Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
1
Contents Executive Summary Page 2
Detailed Project Schedule Summary Page 3
Site Layout Planning Summary Page11
Assemblies Estimate Summary Page 13
Detailed Structural Systems Summary Page 24
General Conditions Estimate Summary Page 30
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
2
Executive Summary Some of the main features that have been analyzed and researched on the Harrisburg University of Science and Technology’s Academic Center are: detailed construction schedule, construction site plan layouts, assemblies, detailed, and general conditions estimates relative to the construction of the project. The contractual relationships are based on a CM at risk and joint venture delivery method. The project is also fast tracked so that construction can begin as soon as possible. Time and budget restraints in funding are the only concerns for the owner at this time. The schedule for construction indicates a start date of the beginning of January 2007 and completion date is set for November 25, 2008. Key milestone dates are also noted on the schedule as well. Early delays due to weather and improper placement of the tower crane have caused the schedule to vary, however the work is underway and on time. The site plan developed is the one currently in use as the tower crane is located on site until early spring of 2008. Pictures have been taken to document the construction process as well. Various estimates for the project have been assembled and have been thoroughly reviewed and analyzed to determine whether the Harrisburg University Academic Center is within budget. The assemblies estimate looks at the interior finishes of the building using RS Means data; the detailed estimate is of the electrical system using MC2 software; and the general conditions estimate was performed using Timerline software.
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
3
A. Detailed Project Schedule Summary
The Harrisburg University of Science and Technology had begun design work for their first building in August of 2005, not yet two years after the University opened its doors for students. It has been using office buildings within three blocks of the construction site of their Academic Center and will be occupying them until the winter semester of 2009. The project completion date is set for November 25, 2008. Finish sequence milestones begin at the end of the first quarter in 2008-the middle of March with the first two floors clean-out scheduled. The next five floors (3-9) will be for a parking garage and therefore finishing of these levels will come near project completion. Floors 10 and 11 have a finish date of the beginning of April and finishes for the last (16th) floor where the HVAC system will be housed is scheduled for late October 2008. For the core-shell package, interior work is completed in a sequence that allows for phased finishing by floor. Each crew works each floor start to finish and then moves on to the floor above to repeat the process. This sequencing method allows for the substantial completion of the building, the project to be fast-tracked, and have separate core-shell and fit-out packages with more than 60 contracts. The phased completion of each floor is in approximate two week increments, with some slight differences in the parking garage levels. The following pages consist of the construction schedule, first of which is the preliminary overview schedule, continued by a detailed schedule with highlights of each floor. Due to the events of construction and the complexity of the project, many items were left out but the milestone dates and general durations are noted.
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
4
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
5
Days
AUG
2005
- DEC
06J
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D
Cura
tin W
all Sh
op D
rawi
ngs
15Fi
t Out
Gen
eral
Trad
es15
Grou
nd F
loor D
uct D
rawi
ngs
15Fi
t Out
MEP
60Co
re an
d She
ll Tec
hnolo
gy60
Fit O
ut T
echn
ology
60W
ood V
enee
r Wall
Cov
ering
/Cas
ewor
k Moc
kup
15Ca
st-in-
Plac
e Plum
bing E
quipm
ent F
ab10
Arch
itectu
ral P
reca
st Pa
nel C
onne
ction
s55
HVAC
Pum
ps an
d Hea
t Exc
hang
ers D
elive
ry30
Switc
hgea
r60
Elev
ators
130
Woo
d Cas
ewor
k60
Demo
Stor
m Sw
ear P
iping
at 4t
h stre
et1
Site F
ire L
ine1
Site D
omes
tic W
ater
1In
stall 1
5inch
Sinit
ary t
o Mar
ket S
treet
Sewe
r5
Insta
ll Gas
Supp
ly Un
derg
roun
d1
Insta
ll 8 in
ch C
WS/
CWR
5 2In
stall T
eleph
one U
nder
grou
nd2
Insta
ll Eme
rgen
cy G
ener
ator
2
Repre
sents
key m
ilesto
ne da
tes as
per d
iscuss
ion of
proje
ct sch
edule
with
owne
r requ
ireme
nts fo
r occu
pancy
, espec
ially
comple
tion.
