SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total CONCRETE & BLOCKS (Main Works)

1 Plain ConcretePlain Concrete 20Mpa-SRC Thick = 50mm

1 m3 2,117.21

1 m3 26.51

Plain Concrete 20Mpa-SRC Thick = 100mm

2 453 Benayat m3 1,616.81

2 m3 40.90

5% Micro Silica 0.00

Mass concrete > 100mm

4 m3 50.60

2 Sub-structure Concrete works 30 Mpa-SRC (w/o S.O.G)Isolated Footing

1 453 Benayat m3 4,016.75

1 m3 96.52

Strip Footing

2 453 Benayat m3 2,268.59

2 m3 76.72

Tie Beams / Grade Beams

3 453 Benayat m3 2,387.26

3 m3 126.01

Column Neck

4 453 Benayat m3 276.17

4 m3 8.51

Wall Neck

5 453 Benayat m3 827.61

Slab On Grade

6 453 Benayat m3 7,268.25

6 m3 168.67

Vapour Barrier 300 micron Polyethylene under slab on grade

7 453 Benayat m3 64,758.76

7 m3 804.09

Damp Proofing

8 453 Benayat m3 49,500.30

8 m3 2,403.46

5% Micro Silica

3 Super Structure Concrete Works - 30Mpa OPCColumn / Beams / Walls

453 Benayat526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

1 453 Benayat m3 6,327.00

1 m3 264.42

Column / Beams / Walls (with corbel)

2 453 Benayat m3 747.48

2 m3 17.57

Suspended Slab (Vary Thick)

3 453 Benayat m3 7,605.65

3 m3 132.91

Concrete Ramps, Step & Landing

4 453 Benayat m3 569.85

Fairface Finish or Concrete ramps, steps & landing 0.00

Concrete Screed

6 453 Benayat m3 444.49

6 m3 6.73

Concrete Parapet

Concrete Coping

8 453 Benayat Lm 8,502.87

8 Lm 1,443.42

1 Lm 220.50

Mechanical Pad

9 453 Benayat m3 9.07

4 Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mmSupply, Cut, Bend & Installation

1 453 Benayat ton 4,394.07

8 ton 140.02

Cut, Bend & Installation

Installation only

3 453 Benayat ton 11.12

5 Masonry WorksSupply & Installation of Blocks 200mm (CMU), Non fire rated

3.1 m2 6,470.4

1 m2 49,395.4

1 m2 98.6

Supply & Installation of Blocks 150mm (CMU), Non fire rated

3.2 295 Dar Anan m2 1,220.1

2 m2 14,809.7

2 553 Al Otaibi m2 85.2

Supply & Installation of Blocks 100mm (CMU), Non fire rated

3.3 295 Dar Anan m2 1,747.9

3 m2 20,890.9

3 553 Al Otaibi m2 56.8

3 m2 391.3

Additional Rate for Fire Rated Solid Block or / Filled Block

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan560 Nahedh Al Monshri

526 Dar Anan

295 Dar Anan453 Benayat553 Al Otaibi

453 Benayat

453 Benayat

526 Dar Anan

3.4 295 Dar Anan m2 635.3

4 m2 2,496.9

4 553 Al Otaibi m2 85.2

Backing rod (3cm thick) & fire rated sealant above block walls

5 m2 793.5

6 Plastering WorksSupply & Installation of cement plaster (Interior)

m2 3,150.0

3.13 m2 17,271.4

1 m2 76,933.6

1 m2 18,256.4

1 m2 11,000.0

Elect/LC1 pcs 18.0

Supply & Installation of cement plaster (Exterior)

2.11 295 Dar Anan m2 7,837.2

2 m2 62,339.4

550 Marim Jalani m2 -

2 560 Nahedh Al Monshri m2 11,007.6

2 562 Awan Al Awarrd m2 6,317.0

Elect/LC2 pcs 21.0

Supply & Installation of G.I. groove 20mm in plaster (external)

2.15 295 Dar Anan Lm 5,388.3

3 Lm 26,703.6

2 560 Nahedh Al Monshri Lm 5,589.3

3 562 Awan Al Awarrd Lm 1,664.0

7 Concrete Works - ADDITIONAL WORKSExtra over for SOG from 20Mpa to 30Mpa

D1 m2 7,268.25

Supply & install precast lintel above openings

D2 Lm 8,183.18

6 Lm 1,102.36

Reinforced conc beams & post for blocks walls incl rebars

D3 Lm 1,066.02

Extra over for conc negative in walls for doors & windows

D5 pcs 730.00

453 Benayat

453 Benayat

214 Marim Jalani295 Dar Anan453 Benayat560 Nahedh Al Monshri562 Awan Al Awarrd

560 Nahedh Al Monshri

453 Benayat

560 Nahedh Al Monshri

453 Benayat

453 Benayat

453 Benayat526 Dar Anan

453 Benayat

453 Benayat

Supply & install reinf conc architrave around openings

D6 Lm 2,077.50

Supply & install PVC waterstop 10mm & 15mm

D7 Lm 146.70

5 Lm 94.50

Bituminous high grade fiber filler bd joint 20mm

D9 m2 2,795.99

8 Lm 471.93

Supply & install filling tie rod holes w/ non-shrink grout

D10pcs 18,974.00

pcs 33,762.30

12 pcs 1,584.00

Supply & install concrete screed (finishing works)

