SUMMARY OF

PT. CAKRAWALA SEJAHTERA SEJATI (CSS)STEAM COAL

 

Mining Pit (KP) : PT. Golden Great Borneo Location : Lahat, South Sumatra Area of Mining : Over 1.900 Ha Area Explored : 100 Ha Estimate Deposit : 50.000.000 MT in 100 Ha SIM : 3 : 1 (3 m coal to 1 m overburden), thickness 16 m 

Current Situation : 5 Ha are exploited, now excavating 2 pits Commence Production : About 8 (eight) months ago Production Capacity : 150.000 - 250.000 MT/month Hauling (mining to jetty) : 240 km Number of Trucks : 300 units Loading Port : Tanjung Api Api, South Sumatra Jetty : Two jetties with conveyor belt each 700

MT/hr capacity Shipping Vessel Terms : Loading rate 8.000 MT/day Price & Payment : To be adviced, by L/C at Sight from prime bank Terms of Contract : Trial shipment 30 days after

signing of contract & L/C opening whitchever is the latest

          

No.

PARAMETER STANDARD GUARANTEEDSPECIFICATION

REJECTION

1 Total Moisture ARB 31 - 35% > 37%2 Inherent Moisture ARB 10 – 15% > 17%3 Fixed Carbon ADB By Difference4 Volatile Matter ADB 38 – 45% > 45%5 Ash Contents ADB 7% > 7%6 Total Sulphur ADB 0,5% > 1 %7 Gross Calorific Value ADB 5,800 < 5,5008 Grindability Index 50-60 NA9 Size 0 – 50mm (Crushed) 0-50 mm

Above 50 mm90%10%

NA

Recommended