrode
5.copper bonded safe earthing electrode6.copper bonded maintanace free chemical earthing
COPPER BONDED CHEMICAL EARTHING ELECTRODE
Inner Pipe Terminal Copper Bondingmm (micron)
25 40X8 100-15040 65X10 100-150
Different name of this produce
1. copper bonded earthing electrode
4.copper bonded chemical earthing
Dia.(mm)
2.copper coated eathing electrode
5.copper bonded safe earthing electrode6.copper bonded maintanace free chemical earthing
COPPER BONDED EARTHING ROD
Model MATERIALLength EARTHING ROD
mmSOR-5/8" CB* 2000/3000 14.2SOR-3/4" CB 2000/3000 17.2SOR-1" CB 2000/3000 25
* CB::-COPPER BOUNDED FARTHING ELECTRODE
Different name of this produce
1.copper bonded earthing Rod2.copper coated earthing rod3.copper earthing rod
Dia.(mm)
Terminal Copper Bonding
AT SUITABLE SIZE
(micron)100-150100-150100-150
Different name of this produce
1.back fill compound
SOR (SOIL's OHM READUCER) Compound:-
SOR compound is a specially formulated compound having high current conductive & rust Resistance property, Absorbing & retaining the moisture for long period. It reduces the ohmic value of soil & helps in Faster dissipation of fault current.Sor compound will be used around the earth electrodes at the time of installation.SOR compound is to reduce resistance between electrodes and soil and to create a low resistance zone arounding the electrode to create a uniform environment so that the electrode output is constant. Sor compound use as back fill material.
formulated compound having high current conductive & rust Resistance property, Absorbing & retaining the moisture for long period. It reduces the ohmic value of soil & helps in Faster dissipation of fault current. Sor compound will be used around the earth electrodes at the time of installation.SOR compound is to reduce resistance between electrodes and soil and to create a low resistance zone arounding the electrode to create a uniform environment so
Sor compound use as back fill material.
SOR compound is to reduce resistance between electrodes and soil and to create a low resistance zone arounding the electrode to create a uniform environment so
a suitable depth of 2 or 3 meter (Electrode length)
2. Mix backfill material nicely with dug out soil.
3. Throw handful of compound soil mix into pit.
4. Remove plastic sleeve carefully from electrode.
6. Refill space around electrode with backfill material in small
quantities.
7. Then pour some water and gently poke around the
pit with a long wooden rod, to allow trapped air to escape.
8. In this manner gradually continue refilling process till
electrode is buried in pit, up to the green patch painted on
9. Ensure that pit is not watery.
10. Pack electrode with compound tightly,so that it stands firmly in pit.
11. Pour a few bucket of water around pit.
12. Test earth resistivity of electrode. If satisfactory, connect it with
equipment.
13. If result is not satisfactory, give some time for electrode system to
14. Then check ohmic value and connect with equipment.
SAFETY MEASURES:-
a. Do not drop earthling electrode in pit.
b. Do not use force to drive electrode into pit.
c. Do not hammer or cut electrode while installing.
d. Remove transparent plastic cover before installation.
f. After installation pour a few buckets of water in and around pit for 18-20 days. This helps system to set.
g. if soil in pit sinks, fill with mother soil.
h. apply petroleum jelly on terminal and connect with equipment.
__________________________________________________________________________________________________________________
Proper installation is the key to successful performance of the electrode
installation Guideline for SOR Earthing Electrode
1. Augur/Drill/Bore a hole oa8/10 inches in diameter to
5. Place naked electrode at center of pit.
top portionof electrode.
ser in soil.
15. In hard soil conditions, do not mix compound with dug out soil.Use backfill compound only with water as above.
e. Ensure that electrode terminal and green color patch are above soil.
i. Ensure that full length of electrode remains buried in soil at all times.
f. After installation pour a few buckets of water in and around pit for 18-20 days. This helps system to set.
__________________________________________________________________________________________________________________
Proper installation is the key to successful performance of the electrode
installation Guideline for SOR Earthing Electrode
15. In hard soil conditions, do not mix compound with dug out soil.Use backfill compound only with water as above.
CPRI APPROVED
Recommended