1 m2 2,511.78

Supply & install broom finish (interior)

2 m2 0.00

Extra over for hardener (broom fin)

3 m2 2,352.81

Concrete window sill incl forms & rebars

7 Lm 493.03

8 Masonry Works - ADDITIONAL WORKSSupply & Installation of tie beams & post

A1 Lm 116.6

Supply & Installation of insulation board 50mm

2.5 295 Dar Anan m2 1,979.3

A2 Lm 6,203.6

553 Al Otaibi m2 -

Extra over for supply & install 200mm filled blocks - 1201 only bet prison cells

A3 m2 2,708.4

Extra over for supply & install 200mm non-filled blocks (all bldgs)

A4 m2 46,687.0

Extra over for supply & install 150mm

A5 m2 2,518.6

Extra works for blocks Scaffolding & handling works above 4.5M

2.10 295 Dar Anan m2 74.7

453 Benayat

453 Benayat526 Dar Anan

453 Benayat (around SOG)526 Dar Anan

453 Benayat (tie beams)453 Benayat (walls)526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

526 Dar Anan

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

A6 Lm 1,349.2

Supply & Installation of Blocks 300mm (100+150+50 insulation), Non fire rated

2.2 295 Dar Anan m2 863.9

Supply & Installation of 200mm preinsulated blocks

2.9 295 Dar Anan m2 2,563.7

Extra over due to using load bearing blocks

E1 m2 85,096.0

Extra over for pre-insulated blocks walls

E2 m2 4,850.6

Supply & install rigid thermal insulation board for block walls

E3 m2 8,768.2

Blocks & plaster Ht=60cm around ducts open on roofs

9.4 Lm 2,511.6

Solid blocks for MH 60x60x80 incl plastering & waterproof

4 295 Dar Anan pcs 61.4

9 Plastering Works - ADDITIONAL WORKSSupply & Installation of cement plaster, (Exterior-parapet)

2.13 295 Dar Anan m2 1,903.9

Supply & install cement plaster to ceiling (external)

B4 m2 1,530.1

Extra over Scaffolding & handling works above 4.5M (interior plaster)

3.15 295 Dar Anan m2 530.6

B5 m2 387.3

Extra over Supply & Installation of G.I. groove 20mm in plaster (external)

C1 Lm 26,703.6

Extra over for supply & install for plaster to parapet coping (external)

C2 Lm 7,315.1

Extra over Scaffolding & handling works above 4.5M (exterior plaster)

2.14 295 Dar Anan m2 1,576.2

C4 m2 10,067.8

Extra over for slabs & beams for scaffolding & handling 4mtr and above

C5 m2 260.8

Supply & Installation of cement plaster to parapet coping (Exterior)

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

453 Benayat

2.16 295 Dar Anan Lm 2,236.3

Cement plaster on circular col Ø300, Ht=2.5mm

3.16 295 Dar Anan pcs 12.8

Supply & Installation of cement linear plaster inside openings

11 295 Dar Anan Lm 4,292.9

10 EXTERIOR WORKSFence Type 2 (foundation)

1 Lm 169.33

Watch Tower (B2602)

1 pcs 2.00

pcs 3.00

Dome & Minaret

3.1 pcs 1.00

Guard Room (B2501)

4.1 pcs 5.85

Gates (along precast fence)

13.1 pcs 0.50

526 Dar Anan

526 Dar Anan562 Awarrd (blocks & plaster only)

453 Benayat

453 Benayat

453 Benayat

100 201 202 400 500 601

108.35 135.81 83.50 87.49 35.47

104.82 143.92 49.75 21.95

456.57 644.09 612.03 145.12 51.52

171.18 202.10 112.26 115.87 54.22

22.58 32.27 13.62 16.50 5.04

12.92 10.67 10.49

380.50 493.50 299.70 232.88 101.33

3,710.08 4,794.93 1,764.61 2,450.90 1,294.48

2,726.83 2,088.40 2,353.95 1,438.11 796.27

417.46 486.29 385.41 253.82 15.69

38.58

511.56 1,144.23 471.07 146.05 25.26

20.84 50.63 22.12 34.96 35.28

24.30

448.60 455.82 286.30 247.71 111.00

Steel Reinforcement (3% allowable wastage) - Straight Reinforcement bars 8 & 10, 12, 14, 16mm

275.57 414.60 288.51 139.52 43.84

3,136.5 5,991.1 3,398.7 1,043.3 852.7

1,350.0 2,065.2 1,595.4 767.8 120.8

1,547.1 2,147.7 1,601.8 356.6 174.5

204.8 396.1 16.9 50.6

6,185.0 10,837.1 6,965.0 1,834.9 961.7

5,800.0

4,117.2 5,213.8 3,668.1 2,879.7 1,105.8

3,150.0

1,720.6 2,492.7 1,787.6 936.3 525.2

2,300.0

380.50 493.50 299.70 232.88 101.33

452.75 719.20 509.60 104.74 91.50

10.00 4.00 10.00 11.00

153.49 145.77 113.86 65.72 31.77

1,147.00 1,218.00 766.00 565.00 290.00

580.00 513.00 908.00 15.00

86.48

1,309.2 1,795.2 1,484.5 120.8

Extra over for supply & install 200mm filled blocks - 1201 only bet prison cells

3,136.5 5,991.1 3,398.7 1,043.3 852.7

94.5 63.7 12.2

Supply & Installation of Blocks 300mm (100+150+50 insulation), Non fire rated

6,033.6 10,204.0 6,595.9 2,167.7 1,148.0

306.6 167.0

88.8 69.1 43.4 10.6 24.7

122.6 75.8 82.3 15.7 10.0

Extra over Scaffolding & handling works above 4.5M (interior plaster)

