Supplier Introduction & Tutorial 17 February 2009PresenterDavid Michaud, SSC LT Chair
2
First Time Mtg AttendeesIntroduce yourself, tell us…Your NameCompany NameWhat commodity(ies) will be audited
3
Orientation AgendaI. Introduction to NadcapII. Basic Tools and AdviceIII. How to Prepare for your AuditIV. What to Expect During the AuditV. Important Post Audit InformationVI. Additional Information
4
Welcome to NadcapThe leading, worldwide cooperative program of major companies designed to manage a cost effective consensus approach to special processes and products and provide continual improvement within the aerospace industry.
Nadcap is an industry managed program.
Slide 5
Slide 6
Slide 7
Slide 8
Industry experts manage all key steps
Industry ManagedIndustry Managed
Slide 9Executive leaders•Legal entity•Fiduciary responsibility•Set policy•Provide the Vision
Senior quality leaders & managers
•Oversee operation of Nadcap
•Establish & implement policies and procedures
•Task group coordination & development
•Identify, develop and deploy improvement
Technical Experts
•Determine requirements
•Develop documents
•Accept corrective action
•Final decision on accreditation
Policy
Tactical
Technical
StrategicSupplier Group
•Work on systemic issues
•Supplier mentoring
•Survey
•Special projects
10
Industry-Managed Industry-Managed Active Customer Audits/CertsActive Customer Audits/Certs
11
Nadcap eAuditNet Process
Slide 12
Slide 13
Staff Contacts
Supplier, Subscriber & Meeting info
14
Nadcap Procedure HierarchyAS7003
Aerospace Standard which documents the requirements for implementing Nadcap industry consensus-based
accreditation programs.
Quality Manual
Quality policy describing the quality system of the organization.
NOP (Nadcap Operating Procedure)
Specific procedures by which Nadcap operates.
NTGOP (Nadcap Task Group Operating Procedure)
Scope and general operating procedures
for each specific PRI/Nadcap
commodity program.
NIP (Nadcap Internal Procedure)
Specific procedures by which PRI/Nadcap
Staff operates.
Auditor Handbook
Roles and responsibilities for Nadcap Auditors, and clarifications
to facilitate and standardize the audit process.
15
Pre-Assessment Audit• You can schedule a pre-assessment audit using a Nadcap
auditor BEFORE your actual Nadcap audit.• Three types; procedural review, complete documentation
review, full scope audit. • All the data from the audit will be left with you. There is no
need to close out any findings with Nadcap.• If there is a finding which clearly may affect or has affected
product, it will be sent to the Primes. • Contact PRI Scheduling for more information.
16
A Nadcap Audit is . . . • The most thorough and comprehensive audit you
probably have ever had.• Conducted by experts in the field with technical
special process knowledge and background.
The more you
prepare the
greater success
you
will have!
17
Quality System ApprovalBefore you receive a Nadcap special process accreditation,
your quality system must be approved:Nadcap recognized quality system approvals:
AS9003 and AS/EN/JISQ 9100 quality system approvals performed by approved registrars - listed in the IAQG Oasis database. (www.iaqg.org/oasis). Product groups require AS9100.
ISO/IEC 17025 for testing laboratories (AC7101), must
cover the Nadcap scope of accreditation and be from an approved NACLA/ILAC accreditation body.
If you have neither of these, you will need a Nadcap AQS audit to AC7004 or AC7006 (labs) to support the special process accreditation.
Refer to NOP-002 in www.eAuditNet.com.
18
Quality System Approval (Cont’d)
Suppliers scheduling an initial Nadcap audit shall provide PRI a recognized quality system certification prior to the time the audit is entered into eAuditNet or an AC7004 assessment audit shall be scheduled, unless the Task Group requires more than AC7004.
For reaccreditation audits, where no existing recognized quality system approval exists, Suppliers shall have two options:
• a minimum of 90 days prior to the audit start date schedule an assessment to AC7004, unless TG requires more than AC7004
• provide PRI a valid Quality System accreditation certificate no later than 60 days following the end of the Nadcap audit
Suppliers who fail to provide a valid quality system accreditation certificate to PRI by this date shall have the process audit automatically failed without further notice.
19
Additional Tools• Use the tools on www.eAuditNet.com
– Tutorials– Audit Handbooks– Checklists
• Contact your customers to verify the audit scope.