HARR
ISBU
RG U
NIVE
RSIT
Y AC
ADEM
IC C
ENTE
RDE
TAIL
ED P
ROJE
CT SC
HEDU
LE
SEP
13 0
7SE
P 14
07
SEP
13 0
7SE
P 14
07
SEP
07 0
7SE
P 14
07
Insta
ll CAT
5 Un
derg
roun
dSE
P 13
07
SEP
14 0
7
SEP
06 0
7SE
P 13
07
SEP
07 0
7SE
P 07
07
AUG
29 0
7AU
G 29
07
AUG
29 0
7AU
G 29
07
APR
10 0
8JU
L 03
08
JUL
25 0
7JU
L 25
07
AUG
15 0
7NO
V 07
07
AUG
15 0
7FE
B 20
08
JUL
25 0
7OC
T 10
07
AUG
08 0
7SE
P 19
07
MAR
20 0
8AP
R 09
08
JUL
25 0
7AU
G 07
07
AUG
11 0
7NO
V 07
07
AUG
11 0
7NO
V 07
07
JUL
25 0
7AU
G 14
07
JUL
25 0
7OC
T 17
07
2008
JUL
11 0
7JU
L 31
07
JUL
25 0
7AU
G 14
07
Activ
ity D
escri
ption
Star
tFi
nish
2007
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
6
Days
AUG
2005
- DEC
06J
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D
Towe
r Cra
ne in
Plac
e17
8In
stall
North
4th S
treet
PPL
Vault
5M
an/M
ateria
l Lift
in P
lace
251
Pour
Slab
on G
rade
Whe
re R
eq'd
For E
quip.
11s
t Flo
orSe
t Stee
l Stai
rway
s6
Prep
and P
our 1
st Fl
oor S
lab5
Exter
ior W
all C
MU
5Ab
ove G
roun
d San
itary
Pipi
ng16
Inter
ior M
etal S
tud W
all F
rami
ng10
Dryw
all5
2nd
Floo
rSe
t Stee
l Stai
rway
s6
Weld
Nels
on St
uds
2Sp
ray o
n Ins
ulatio
n to R
oof D
eck A
bove
53r
d Fl
oor
Erec
t 3rd
Floo
r Colu
mns a
nd 4t
h Fl S
tructu
ral
7Er
ect 3
rd F
loor D
etail a
nd D
eck
10Pr
ep an
d Pou
r 3rd
Floo
r Slab
5Te
mpor
ary H
andr
ails a
t Floo
r Ope
nings
24t
h Fl
oor
Erec
t Floo
r Colu
mns a
nd 5t
h Fl S
tructu
ral
7Pr
ep an
d Pou
r Floo
r Slab
5 10Ca
ble R
ails
55t
h Fl
oor
Erec
t Floo
r Colu
mns a
nd 6t
h Fl S
tructu
ral
7
Repr
esents
key m
ilesto
ne da
tes as
per d
iscuss
ion of
proje
ct sch
edule
with
owne
r requ
ireme
nts fo
r occu
panc
y, esp
eciall
y com
pletio
n.
