FUTURE ROAD MAP FOR AFFORDABLE HOUSINGFUTURE ROAD MAP FOR AFFORDABLE HOUSING
3rd November 2018
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGFUTURE ROAD MAP FOR AFFORDABLE HOUSING
HOUSING FOR 50 MILLION TO ACHIEVE BY 2022.
11/15/2018
PRIORITY ON EWS & LIG UNITS UNDER PMAY – URBAN
SUSTAINABLE BLOCK PLAN OF EWS & LIG UNITS
15-11-2018
2
INTRODUCTION:In the midst of changing socio-economic ideas and change in basic needs, we need to
know the very definition of Affordable considered by our nation, by developed, and / or by other developing economies world over. In India, 25-30 years back a small vehicle, an air-conditioner, colour TV, washing Machine
& Refrigerator was not considered while designing Residential Housing in EWS / LIG segment. Equipment type and space requirements have also changed.Today, all these household equipments and other amenities are being considered as basic needs and is being considered while designing affordable / social / low cost housing.
TYPICAL 2 B R LIG UNIT
11/15/2018
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGFUTURE ROAD MAP FOR AFFORDABLE HOUSING
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGG O I EXISTING PLAN & POLICY ON AFFORDABLE HOUSING.
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGG O I EXISTING PLAN & POLICY ON AFFORDABLE HOUSING.
11/15/2018
Government of India has implemented low cost housing policy as priority development in its Budget since 2015. G O I has also defined characters for citizen’s eligibility of Affordable Housing in this phase of changed economy, also in its sizes & characters. Affordable housing never really took off in the realm of Governments in last three / four decades, as it remained a utopian dream for over 30 years. Rajiv Awas Yojona couldn’t be complete success story as expected during its planning period and several stages since its inception.
However, PMAY scheme has identified several zone for affordable housing and selected locations in seven Metro Cities.
@
15-11-2018
3
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGFUTURE ROAD MAP FOR AFFORDABLE HOUSING
COMPLETED AFFORDABLE HOUSING UDAIPUR, RAJASTHAN. 11/15/2018
COMPLETED AFFORDABLE HOUSING UDAIPUR, RAJASTHAN.The very growth of the project retarded during these decades due to multi-disciplinary reasons of GOI / state Governments. We are aware of Launching of “Housing for All by 2022” is a Government of India initiative under which, Indira Awas Yojana was renamed as Pradhan Mantri Awas Yojana, Grameen, and another scheme Pradhan Mantri Awas Yojana, Urban. The segmentation of EWS, LIG & MIG was incorporated in Affordable Housing in 2017. Both these program of Grameen & Urban comprising 50 million dwelling units were targeted to be built by financial year 2022. The government’s budgetary support for these two schemes has been increased from Rs 11,600 crores in FY 2015-16 to Rs 29,043 crores in FY 2018-19.
Rajasthan state showed a steady & monitored growth followed by West Bengal & Tamilnadu.
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
11/15/2018
WORK IN PROGRESS - AFFORDABLE HOUSING UDAIPUR, RAJASTHAN.
To achieve the objective of housing for all by 2022, HUDCO has initiated a dual effort a) affordable housing delivery b) provision of urban infrastructure services , to facilitate implementation of all low cost Housing in the country. It envisages a major focus and thrust on low cost housing in order to achieve the national goal of home for all by 2022.
Govt. of India extended incentives benefiting in form of Tax reliefs, Interest subvention for such programs.It may be added that IGBC, CII Integration of Green ratings in the affordable housing segmented already implemented.
15-11-2018
4
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
Looking at Social / Affordable Housing in other Developed Nations:
In developed economy Affordable Housing which is also known as Social Housing is meant for following three priority segments of the society:
a) Economically weaker sections of the society effected by unemployment,
b) Senior citizens identified as homeless
c) Working persons & students identified as homeless.
SINT-AGATHA-BERCHEM SOCIAL SOCIAL HOUSING – MELBOURNE, AUSTRALIA
HOUSING – BRUSSELS, BELGIUM FOR STUDENT REHABILATION.
HABITATION OF SENIOR CITIZENS.
11/15/2018
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGFUTURE ROAD MAP FOR AFFORDABLE HOUSING
11/15/2018
PARC CENTRAL SOCIAL HOUSING – VALENCIA, SPAIN,Non-identical towers having all sustainable properties and low grid power consumption.
Based on the requirements, Developed nations has prepared targets to provide Social Housing in phased manner and a detailed survey speaks on achievements of almost 50 % in Great Britain & 75 % in other developed nations during over three decades commencing 1985.It is also noticed that Social Housing developed in these nations since early eighties maintained sustainability and energy efficiency in accordance with their climatic conditions and need. These nations defined green affordable / social Housing as “ A dwelling unit that deploys effective use of site resources, water conservation, energy efficiency, handling of house hold waste, optimum material utilization and design for healthy, comfortable and environmentally friendly homes”.
15-11-2018
5
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
11/15/2018
In Great Britain a survey was made in recent time which shows an achievement score of about 50%, 25 % lower than other European Countries.
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
11/15/2018
WIN-WIN POLICIES NEED TO BE INTRODUCED TO PROMOTE GREEN AFFORDABLE HOUSING
According to NHB emergent housing shortage is estimated at approximately 19 million units, of which over 95% are for the Economically Weaker Sections and Low Income Groups.
