SUBDIVISION ACCEPTANCE

Preview:

Citation preview

SARITA VALLEY

2A

2B

2B

2A

2B

2B

2B

3B

2B

2B

2B

RONA

LD W

REA

GAN

BLVD

BROM

E DR

ARROWFEATHER PASS

WEST

BORO

UGH L

N

SARITA DR

RABBITS TAIL DR

ZOYSIA DR

WEDGESCALE PASS

FEAT

HER R

EED D

R LYME RIDGE DR

PURP

LE M

OOR P

ASS

SUMMERBROOKE CIR

WARFIELD

PLUME CV

183A

CR 279

RM 2243

S US

183

US 183

RM 2243

± 0 300Feet

SUBDIVISION ACCEPTANCE Location Map - Sarita Valley Phase 7

Acceptance AreaSFRSFSSFU

SFC MFLCGC

CITY MAPË

This map has been produced by the City of Leander for informational purposes only. No warranty is made by the City regarding completeness or accuracy, please refer to the official ordinance for zoning verification. This data should not be construed as a legal description or survey instrument. No responsibility is assumed for damages or other liabilities due to the accuracy, availability, completeness, use or misuse of the information herein provided.

Signature Homes6/10/2021

-

$12,675.03 $0.00

$133,216.12 $127,727.65

$273,618.80

Item Qty Unit $/Unit Item Total

300 1 LS $12,675.03 $12,675.03

$12,675.03

Item Qty Unit $/Unit Item Total

$0.00

$0.00

Item Qty Unit $/Unit Item Total

400 2 EA $1,490.46 $2,980.92 410 812 LF $50.45 $40,965.40 420 3 EA $8,164.97 $24,494.91 430 1 Ea $7,771.86 $7,771.86 440 12 EA $3,414.26 $40,971.12 450 3 EA $2,599.41 $7,798.23 460 812 LF $2.54 $2,062.48 470 812 LF $3.80 $3,085.60 480 812 LF $3.80 $3,085.60

$133,216.12SUBTOTAL FOR WATER LINE IMPROVEMENTS

Water Improvements

8" C900 DR-14 PVC Waterline

Fire Hydrant Assembly

Air Release Valve

Double Water Service

General Overhead Estimate

Street and Pavement Improvements

General Overhead

Bleyl EngineeringQuantities From: Actual Bid, Contract and Change OrdersUnit Costs From: Actual Bid, Contract and Change Orders

ENGINEER'S FINAL COSTOF

PUBLIC IMPROVEMENTSProject: Sarita Valley Condos - Phase 7Project No.: 17-PICP-018

Description

Description

Utility Mobilization

None

Connection to Existing Water Stub

SUBTOTAL FOR GENERAL OVERHEAD

SUBTOTAL FOR WATER LINE IMPROVEMENTS

Single Water Service

Construction Staking

Trench SafetyWaterline Testing

SUBTOTAL FOR GENERAL OVERHEAD

SUBTOTAL FOR WATER LINE IMPROVEMENTS

TOTAL PROJECT PUBLIC IMPROVEMENTS COST

SUBTOTAL FOR WATER LINE IMPROVEMENTS

SUBTOTAL FOR WASTEWATER IMPROVEMENTS

Description

12007 Technology Blvd., Suite 150

Austin, TX  78727

(512) 454‐2400

Ph 7 (Phase 2)

Item Qty Unit $/Unit Item Total

600 1 EA $1,147.44 $1,147.44 610 576 LF $44.76 $25,781.76 620 12 EA $3,582.10 $42,985.20 630 3 EA $2,787.84 $8,363.52 640 5 EA $7,272.65 $36,363.25 650 38 LF $190.68 $7,245.84 660 576 LF $2.54 $1,463.04 670 576 LF $3.80 $2,188.80 680 576 LF $3.80 $2,188.80

$127,727.65

Steven L. Ihnen, P.E. Date

Description

Connection to Existing WW Stub

8" SDR-26 PvC WW Line

Double WW Service

Wastewater Improvements

Single WW Service

SUBTOTAL FOR WASTEWATER IMPROVEMENTS

4' Precast Concrete Manhole

12" Steel Encasement

Construction Staking

Trench SafetyWastewater Testing

Advanc ing s t r o nger , sa f e r co mmun i t i e s ac r o s s T ex as s i n c e 1 9 9 7 .

bleylengineering.com

Tex Reg. No. F‐678

06/10/2021