SEP
27 0
7
HARR
ISBU
RG U
NIVE
RSIT
Y AC
ADEM
IC C
ENTE
RDE
TAIL
ED P
ROJE
CT SC
HEDU
LE
SEP
13 0
7OC
T 03
07
AUG
08 0
7AU
G 16
07
JUL
30 0
7SE
P 11
07
Conc
rete
Colum
n Enc
asem
ent
SEP
06 0
7SE
P 26
07
SEP
10 0
7SE
P 11
07
AUG
07 0
7
JUL
24 0
7AU
G 06
07
AUG
29 0
7SE
P 05
07
SEP
14 0
7SE
P 19
07
JUL
19 0
7JU
L 27
07
JUL
24 07
SEP
05 0
7AU
G 07
07
AUG
08 0
7
OCT
02 0
7OC
T 15
07
OCT
23 0
7OC
T 29
07
SEP
07 0
7SE
P 13
07
SEP
07 0
7SE
P 28
07
JUL
23 0
7JU
L 31
07
AUG
16 0
7AU
G 22
07
SEP
12 0
7SE
P 08
08
JUL
25 0
7JU
L 25
07
JUN
11 0
7FE
B 24
08
JUL
25 0
7JU
L 31
07
Activ
ity D
escr
iption
Star
tFi
nish
2007
2008
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
7
Days
AUG
2005
- DEC
06J
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D
Erec
t Floo
r Deta
il and
Dec
k7
Insta
ll Pi
pe an
d Duc
t Han
gers
10Se
t Duc
t in C
hase
s5
6th
Floo
rEr
ect F
loor C
olumn
s and
7th F
l Stru
ctura
l2
Erec
t Floo
r Deta
il and
Dec
k7
Erec
t Pre
cast
Pane
ls10
Stair
way,
Elev
Shaft
, Ver
t Cha
se M
ason
ry3
7th
Floo
rEr
ect F
loor C
olumn
s and
8th F
l Stru
ctura
l6
Erec
t Floo
r Deta
il and
Dec
k7
Insta
ll Pi
pe an
d Duc
t Han
gers
10HV
AC P
iping
5Ga
s Pipi
ng5
8th
Floo
rEr
ect F
loor C
olumn
s and
9th F
l Stru
ctura
l1
Erec
t Floo
r Deta
il and
Dec
k7
Set S
teel S
tairw
ays
10Ca
ble R
ails
6Sp
ray o
n Fire
proo
fing
59t
h Fl
oor
Erec
t Floo
r Deta
il and
Dec
k5
Erec
t Floo
r Colu
mns a
nd 10
th F
l Stru
ctura
l10 6
Conc
rete
Colum
n Enc
asem
ent
10Te
mpor
ary H
andr
ails a
t Floo
r Ope
nings
2
Repr
esents
key m
ilesto
ne da
tes as
per d
iscuss
ion of
proje
ct sch
edule
with
owne
r requ
ireme
nts fo
r occu
panc
y, espe
cially
comp
letion
.
OCT
15 0
7
NOV
12 0
7
HARR
ISBU
RG U
NIVE
RSIT
Y AC
ADEM
IC C
ENTE
RDE
TAIL
ED P
ROJE
CT SC
HEDU
LE
OCT
30 0
7NO
V 12
07
NOV
01 0
7NO
V 02
07
SEP
19 0
7SE
P 26
07
Prep
and P
our F
loor S
labOC
T 23
07
OCT
29 0
7
NOV
15 0
7SE
P 18
07
OCT
01 0
7
OCT
23 0
7NO
V 06
07
NOV
21 0
7
SEP
07 0
7SE
P 07
07
OCT
02 0
7OC
T 30
07
DEC
06 0
7DE
C 12
07
DEC
07 0
7DE
C 12
07
AUG
08 0
7SE
P 11
07
AUG
08 07
OCT
29 0
7
NOV
15 0
7NO
V 19
07
NOV
27 0
7DE
C 04
07
AUG
17 0
7AU
G 27
07
SEP
12 0
7SE
P 25
07
OCT
03 0
7OC
T 09
07
NOV
14 0
7NO
V 15
07
AUG
08 0
7AU
G 16
07AU
G 08
07
AUG
21 0
7
Activ
ity D
escr
iption
Star
tFi
nish
2007
2008
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
8
Days
AUG
2005
- DEC
06J
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D
10th
Flo
orEr
ect F
loor C
olum
ns an
d 11t