8.8 83.6 6.0

Extra over Supply & Installation of G.I. groove 20mm in plaster (external)

1,720.6 2,492.7 1,787.6 936.3 525.2

Extra over for supply & install for plaster to parapet coping (external)

448.6 455.8 286.3 247.7 111.0

Extra over Scaffolding & handling works above 4.5M (exterior plaster)

791.2 2,169.2 1,583.7 662.2 48.6

Extra over for slabs & beams for scaffolding & handling 4mtr and above

53.8 181.7 25.3

1.00

602 700 800 901-1 901-2 901-3

25.94

18.00

44.71

55.79

5.02

97.09

815.49

647.55

51.90

91.68

2.27

145.53

48.91

717.9

5.8

43.2

1,808.5

1,186.1

678.8

849.2

530.9

436.32

97.09

98.90

41.15

274.00

72.49

717.9

766.8

370.3

12.5

149.2

436.3

145.5

384.9

41.99

187.0

230.4

901-4 901-5 902 903-1 903-2 1001

30.60

3.18

23.39

15.86

56.02

54.43

49.94

66.57

3.61

5.36

105.38

107.00

931.79

279.03

746.17

960.65

44.89

36.69

17.57

79.70

56.71

17.90

6.73

113.00

116.12

44.36

42.76

409.0

559.0

33.2

258.6

1.3

246.5

66.8

820.0

1,168.6

481.9

798.9

247.3

242.9

105.38

110.65

103.68

32.42

303.01

247.00

747.00

80.10 167.91

80.10 167.91

23.52

246.5

559.0

229.5

1,064.1

41.6

9.0

155.9

242.9

113.0

29.0

109.7

259.9

1002 1100 1201-1 1201-2 1201-3 1201-4

61.55 150.49 150.49 150.49 152.71

54.90 152.40 152.40 152.40 152.40

44.36 154.72 154.72 154.72 154.72

115.24 375.57 375.57 375.57 375.57

44.18 73.80 73.80 73.80 73.80

4.95 7.99 7.99 7.99 7.99

34.58 100.54 100.54 100.54 100.54

229.96 506.94 506.94 506.94 506.94

2,007.13 4,930.30 4,930.30 4,930.30 4,969.74

1,458.44 3,521.96 3,521.96 3,521.96 3,559.94

191.66 504.52 504.52 504.52 504.52

128.95 128.95 128.95 128.95

236.67 448.83 448.83 448.83 448.83

30.28 30.28 30.28 40.37

54.06 100.98 100.98 100.98

323.90 468.91 625.21 625.21 625.21

110.29 314.09 314.09 314.09 315.07

1,642.1 2,325.4 2,447.8 2,447.8 2,447.8

243.5 609.5 609.5 609.5 609.5

477.9 1,770.3 1,770.3 1,770.3 1,770.3

124.5 344.9 363.1 363.1 363.1

1,783.2 4,532.9 5,741.7 5,741.7

2,091.12 2,425.4 4,608.3 4,850.8 4,850.8

947.1 1,067.6 2,028.3 2,135.1 2,135.1

229.96 506.94 506.94 506.94 506.94

157.00 530.70 530.70 530.70 530.70

78.51 124.43 124.43 124.43 124.43

28.00 131.00 131.00 131.00 131.00

71.20 287.22 287.22 287.22 287.22

82.68 232.85 232.85 232.85 232.85

396.00 1,278.00 1,278.00 1,278.00 1,278.00

1,166.00 4,561.00 4,561.00 4,561.00 4,561.00

6.6 22.0 22.0 22.0 22.0

499.6 525.9 525.9 525.9

1,642.1 1,825.8 1,921.9 1,921.9 1,921.9

124.5 329.7 329.7 329.7 329.7

285.0 294.0 300.0 300.0

2,363.5 4,705.2 4,827.6 4,827.6 4,827.6

409.7 1,559.2 1,528.0 1,559.2 1,559.2

84.1 322.7 322.7 322.7 322.7

93.4 85.1 85.1

125.6 125.6

947.1 1,067.6 2,028.3 2,135.1 2,135.1

323.9 594.0 625.2 625.2

235.1 614.7 647.1 647.1

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

2,024.6

98.6

260.6

85.2

1,424.1

56.8

327.3

85.2

1,575.00 1,575.00

1,163.7

1,102.0

2.0 2.0 2.0

809.6

320.0

85.60

27.00

1,358.7

19.2

243.2

411.5

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

2.22 2.22

39.44 39.44

37.98 37.98

354.48 113.03

128.95 20.96

219.51 87.12

10.09 10.09

312.61

82.56 18.82

11.12

2,203.0 734.3

548.6 182.9

1,593.2 531.1

326.8 108.9

2.0

2.0

0.00 0.00

477.63 159.21

258.50 86.17

4,561.00 1,368.30

22.0

473.3 157.8

1,729.7 576.6

296.7 98.9

4,344.8 1,448.3

161.4

-

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

2.0 2.0 2.0