The National Housing Board has estimated that an investment of INR 8.5 Lakh Crore is required to meet the affordable housing gap. Based on this estimation Government of India in its affordable housing policy may consider the followings:• Speedy construction work of EWS & LIG units in the P MAY-Urban (@ As first priority in seven cities )• Building Bye Laws need to reconsider Affordable Green Building incentives in form of higher FAR & Population Density and need base synchronization among these.•State run agencies need to support infra-structure to accommodate additional population density.•Need for single window and fast track clearances for Affordable Green Buildings to save on time and cost over runs.• Demand & Supply of dwelling units need to be monitored in PPP Policy on EWS & LIG segment.•Need of lowering down Import duty and / or GST on construction materials required in Affordable Housing.•Construction period for tax benefits need to be reconsidered based on size of the project. This will boost economic viability of affordable housing projects and faster completion target.• Faster Financial support to EWS & LIG Housing segment .• Extending subsidy in advance to Micro level / individual dwelling units by state / local agencies.• Subsidy / financial support to adopt post modern Technologies for Mass Housing.
15-11-2018
6
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGREALISTIC DESIGN OF SMALL EWS UNIT
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGREALISTIC DESIGN OF SMALL EWS UNIT
• 1 BED ROOM UNIT• SUPER BUILT UP AREA – 42.9 SQ M• BED ROOM – 12.0 SQ M• LIVING,DINING,KITCHEN 17.9 SQ M• BATH WITH URINAL 4.5 SQ M • W/C & WASH BASIN 4.5 SQ M• ENTRANCE FOYER 4.0 SQ M• TOTAL BUILT UP AREA 36.51 SQ M
THIS DESIGN IS VERY ECONOMIC WITH 8 UNITS PER FLOOR & G +7 FLOORS.
NO OF UNITS PER BLOCK - 62
11/15/2018
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGDESIGN OF 1 BED ROOM LIG UNIT
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGDESIGN OF 1 BED ROOM LIG UNIT
• 1 BED ROOM UNIT• SUPER BUILT UP AREA – 49.5 SQ M• BED ROOM – 12.5 SQ M• LIVING,DINING,KITCHEN 22.0 SQ M• BATH WITH URINAL 5.5 SQ M • W/C & WASH BASIN 5.5 SQ M• ENTRANCE FOYER 4.0 SQ M• TOTAL BUILT UP AREA 42.3 SQ M
THIS DESIGN IS VERY ECONOMIC WITH 8 UNITS PER FLOOR & G +7 FLOORS.
NO OF UNITS PER BLOCK - 62
11/15/2018
15-11-2018
7
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGDESIGN OF 2 BED ROOM LIG UNIT
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGDESIGN OF 2 BED ROOM LIG UNIT
• 2 BED ROOM UNIT
• SUPER BUILT UP AREA – 61.6 SQ M
• BED ROOM 1– 11.5 SQ M
• BED ROOM 2– 12.5 SQ M
• LIVING,DINING,KITCHEN 22.6 SQ M
• BATH WITH URINAL 5.5 SQ M
• W/C & WASH BASIN 5.5 SQ M
• ENTRANCE FOYER 4.0 SQ M
• TOTAL BUILT UP AREA 52.4 SQ M
THIS DESIGN IS VERY ECONOMIC
WITH 8 UNITS PER FLOOR & G +7
FLOORS.
NO OF UNITS PER BLOCK - 62
11/15/2018
FUTURE ROAD MAP FOR AFFORDABLE HOUSING1 BED ROOM LIG BLOCK PLAN
11/15/2018
15-11-2018
8
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGINTRODUCTION OF ADVANCED TECHNOLOGY IN MASS HOUSING.
FUTURE ROAD MAP FOR AFFORDABLE HOUSINGINTRODUCTION OF ADVANCED TECHNOLOGY IN MASS HOUSING.
11/15/2018
Formwork SystemsMonolithic Concrete Construction System (a) using Plastic & (b) Aluminium Formwork
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
INTRODUCTION OF ADVANCED TECHNOLOGY IN MASS HOUSING
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
INTRODUCTION OF ADVANCED TECHNOLOGY IN MASS HOUSING
Precast Sandwich Panel Systems Sismo Building Technology
11/15/2018
15-11-2018
9
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
ENERGY SAVING MODE IN AFFORDABLE HOUSING.
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
ENERGY SAVING MODE IN AFFORDABLE HOUSING.
11/15/2018
Following features has already been adopted in ongoing affordable Housing projects in several locations in several states.
•Energy-saving appliances and low cost wall insulation that reduces utility bills;
•Water efficient toilet fixtures;
•Dual plumbing system;
•Solar energy in water heating system / in lighting
•Energy efficient Fenestration;
•Energy efficient wall quality;
•Usage of insulated panel in 2 / 3 storied houses, in semi urban areas where land cost is low,
reduce cost of construction, time and utility bills;
•air quality improvements that reduce health care expenses;
•Community and personal gardens that provide local organic produce at little cost.
FUTURE ROAD MAP FOR AFFORDABLE HOUSING
CONCLUSIONFUTURE ROAD MAP FOR AFFORDABLE HOUSING
CONCLUSION
11/15/2018
In view of the foregoing, we may consider the followings as need
of the hour for achieving desired targets :
T3 SOLUTIONS (Technology – Time – Team work )
The planning, design and construction of 20 million
dwelling units in next four years would not be
possible in ‘business as usual’ way.
.
In view of the foregoing, we may consider the followings as need
of the hour for achieving desired targets :
T3 SOLUTIONS (Technology – Time – Team work )
The planning, design and construction of 20 million
dwelling units in next four years would not be
possible in ‘business as usual’ way.
.
Recommended