Supporting ServicesPhoto Gallery
Billingsley Elementary School
Billingsley Elementary School
Billingsley Elementary School
Billingsley Elementary School
Billingsley Elementary School
Billingsley Elementary School
Billingsley Elementary School
Billingsley Elementary School
Billingsley Elementary School
Dr. Samuel A. Mudd Elementary School
Dr. Samuel A. Mudd Elementary School
Dr. Samuel A. Mudd Elementary School
Arthur Middleton Elementary SchoolOpen Space Enclosure
Arthur Middleton Elementary SchoolOpen Space Enclosure
Arthur Middleton Elementary SchoolOpen Space Enclosure
Dr. James Craik Elementary School Full Day Kindergarten Addition
Dr. James Craik Elementary School Full Day Kindergarten Addition
Berry Elementary SchoolFull Day Kindergarten Addition
Berry Elementary SchoolFull Day Kindergarten Addition
Daniel of St. Thomas Jenifer Elementary SchoolSite Improvements
Pre-K to 2nd Grade 3rd to 5th
Daniel of St. Thomas Jenifer Elementary SchoolSite Improvements
Paving and Concrete Repairs
Paving and Concrete Repairs
John Hanson Middle SchoolStorm Drainage & Flood Protection
The school has a long history of standing
water at the east end of the classroom
wing. That particular area of the school
is 2-feet below grade resulting in an
increased concern for storm drainage and
flooding. During the late 1990’s the
Director of Maintenance & Operations
implemented a French drain to alleviate
the ponding. Over the years the French
drain clogged and there was a concern for
soil saturation and overflow. Due to the
recent flooding during a 3”- 4” rain event,
the Office of Supporting Services took a
new long term solution by adding a
concrete swale with positive drainage
path away from the building reducing
concerns for both ponding and flooding
but also, a reduction in subterranean
water against the classroom space below
the ground level.
John Hanson Middle SchoolStorm Drainage & Flood Protection
CCPS has a contractor
completing some other
drainage work on site
and they quickly
mobilized to install a new
concrete swale with
positive drainage. This
solution moves water
away from the doors and
foundations in this area.
The arrows depict the
areas where drainage
piping feeds to the area
(3 roof drains and play
asphalt from left).
Guided VestibulesVestibules to direct school visitors to Admin. area for proper check-in.
Mattawoman Middle School
New Guided vestibule to admin.
Existing open access from entry doors
into school
Guided VestibulesVestibules to direct school visitors to Admin. area for proper check-in.
Daniel of St. Thomas Jenifer Elementary School
New doorway from vestibule to admin.
New doorway from vestibule to admin.
Guided VestibulesVestibules to direct school visitors to Admin. area for proper check-in.
Arthur Middleton Elementary School
View of enclosed Admin. area with door allowing entry to main corridor
View of Admin. side with new guided entry door (main corridor is beyond right wall)
Recommended