2.0 2.0 2.0 2.0

1201-23 1201-24 1202 1204-1 1204-2 1204-3

1.0 1.0 1.0

2.0 2.0

33.2

1204-4 1301 1302 1400 1500 1601-1

87.60 142.14 144.71 145.41

82.80 135.90 87.73

86.42 103.63 193.90 195.29

159.34 309.44

62.58 110.02 228.42 206.28

7.87 10.66 29.59 18.42

59.49 137.77

291.29 555.22 570.51 473.56

2,906.47 4,697.51 4,228.68 2,914.77

2,392.98 3,864.57 3,492.22 2,604.85

259.18 482.69 220.92 197.08

7.24

399.28 452.05 173.83 498.71

113.48

11.51

354.00 550.70 480.00 480.70

169.30 273.41 179.92 251.31

343.1 2,710.2 3,094.0 2,893.9

264.8 1,073.1 394.3 1,529.7

541.4 1,738.9 360.9 742.1

46.6 456.1

58.3

4,160.6 4,019.7 6,807.2

645.0

1.0

4,036.6 5,384.9 2,901.4

1,750.0

2,328.6 2,117.9 695.0

900.0

291.29 555.22 570.51 473.56

236.55 593.10 322.30 668.00

74.19 415.60

81.00 62.00

203.85 308.90

128.90 235.73 188.80 105.57

658.00 1,709.00 1,758.00 605.00

2,167.00 4,058.00

713.5

343.1 2,710.2 3,094.0 2,893.9

181.2 498.8

1,149.2 5,522.2 3,849.2 5,165.7

667.6

530.5 1,622.5

68.6 183.9 56.6 87.6

544.0 28.0 4.3

2,328.6 2,117.9 695.0

550.7 480.0 480.7

419.6 407.0 282.7

1601-2 1601-3 1601-4 1601-5 1601-6 1602

480.00

3.65

2,572.6

883.5

65.5 101.0

5,627.5 4,341.5

8,940.0

7,056.0 3,598.0

1,163.7 905.1

3,050.0

3,040.0 1,855.0

809.6 629.7

744.9

756.0 456.0

518.70

364.48

364.48

204.40

620.6

634.4

810.0 607.5

54.19 42.15

243.2 189.16

411.5 338.9

7.20 5.60

1,558.0 1,339.9

1603 1701 1702 1900 2001 2002

133.88 97.84

68.09

245.26 161.38

256.62 154.23

29.61 14.22

473.02 324.76

2,670.84 3,034.46

3,448.06 2,237.00

269.81 204.30

395.71 265.77

31.60 56.12

552.00 403.60

4.74 4.33

235.04 161.72

3,142.4 2,387.1

1,121.2 632.9

936.4 628.0

3,402.8 3,615.2

3,597.9 2,618.9

1,499.0 1,062.9

473.02 324.76

339.25 317.70

119.60 89.56

1,071.00 628.00

533.9

3,142.4 2,387.1

5,199.9 3,648.0

1,577.1

104.1 67.4

17.4 26.1

1,499.0 1,062.9

552.0 403.6

523.9 386.5

2003 2004 2005 (1~3) 2006 2007-1 2007-2

2.01 8.19 8.19

158.10 97.60 97.60

1.87 2.91 2.91

778.5 52.0 52.0

42.8

7.4 37.2 37.2

1,028.6 496.8 400.5

114.0 114.0

0.5 0.5

681.4 393.3 393.3

545.9 241.0 241.0

62.73 54.72 54.72

53.23

53.23

19.26 43.20 43.20

87.7 310.9 310.9

138.6

41.0 66.2 66.2

84.2 63.5 63.5

141.3 88.6 88.6

99.3 158.8 127.4

2007-3 2007-4 2008-1 2008-2 2100 2201

71.62

1.67

57.25

11.47

134.48

38.69

113.38

44.03

8.73

3.15

230.51

41.03

2,324.82

241.69

1,690.42

691.45

154.89

8.19 8.19 7.35 7.35 12.02

250.27

47.51

21.17

201.26

97.60 97.60 97.60 97.60

140.87

2.91 2.91 2.76 2.76 29.80

52.0 52.0 47.5 47.5

2,009.8

119.6

37.2 37.2

84.4

496.8 496.8 524.2 555.7

3,413.4

114.0 114.0 580.0

1.0 0.5

393.3 393.3 393.3 393.3

2,389.1

660.0

241.0 241.0 305.0 305.0

659.7

430.0

230.51

347.60

54.72 54.72 26.82 26.82

75.50

168.92

512.00

421.00

399.27 399.27

399.27 399.27

43.20 43.20 14.40 14.40

2,009.8

310.9 310.9 354.2 354.2

2,213.8

644.1

67.5

243.4

66.2 66.2 62.5 66.2

37.6

659.7

201.3

63.5 63.5 63.5 63.5

370.4

88.6 88.6 88.4 88.4

158.8 158.8 56.4 56.4

2202 2301 2302 2400 2501-1 2501-2

83.11

59.98

145.51

116.68

12.73

247.42

2,583.56

1,768.38

134.67

35.95

219.49

12.09

51.68

395.00

122.63

1,771.7

97.7

58.4

2,840.4

2,450.0

1,240.0

247.42

279.90

97.53

499.00

1,771.7

1,927.7

546.0

49.1

96.9

1,240.0

395.0

236.8

1.00 1.00

2501-3 2501-4 2501-5 2501-6 2501-7 2501-8

0.85 1.00 1.00 1.00