h Fl
Stru
ctura
l6
Erec
t Flo
or D
etail
and D
eck
7Se
t Hol
low
Met
al Fr
ames
3In
stall
Pipe
and D
uct H
ange
rs5
Gas
Pipi
ng6
Acid
Was
te P
iping
7Dr
ywall
and I
nsul
ate E
xter
ior W
alls
1511
th F
loor
Erec
t Floo
r Colu
mns
and 1
2th
Fl S
tructu
ral
6Er
ect F
loor
Det
ail an
d Dec
k7
Elec
trica
l Rou
gh In
s5
Lab V
acuu
m5
Elec
trica
l Wall
Rou
gh In
s and
Slee
ves
312
th F
loor
Erec
t Floo
r Colu
mns
and 1
3th
Fl S
tructu
ral
6Er
ect F
loor
Det
ail an
d Dec
k7
Sprin
kler
Rou
gh In
s2
Stor
mwa
ter P
iping
2Dr
ywall
Mec
hani
cal C
hase
s6
13th
Flo
orEr
ect F
loor C
olum
ns an
d 14t
h Fl
Stru
ctura
l3
Erec
t Flo
or D
etail
and D
eck
6 18Pl
umbin
g Pi
pe In
sulat
ion12
Plum
bing
Fixt
ures
8
Repr
esents
key m
ilesto
ne da
tes as
per d
iscus
sion o
f pro
ject s
ched
ule w
ith ow
ner r
equir
emen
ts for
occu
panc
y, esp
eciall
y com
pletio
n.
OCT
30 0
7OC
T 23
07
MAR
03 0
8M
AR 26
08
HARR
ISBU
RG U
NIVE
RSIT
Y AC
ADEM
IC C
ENTE
RDE
TAIL
ED P
ROJE
CT SC
HEDU
LE
MAR
11 0
8M
AR 26
08
APR
25 0
8M
AY 06
08
Dom
estic
Wat
er P
iping
OCT
23 0
7OC
T 31
07
JAN
22 0
8JA
N 29
08
JAN
11 0
8JA
N 14
08
JAN
21 0
8JA
N 22
08
OCT
16 0
7OC
T 23
07
NOV
01 0
7NO
V 09
07
NOV
15 0
7NO
V 21
07
JAN
16 0
8JA
N 18
08
OCT
O5 0
7OC
T 15
07
OCT
16 0
7OC
T 22
07
JAN
02 0
8JA
N 22
08
OCT
O5 0
7OC
T 12
07
DEC
31 0
7JA
N 08
08
JAN
02 0
8JA
N 10
08
NOV
14 0
7NO
V 16
07
NOV
15 0
7NO
V 21
07
SEP
27 0
7OC
T 04
07
OCT
16 0
7OC
T 24
07
Activ
ity D
escr
iption
Star
tFi
nish
2007
2008
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
9
Days
AUG
2005
- DEC
06J
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D
14th
Flo
orEr
ect F
loor C
olumn
s and
15th
Fl S
tructu
ral
5Er
ect F
loor D
etail a
nd D
eck
7W
ater F
eatu
re5
Wate
rpro
ofing
2St
airwa
y, El
ev Sh
aft, V
ert C
hase
Mas
onry
615
th F
loor
Erec
t Floo
r Colu
mns a
nd 16
th F
l Stru
ctura
l5
Erec
t Floo
r Deta
il and
Dec
k7
Weld
Nels
on St
uds
2Pr
ep an
d pou
r Floo
r Slab
s4
Ductw
ork
15HV
AC P
iping
1516
th F
loor
Erec
t Floo
r Colu
mns a
nd R
oof S
tructu
ral
3Er
ect F
loor D
etail a
nd D
eck
7In
fill St
eel a
nd Sl
ab A
bove
Chil
ler3
Prep
and p
our F
loor S
labs
4Er
ect F
loor P
erim
eter R
oof S
tructu
re2
Insta
ll Pipe
and D
uct H
ange
rs5
Acid
Vent
Pipi
ng5
Erec
t Roo
f Dec
k7 5
Insta
ll Wind
ow W
ashe
r Tie-
Off A
ncho
rs5
Roof
Insu
lation
5
Repre
sents
key m
ilesto
ne da
tes as
per d
iscuss
ion of
proje
ct sch
edule
with
owner
requ
ireme
nts fo
r occu
pancy
, espec
ially
comple
tion.