• Read the preparation instructions for your commodity. You must send certain documents (quality manual, procedures, etc.) to your auditor AT LEAST 30 days prior to your audit.
• Familiarize yourself with www.pri-network.org. – Courses and reference guides such as
NCSI, RCCA, etc.– Nadcap meeting information
• Keep your management informed and involved.
• Time spent on preparation will save even more time after the audit.
Do your
Own Job
Audits!
20
Job AuditJob Audits: a key part of the Nadcap audit is the job audit.
A job audit is a step by step review of all processing on actual hardware evaluating how you meet your customer requirements.
Each special process family has a numbers of job audits that will be conducted with the special process checklist.
21
Job Audit (Cont’d) Schedule the Nadcap audit when you can perform as many of the job audits as
possible.
Work with PRI scheduling and your internal (company) scheduling to ensure you will have jobs for the audit.
Example:Try to schedule the audit on days of the week you may have more work (Tuesday through Friday vs. Monday through Thursday)
If possible, avoid scheduling audits when your larger customers are shut down.
You should have available a REAL part from a Nadcap aerospace Prime
NOTE: Each Task Group has specific requirements. You MUST review the
Audit Checklist for specific details and speak to the Staff Engineer if you will not have a part from a Nadcap aerospace Prime at the time of your audit.
22
Supplier Mentoring• SSC has established a mentoring program for suppliers• The program matches suppliers who need assistance
with experienced suppliers who can help them succeed in the Nadcap process
• Goal – educate supplier base & reduce cycle time• Go to www.pri-network.org – SSC page for more
information.
• To request a mentor, send an email to NadcapSSC@sae.org
23
Supplier Support Committee (SSC)
SSC Position in Nadcap:• The SSC is an integral part of the Nadcap
process.
• Established in NOP 001 – just like the Nadcap Task Groups.
• SSC Chair is a voting member on NMC.
• Full support from PRI Staff.
24
Supplier Support Committee Mission Statement
Our goal is to represent the supplier community and work with the Nadcap Management Council to enhance the effectiveness and economical value of the Nadcap system for the mutual benefit of suppliers and primes.
25
SSC Systemic FocusOperates independent of the Task Groups.
SSC Focus is on overall issues common to suppliers NOT technical or Task Group specific.
26
SSC Organization• SSC LT is comprised of:
– SSC Chair– SSC Vice Chair– 2 representatives from each Sector– Secretary
• Standing Committees:– Metrics– Survey
• Task Group Reps to SSC
27
Supplier Support Committee Leadership Team (SSC LT)
Derek Alty, Europe Sector Rep-Bodycote Heat Treatments Ltd
Jim Cummings, Vice Chairperson -Metal Finishing Co
Bob Custer, Americas Sector Rep-AAA Plating & Inspection Inc
Jacky Gualandri, Europe Sector Rep-SKF Aeroengine France
Slide 27
One Open PositionAsia Sector Rep
Eric Jacklin, Americas Sector Rep -F. M. Callahan & Son
David Michaud, Chairperson -Fountain Plating Co
Yoshiomi Sukesada, Asia Sector Rep -Asahi Kinzoku Kogyo Co. Ltd
Stu Sherman, Secretary -Metallurgical Processing Inc
28
SSC Activities• Supplier survey• Communiqué Flyer participation - newsletter to
Nadcap participants• SSC Metrics
• Mentoring program• Ad hoc projects (Tutorial, NMC sub-teams, etc.)
29
Nadcap Meeting Information
• Available at www.pri-network.org• Minutes & Agendas
– Keep up with Task Group activities– Participate in Task Group decisions
• Plan to attend Open Meetings – Suppliers are always welcome
• Attend the Supplier Support Committee (SSC) meeting
Slide 30
Nadcap Meeting Information
Slide 31
Obtain Agendas and Register for Upcoming
meetings
32
Nadcap meetings are held three times per year:
13-17 July 2009 Istanbul, Turkey
19-23 October 2009 Pittsburgh, PA, USA
Additional details can be found in the Nadcap Meeting Attendees Guide
2009 Nadcap Meetings
33
Our Web Addresses
www.pri-network.orgwww.eAuditNet.com
www.eQuaLearn.com
34
Questions?