2501-9 2502 2602-1 2602-2 2602-3 2602-4

1.00

1.00 1.00

2602-5 2602-6 2602-7 2602-8 2602-9 2602-10

1.00

2602-11 2602-12 2602-13 2602-14 2700 2800

1.00

2900 3000 3100 3201 3202A-1 3202A-2

5.65 5.65

15.52 15.52

2.65 2.65

40.05 40.05

5.35 5.59

1.20 1.30

12.68 13.70

26.31 26.31

322.00 322.00

276.75 283.82

14.35 14.35

29.64 29.64

52.60 52.60

23.70 23.76

247.7 247.7

351.8 351.8

383.0

1.0 2.5

284.0 284.0

650.0

1.0

120.6 120.6

540.0

26.31 26.31

18.00 18.00

35.33 35.33

182.00 194.00

133.79

133.79

247.7 247.7

247.7 247.7

143.0 143.0

120.6 120.6

52.6 52.6

3202A-3 3202A-4 3202A-5 3202A-6 3202A-7 3202A-8

5.65 5.65

15.52 15.52

2.65 2.65

40.05 40.05

8.72 8.24

2.54 2.35

26.88 24.86

26.31 26.31

322.00 322.00

375.64 361.52

14.35 14.35

0.40 0.40

29.64 29.64

52.60 52.60

0.00 51.80

47.70 47.70 47.70

24.93 24.82

0.23 0.23

104.1 104.1

247.7 247.7

84.9 84.9

337.2 337.2

351.8 351.8

201.3 201.3

284.0 284.0

120.6 120.6

120.6 120.6

26.31 26.31

18.00 18.00

19.71 19.71

35.33 35.33

348.00 325.00

133.79

133.79

5.75 5.75

247.7 247.7

19.2 19.2

135.8 135.8

247.7 247.7

143.0 143.0

21.4 21.4

120.6 120.6

52.6 52.6

10.7 10.7

52.6 52.6

44.5 44.5

3202A-9 3202A-10 3202A-11 3202A-12 3202A-13 3202B-1

5.22

21.66

9.63

1.06

29.00

2.65

3.40

22.09

32.83

5.43

15.41

0.97

3.92

24.05

20.64

249.62

174.13

189.47

439.30

8.86

26.09

19.61

19.73

42.80

51.80

13.43

20.10

104.1

84.9

270.4

330.0

346.0

257.4

320.0 320.0

320.0

100.8

120.0 120.0

132.0

24.05

0.00

19.71

9.32

129.00

416.00

133.79 91.74

133.79 91.74

5.75

19.2

135.8

-

100.8

42.8

3202B-2 3202B-3 3202B-4 3202B-5 3202B-6 3202B-7

38.70

70.3

53.3

280.6 280.6 280.6

260.0 67.6 260.0 260.0

108.6 108.6 108.6

91.74 91.74 91.74

91.74 91.74 91.74

17.0

116.6

3202B-8 3202B-9 3203 3204 3205 3206

1.46

1.71

3.14

4.98

0.43

4.57

59.32

57.13

4.49

4.20

22.40

38.70

3.16

54.9

59.2

280.6

108.1

260.0

62.4

108.6

4.57

2.80

5.90

45.00

91.74 28.48

91.74 28.48

54.9

54.9

62.4

22.4

3207 3208 3209 3210 L.S. 1 L.S. 2

21.00

50.2

50.2

50.2

L.S. 3 L.S. 4 L.S. 5 L.S. 6 L.S. 7 L.S. 8

4.71 7.80

14.66 29.23

54.62 54.62

156.03 156.03

54.37 84.98

8.96

8.01 16.21

160.8 230.5

49.30 45.20

L.S. 9 L.S. 10 L.S. 11 L.S. 12 L.S. 13 L.S. 14

L.S. 15 L.S. 16 Gas tank Fence ADB .

.

.

2.13 2.16 .

.

.

.

4.23 4.36 16.72 .

.

.

.

.

21.60 .

.

.

.

10.13 11.07 39.99 .

.

.

.

.

.

.

.

.

.

.

.

26.31 26.26 24.92 .

.

.

.

.

48.98 49.80 93.00 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

7.85 7.94 5.96 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

51.05 52.75 42.90 .

.

.

.

.

.

147.35 148.65 .

182.00 .

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

169.33 .

.

.

.

.

0.50

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit TotalROOF WATERPROOFINGSupply & apply complete roofing waterproofing system using APP Bituminuos Waterproofing Membrane

1 Light weight foam concrete (excl cement)1 160 Hazem m2 3,667.18 1 m2 17,202.09

2 Light weight foam concrete (incl) cement2 m2 59,725.53 2 m2 21,860.71

1 m2 -

3 Sand cement mortar cant strip 800x800mm3 123 Ameel Lm 17,688.20 9 160 Hazem Lm 1,343.60 3 322 Cretec Lm 7,998.88 9 510 Kabbani Lm 6,730.27

4 Solvent base primer ASTM D414 123 Ameel m2 45,825.38 2 160 Hazem m2 3,775.30 4 322 Cretec m2 21,223.12 2 510 Kabbani m2 18,771.39

