SeaGen: A flagship project for the Ocean Industry
Sven Stoye/David Langston, Marine Current Turbines, November 2014
ICOE Halifax
ICOE Halifax Page 2 S Stoye / D Langston
SeaGen Predecessors
ICOE Halifax Page 3 S Stoye / D Langston
SeaGen
ICOE Halifax Page 4 S Stoye / D Langston
Flagship Project
• The world’s first utility scale grid connected tidal turbine • Installed in 2008 • Installed in Strangford Lough, Northern Ireland
ICOE Halifax Page 5 S Stoye / D Langston
SeaGen
ICOE Halifax Page 6 S Stoye / D Langston
• Rated Power Output 1.2MW (2 x 600kW) at 2.4m/s
• Twin axial flow rotors of 16m diameter with a tip speed of 12m/s
• Rotor blades can be pitched to 270° work in both directions
• Produced nearly 10GWh • Record 22.52MWh in one day • Supplies ecofriendly electricity to
approximately 1,500 homes • Rotor compensates for oscillating
pressure
SeaGen-S 1.2MW
ICOE Halifax Page 7 S Stoye / D Langston
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Apr-0
8M
ay-0
8Ju
n-08
Jul-0
8Au
g-08
Sep-
08O
ct-0
8N
ov-0
8D
ec-0
8Ja
n-09
Feb-
09M
ar-0
9Ap
r-09
May
-09
Jun-
09Ju
l-09
Aug-
09Se
p-09
Oct
-09
Nov
-09
Dec
-09
Jan-
10Fe
b-10
Mar
-10
Apr-1
0M
ay-1
0Ju
n-10
Jul-1
0Au
g-10
Sep-
10O
ct-1
0N
ov-1
0D
ec-1
0Ja
n-11
Feb-
11M
ar-1
1Ap
r-11
May
-11
Jun-
11Ju
l-11
Aug-
11Se
p-11
Oct
-11
Nov
-11
Dec
-11
Jan-
12Fe
b-12
Mar
-12
Apr-1
2M
ay-1
2Ju
n-12
Jul-1
2Au
g-12
Sep-
12O
ct-1
2N
ov-1
2D
ec-1
2Ja
n-13
Feb-
13M
ar-1
3Ap
r-13
May
-13
Jun-
13Ju
l-13
MW
h
Production history
First Power Generation
Pin failures
Loose bolts
FC Failure Coolant leak
Blade Failures
ICOE Halifax Page 8 S Stoye / D Langston
0
10
20
30
40
50
60
70
80
90
100
Avai
labi
lity
%
Raw AvailabilityCompensated for Inspections and other fault types
Power train 3: Availability Jan 12 to July 13
Remedial work Frequency Converter – Current Sensor Fault
87% compensated availability over 19 month period
94% compensated availability over 13 months
ICOE Halifax Page 9 S Stoye / D Langston
Note
mean max rotor Cp = 0.48
in range 0.45 – 0.52
Actual performance as validated by DNV
ICOE Halifax Page 10 S Stoye / D Langston
Environmental lessons learnt
Strangford Lough assigned many European environmental designations Regulator imposed intensive 3 year post installation monitoring requirements • SeaGen successfully operated under an Adaptive Management Approach
which is managed by a Science Group with independent chair
ICOE Halifax Page 11 S Stoye / D Langston
Environmental lessons learnt
• Passive acoustic monitoring and seal tagging demonstrated SeaGen is not a barrier to marine mammals
• Bird populations not affected • No negative impacts on benthic
community • >£2 million (3.6mCAD) has been
invested in the environmental monitoring program
ICOE Halifax Page 12 S Stoye / D Langston
Lessons learnt to enable future developments
• Operational experiences enabled upscaling of device to 1MW powertrain • Project development for further deployments informed by experiences gained
at Strangford • Component failures facilitated more robust supply chain and equipment
specification • FMEA used to improve ongoing equipment design • Input from Siemens continues to improve systems and • Maximise onshore component and system testing
ICOE Halifax Page 13 S Stoye / D Langston
1MW Drive Train Validation - NaREC
ICOE Halifax Page 14 S Stoye / D Langston
Energy Conversion Chain
Standardised 1MW Powertrain Standardised 1MW Power Electronics & Control System
ICOE Halifax Page 15 S Stoye / D Langston
Commercial product portfolio using universal Energy Conversion Chain
SeaGen-U SeaGen-F
Working with
ICOE Halifax Page 16 S Stoye / D Langston
Contact
David Langston Head of Sales and Business Development Marine Current Turbines
Tel.: +44 (0)117 957 7600
E-mail:david.langston@siemens.com
Siemens: Answers for energy. Answers for life.
ICOE Halifax Page 17 S Stoye / D Langston
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Apr-0
8M
ay-0
8Ju
n-08
Jul-0
8Au
g-08
Sep-
08O
ct-0
8N
ov-0
8D
ec-0
8Ja
n-09
Feb-
09M
ar-0
9Ap
r-09
May
-09
Jun-
09Ju
l-09
Aug-
09Se
p-09
Oct
-09
Nov
-09
Dec
-09
Jan-
10Fe
b-10
Mar
-10
Apr-1
0M
ay-1
0Ju
n-10
Jul-1
0Au
g-10
Sep-
10O
ct-1
0N
ov-1
0D
ec-1
0Ja
n-11
Feb-
11M
ar-1
1Ap
r-11
May
-11
Jun-
11Ju
l-11
Aug-
11Se
p-11
Oct
-11
Nov
-11
Dec
-11
Jan-
12Fe
b-12
Mar
-12
Apr-1
2M
ay-1
2Ju
n-12
Jul-1
2Au
g-12
Sep-
12O
ct-1
2N
ov-1
2D
ec-1
2Ja
n-13
Feb-
13M
ar-1
3Ap
r-13
May
-13
Jun-
13Ju
l-13
MW
h
Operating Constraints
MMO & Sonar on-board, daylight operation only
Weekdays
Shore sonar 09:00 to 17:00hrs
Shore sonar dawn to dusk
: 24/7 operation with
shore sonar
Recommended