JAN
29 0
8
HARR
ISBU
RG U
NIVE
RSIT
Y AC
ADEM
IC C
ENTE
RDE
TAIL
ED P
ROJE
CT SC
HEDU
LE
DEC
21 0
7DE
C 28
07
FEB
19 0
8FE
B 25
08
DEC
12 0
7DE
C 20
07
Erec
t and
Glaz
e Nor
th C
urtai
n Wall
DEC
21 0
7DE
C 28
07
FEB
19 0
8FE
B 25
08
APR
16 0
8AP
R 22
08
JAN
10 0
8JA
N 15
08
FEB
11 08
FEB
12 0
8
DEC
03 0
7DE
C 11
07
JAN
07 0
8JA
N 09
08
MAR
10 0
8M
AR 28
08
NOV
14 0
7NO
V 16
07
DEC
21 07
DEC
27 0
7FE
B 18
08
MAR
07 0
8
NOV
19 0
7NO
V 30
07
DEC
03 0
7DE
C 04
07
FEB
06 0
8FE
B 13
08
NOV
07 0
7NO
V 13
07
DEC
11 0
7FE
B 04
08
FEB
05 0
8FE
B 06
08
OCT
31 07
NOV
06 0
7DE
C 03
07
Activ
ity D
escrip
tion
Star
tFi
nish
2007
2008
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
10
Days
AUG
2005
- DEC
06J
FM
AM
JJ
AS
ON
DJ
FM
AM
JJ
AS
ON
D
Elev
Mec
h Roo
m Fr
amin
g an
d She
athin
g5
EPDM
Roo
fing
5In
stall
Elev
ators
90Er
ect a
nd G
laze S
outh
Cur
tain W
all5
Fina
l Clea
ning
of R
oof
5On
Site
Desig
n Ses
sion
1On
Site
Desig
n Ses
sion
110
0% C
Ds Is
sued
by R
eyno
lds
1Bi
ddin
g Ph
ase o
f Fit
Out
20Ne
gotia
tion a
nd A
ward
42Of
fsite
Netw
ork S
ystem
s Bur
n In
58Bu
ildin
g Ne
twor
k Con
struc
tion P
hase
78On
site N
etwor
k Ins
tallat
ion
27Ne
twor
k Com
miss
ionin
g an
d Uni
v Mov
e In
77Fi
t Out
Subs
tantia
l Com
pletio
n0
Punc
h List
s18
Fit O
ut C
omple
tion
0
Repr
esents
key m
ilesto
ne da
tes as
per d
iscuss
ion of
proje
ct sch
edule
with
owne
r req
uirem
ents
for oc
cupa
ncy,
especi
ally c
omple
tion.
HARR
ISBU
RG U
NIVE
RSIT
Y AC
ADEM
IC C
ENTE
RDE
TAIL
ED P
ROJE
CT SC
HEDU
LE
NOV
17 0
8NO
V 17
08
OCT
22 0
8OC
T 22
08
OCT
23 0
8DE
C 19
08
JUL
24 0
8AU
G 29
08
SEP
02 0
8DE
C 19
08
MAY
01 0
8JU
L 23
08
MAY
01 0
8AU
G 20
08
FEB
01 0
8FE
B 28
08
MAR
03 0
8AP
R 29
08
DEC
07 0
7DE
C 07
07
JAN
31 0
8JA
N 31
08
JUN
18 0
8JU
N 12
08
NOV
01 0
7NO
V 01
07
APR
24 0
8AU
G 29
08
SEP
09 0
8SE
P 15
08
FEB
19 0
8FE
B 25
08
MAR
06 0
8M
AR 12
08
Activ
ity D
escr
iption
Star
tFi
nish
2007
2008
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
11
B. Site Layout Planning
Photo taken 08.15.2007 from Market Street, South corner of site
With a congested site area, project planning and utility of space is critical. The site for the Harrisburg University Academic Center is located on the West corner of the intersection of Market and North 4th Streets. Traffic patterns changed as one block of Market Street became one lane and a block of North 4th Street closed for the duration of the project. Site storage due to an alley not in use on the North façade of the building created an abundance for material storage, especially precast and glazing, which could also be protected. The office, crane, dumpster, entrances, fencing are located on the site plan on the following page. Not pictured are the portable toilets that are repositioned upon request to the crane operator who places them as needed on a set floor.