5 4mm Single layer bituminous membrane5 123 Ameel m2 46,902.85 3 160 Hazem m2 3,675.30 4 322 Cretec m2 21,223.12 3 510 Kabbani m2 17,765.14

6 250 micron Separation layer polyethylene6 123 Ameel m2 48,735.27 4 160 Hazem m2 991.78 6 322 Cretec m2 22,010.45 4 510 Kabbani m2 17,769.94

7 Thermal insulation7 123 Ameel m2 48,155.27 5 160 Hazem m2 1,566.78 7 322 Cretec m2 22,010.45 5 510 Kabbani m2 17,769.94

8 Protection layer of non-woven geotextile Alyaf 180gr/m28 123 Ameel m2 47,735.27 6 160 Hazem m2 1,994.73 8 322 Cretec m2 22,010.45 6 510 Kabbani m2 17,769.94

9 50mm thick Crushed gravel screened at 20-30mm size9 123 Ameel m2 302.51

510 Kabbani

123 Ameel322 Cretec510 Kabbani

10 400x400x40mm Cement tiles 10 123 Ameel m2 46,777.19 8 160 Hazem m2 -

10 322 Cretec m2 24,595.48 8 510 Kabbani m2 17,769.94

11 APP bituminuos membrane skirting to roof parapet11 123 Ameel Lm 17,688.20 10 160 Hazem Lm 1,336.60 11 322 Cretec Lm 7,998.88 10 510 Kabbani Lm 6,760.87

12 Upper end of membrane w/ alumininum flashing & sealant12 123 Ameel Lm 18,118.64 11 160 Hazem Lm 410.30 12 322 Cretec Lm 7,998.88 11 510 Kabbani Lm 6,730.27

13 Treatment of drains & pipes13 123 Ameel pcs 3,356.19 12 160 Hazem pcs 73.00 13 322 Cretec pcs 1,358.28 12 510 Kabbani pcs 2,156.50

1 WET AREAS1.1 Liquid membrane Dura shield

1.1 m2 6,222.33 1.1 160 Hazem m2 517.07 2 m2 557.29

1.2 Ditto, to wall & upstands1.2 160 Hazem Lm 548.74 3 510 Kabbani Lm 909.44

1.3 Treatment of drains & pipes1.3 123 Ameel pcs 1,217.95 1.3 160 Hazem pcs 122.00 4 510 Kabbani pcs 238.00

2 TANK WATERPROOFING WORK (Basement)2.1 One coat primer & 2 layer 4+3mm thick (hor & vert)

2.1 123 Ameel m2 11,045.87 2 510 Kabbani m2 7,070.53

2.2 Supply & protection of layer of Non-woven geotextile2.2 123 Ameel m2 5,374.31 3 510 Kabbani m2 5,230.00

2.3 Ditto, to wall & upstands

2.4 Treatment of drains & pipes2.4 123 Ameel pcs 132.00

Protection board 4mm Armorproof (for external wall)6 510 Kabbani m2 1,793.29

123 Ameel

510 Kabbani

Upper end of membrane w/ alumininum flashing & sealant8 510 Kabbani Lm 305.50

3 EXTERNAL FLOOR WATER PROOFING (Electrical rooms boxes/ftg for tanks & foundation basement)3.1 Double layer modified bituminuos membrane

3.2 Protection boards 9mm around basement Lm -

3.3 MS40 protection board around wall3.3 m2 5,631.20

4 INTERNAL WATER TANK (Pitch Tar Epoxy Coating)4.1 Apply 2 consecutive coats of 500micron

4.1 123 Ameel m2 3,787.46

5 UNDERGROUND INTERNAL TANK (Epoxy Coat)5.1 Apply 2 consecutive coats of 600micron

5.1 123 Ameel m2 2,580.78

3 Epoxy Coating (Masterseal 180 or Noticoat EP 405)3.5 Application of epoxy coats on floors, walls & ceiling

3.5 123 Ameel m2 16,460.53

123 Ameel

100 201 202 400 500 601

Supply & apply complete roofing waterproofing system using APP Bituminuos Waterproofing Membrane

2,273.70 515.74 2,895.15 1,718.79 1,378.34 910.25

605.02 146.78 930.78

566.18 354.50 345.84

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

302.51

2,273.70 515.74 2,895.15

1,718.79 1,378.34 910.25

605.02 146.78 930.78

566.18 354.50 345.84

605.02 146.78 930.78

566.18 354.50 345.84

182.00 81.00 182.00

157.00 150.00 28.00

295.69 122.93 85.32

96.00 44.00

EXTERNAL FLOOR WATER PROOFING (Electrical rooms boxes/ftg for tanks & foundation basement)

602 700 800 901-1 901-2 901-3

450.20 450.20

582.63 566.50 473.81 473.95

271.20 169.69 151.20 151.20

184.82 126.60

582.63 473.81 450.20 450.20

473.95 563.05

582.63 473.81 450.20 450.20

473.95 563.05

582.63 473.81 473.81 473.81

473.95 563.05

582.63 473.81 473.81 473.81

473.95 563.05

582.63 473.81 473.81 473.81

473.95 563.05

582.63 473.81 473.81 473.81

473.95 563.05

271.20 169.69 151.20 151.20

184.82 126.60

271.20 169.69 178.62 178.62

184.82 126.60

79.00 29.00 12.00 12.00

23.00 57.00

95.98 66.79 41.90 29.32 29.32

62.20 52.55 52.55

22.00 10.00 10.00 10.00

901-4 901-5 902 903-1 903-2 1001

450.06

473.81 473.81 473.81 473.81 2,767.20

178.62 178.62 189.60 189.60

152.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

473.81 473.81 473.81 473.81

450.06

178.62 178.62 189.60 189.60

152.06

178.62 178.62 189.60 189.60

152.06

29.00 29.00 66.00 66.00

52.00

66.79 66.79 66.87 142.00

53.22

81.04

22.00 22.00

168.00

1002 1100 1201-1 1201-2 1201-3 1201-4

1,060.05

1,143.05 1,491.03 1,491.03 1,491.03

459.80 643.72

444.36 493.48

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

1,143.05 1,491.03

1,491.03 1,060.05

459.80 643.72

444.36 493.48

459.80 643.72

444.36 493.48

83.00 84.60

120.00 158.00

110.84

66.00

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

1,467.64 1,467.64 965.00 2,446.06

1,491.03 3,444.51 987.63 1,491.03

643.72 643.72

444.36 523.48 523.48 409.09 932.48

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

1,491.03 1,491.03

1,491.03 1,467.64 1,467.64 965.00 2,446.06

643.72 643.72

444.36 538.78 538.78 409.09 932.48

643.72 643.72

444.36 523.48 523.48 409.09 932.48

125.49 125.49

120.00 168.00 168.00 175.00 328.00

184.30

280.28

463.30

44.55

70.00

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

1,436.60 2,446.06

1,491.03 1,491.03

643.72 550.60

444.36 932.48

1,491.03 1,436.60

1,491.03 2,446.06

100.00 1,491.03 1,336.60

1,491.03 2,446.06

1,000.00 1,491.03 436.60

1,491.03 2,446.06

420.00 1,491.03 1,016.60

1,491.03 2,446.06

1,491.03 1,436.60

1,491.03 2,446.06

1,491.03 1,491.03

1,491.03 2,446.06

643.72 550.60

444.36 932.48

643.72 275.30

444.36 932.48

84.60 26.00

120.00 328.00

243.33 223.79

84.64 365.10

67.00

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

2,446.06 2,441.02

1,118.27 2,485.05

500.81 1,170.40

932.48 935.61

1,160.02 2,485.05

2,446.06 2,441.02

1,160.02 2,485.05

2,446.06 2,441.02

1,160.02 1,686.11

787.33 2,446.06 2,421.60

1,160.02 1,686.11

787.33 2,446.06 2,421.60

1,160.02 1,686.11

787.33 2,446.06 2,421.60

1,160.02 1,686.11

787.33 2,446.06 2,421.60

500.81 1,170.40

932.48 935.61

500.81 1,170.40

932.48 935.61

77.00 141.00

328.00 244.00

92.15 614.34 399.32

21.60 5.40 135.00

1201-23 1201-24 1202 1204-1 1204-2 1204-3

2,485.05 3,048.77 1,799.13 1,799.13

1,170.40 1,170.40 816.67 154.19

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

2,485.05 2,485.05 1,799.13 619.08

1,170.40 1,170.40 816.67 154.19

1,170.40 1,170.40 816.67 154.19

141.00 141.00 262.00 4.01

614.34 534.48 434.54

135.00 5.40 64.00

1204-4 1301 1302 1400 1500 1601-1

1,799.13 2,394.76 2,070.15 1,184.29

816.67 744.83

491.92

1,799.13 1,035.08

1,184.29 1,006.25

1,799.13 2,070.15

1,184.29

1,799.13 2,070.15

1,184.29

1,799.13 2,070.15

1,184.29

1,799.13 2,070.15

1,184.29

1,799.13 2,070.15

1,184.29

816.67 744.83

491.92

816.67 744.83

491.92

262.00 125.00

58.96

434.54 221.36

64.00 88.00

1601-2 1601-3 1601-4 1601-5 1601-6 1602

2,012.50

2,070.15 2,070.15 1,180.57 2,094.42 2,131.21

744.83 756.26 271.13

649.65 661.06 744.83

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

2,070.15 2,070.15 1,180.57

2,094.42 2,131.21 2,012.50

744.83 756.26 271.13

649.65 661.06 744.83

744.83 756.26 271.13

649.65 661.06 744.83

125.00 130.00 117.00

84.02 85.50 149.00

221.36

88.00

1603 1701 1702 1900 2001 2002

1,254.52 155.32 2,368.80 1,624.67 1,233.06

618.98

67.92 1,126.73 610.09 586.18

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

1,254.52

155.32 1,942.42 1,413.46 1,233.06

618.98