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
12
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
13
C. Assemblies Estimate Summary
For the atmosphere of the building, the architect considered many things for this building when designing. Today, most technology facilities for universities consist of vast open spaces and glazed curtain wall system. For this estimate, the finishes of the interior were chosen because of the large bid package and complexity of the interior.
Rendering by Burt,Hill of the conference gallery
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
14
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
15
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
16
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
17
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
18
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
19
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
20
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
21
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
22
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
23
Item
Qua
ntity
Subc
ontr
act
Tot
alU
nit C
ost
Amou
ntU
nit C
ost
Amou
ntRu
bber
Bas
e 4''
6900
lf.95
/lf
9226
.65/l
f63
0530
094
Carp
et13
60 sy
5.00/
sy78
5037
/sy
5673
590
898
Spec
ial F
loor
ing-
Cork
1720
017
200
Pain
t Wal
ls65
000
6500
0Pa
int C
eilin
gs25
500
2550
0Ep
oxy
Coat
ing
3100
0 sf
.75/s
f22
654
.50/s
f15
450
3909
3W
all C
over
ing-
Viny
l27
700
2770
0Fl
oorin
g Li
nole
um65
750
6575
0Ce
ram
ic an
d G
laze
d Ti
le71
1939
7119
392x
2 Ce
iling
Pan
els
2956
5029
5650
4x4
Ceili
ng P
anel
s23
00 sf
1.23/
sf54
.7963
854
Soun
d Ab
sorb
ing
Ceili
ng90
.770
200
7020
0
Tot
al F
inish
Con
trac
t Val
ue:
$2,0
26,5
58
Labo
rM
ater
ial
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
24
D. Detailed Electrical Systems Estimate An estimate for the electrical system was done using MC2 software. Due to the technical nature of the project, a university of science and technology, a detailed cost analysis of the electrical was found most appropriate.
Actual Electrical Package: $6,986,981
SF Electrical: $18.83 The differences in cost are due to the fact that the detailed estimate performed did not
include contractor mark-ups and fees and city permits that were in the bid package. The parking garage and electrical sub-grade were also not taken into account in the estimate.
Detailed Estimate of Materials: $2,434,576 SF Estimate of Materials: $10.14 From a conversation with the field superindent during August of 2007, a general rule of
thumb for the labor in the Harrisburg area for electrical work is 85-90% of material costs. With this in consideration, labor for the project at 85% of the cost added to the cost of
materials would be $4,382,237. Detailed Electrical Estimate: $4, 382,237 SF Detailed Electrical: $18.25
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
25
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
26
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
27
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
28
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
29
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
30
E. General Conditions Estimate A General Conditions Estimate was done using Timberline software and cost data reports obtained from Reynolds Construction Management. It includes project staffing costs as well as unit and lump sum costs incurred by the construction manager. Their on-site office will be the first two floors with temporary utilities during the winter of 2007/2008 until project closing, reducing mobilization costs. Approximate total for General Conditions: $2.5 million.
Temporary office trailer on the East corner of the project site, facing Market Street.
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
31
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
32
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
33
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
34
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
35
Harrisburg University Academic Center Technical Report 2
Laurel Heather Warner
36