67.92 1,126.73 610.09 586.18

618.98

67.92 1,126.73 610.09 586.18

42.00

5.00 35.26 180.00 52.00

2003 2004 2005 (1~3) 2006 2007-1 2007-2

336.00 439.00

1,251.20 1,611.84

589.04 315.14 150.00 135.00

1,251.20 551.78 336.00 439.00

1,251.20 551.78 336.00 439.00

1,251.20 883.85 451.67

1,251.20 883.85 451.67

1,251.20 883.85 451.67

1,251.20 883.85 451.67

589.04 315.14 150.00 135.00

589.04 315.14 135.00

28.00 20.00 5.00 8.00

199.07 178.59 173.20

296.80

46.00 53.00 25.00

2007-3 2007-4 2008-1 2008-2 2100 2201

216.85 1,221.49

101.40 648.88

216.85 1,221.49

216.85 1,221.49

216.85 1,221.49

216.85 1,221.49

216.85 1,221.49

216.85 1,221.49

101.40 648.88

101.40 648.88

31.00 79.54

80.00

25.00

55.00

4.00

2202 2301 2302 2400 2501 2502

1,512.10 133.48

609.02 55.60 7.00

8.00

1,512.10 133.48 108.12

1,512.10 133.48 108.12

1,512.10 133.48

7.82

1,512.10 133.48

7.82

1,512.10 133.48 2.95

7.82

1,512.10 133.48

7.82

609.02 55.60

8.00

609.02 55.60

8.00

120.00 19.00

0.50

172.84 39.20

16.82

84.04 39.20

2602-1 2602-2 2602-3 2602-4 2602-5 2602-6

2602-7 2602-8 2602-9 2602-10 2602-11 2602-12

2602-13 2602-14 2700 2800 2900 3000

243.18 2,638.62

88.20 469.44

243.18 2,638.62

243.18 2,638.62

243.18 2,638.62

243.18 2,638.62

243.18 2,638.62

243.18

2,585.03

88.20 469.44

88.20 469.44

20.00 145.00

64.44 21.45 145.34 556.59

19.00 10.00 71.00 38.00

183.43

183.43

3100 3201 3202A-1 3202A-2 3202A-3 3202A-4

1,903.90 161.35 161.35

265.60 51.60

51.80 16.20

1,903.90 161.35

161.35

1,903.90 161.35

161.35

1,903.90 161.35

161.35 16.40

1,903.90 161.35

161.35 16.40

1,903.90 161.35

161.35 16.40

1,903.90 161.35

161.35 16.40

265.60 51.60

51.80 16.20

265.60 51.60

51.80 16.20

168.00 2.00

1.00 1.00

173.88

55.00

46.80

3202A-5 3202A-6 3202A-7 3202A-8 3202A-9 3202A-10

157.00 157.00

161.35 161.35

51.60 51.60 51.00 51.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

161.35 161.35 157.00 157.00

161.35 161.35 161.35

51.60 51.60 51.00 51.00

51.60 51.60 51.60

2.00 5.00 2.00 2.00

3202A-11 3202A-12 3202A-13 3202B-1 3202B-2 3202B-3

161.35 161.35 108.07

51.60 51.60

41.60

161.35 161.35

108.07

161.35 161.35

108.07

161.35 161.35

108.07

161.35 161.35

108.07

161.35 161.35

108.07

161.35 161.35

108.07

51.60 51.60

41.60

51.60 51.60

41.60

2.00 2.00

1.00

3202B-4 3202B-5 3202B-6 3202B-7 3202B-8 3202B-9

108.07 108.07 108.07 108.07 108.07

41.60 41.60 41.60 41.60 41.60

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

108.07 108.07 108.07 108.07 108.07

41.60 41.60 41.60 41.60 41.60

41.60 41.60 41.60 41.60 41.60

2.00 2.00 2.00 2.00 2.00

3203 3204 3205 3206 3207 3208

215.18 26.00

406.76

75.80 20.80 177.23

57.60 215.18 26.00

406.76

215.18 26.00 406.76

215.18 26.00 406.76

215.18 21.00 406.76

215.18 26.00 406.76

28.16

406.76

75.80 20.80 177.23

21.60

177.23

4.00 2.00 27.00

12.24

3.00

120.59 2,671.33 2,201.44

120.59 1,997.35 1,532.25

737.99 669.19

3,787.46

266.00 4,285.77

3209 3210 Water Tank MH's LPG Tank 1 LPG Tank 2

300.00 266.00 1,644.95 93.34 5,252.24

300.00 5,205.00

1,644.95 93.34

301.50

266.00

11,908.76

LPG Tank 3 L.S. 1 L.S. 2 L.S. 3 L.S. 4 L.S. 5

100.00 199.97 275.70 270.70 455.20 335.75

100.00 57.38 61.16 67.96 136.68 70.71

10.00 10.00 10.00 10.00 10.00

163.49 214.54 183.76 279.92 292.13

100.50 121.78 135.47 296.10 126.38

L.S. 6 L.S. 7 L.S. 8 L.S. 9 L.S. 10 L.S. 11

248.84 413.89 227.44 272.72 315.49 272.20

67.96 136.68 71.73 65.28 87.98 72.48

8.00 10.00 8.00 8.00 10.00 10.00

161.90 313.46 160.18 207.44 233.16 199.72

116.53 296.86 119.59 112.67 191.83 136.33

L.S. 12 L.S. 13 L.S. 14 L.S. 15 L.S. 16 Gas tank

433.66 209.64 507.36 269.03 236.65

94.83 65.94 120.66 68.71 61.16

10.00 8.00 10.00

340.95 143.70 381.18 200.33 175.49

176.51 130.18 279.63 127.90 112.52

Fence curbstone ..........

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

.

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total 1 PAINTING WORKS

INTERNALFLOOR

Epoxy coating system16-2 m2 1,261.9

WALLEmulsion (acrylic)

17-1214 Marim Jalani m2 17,126.5 214 Marim Jalani (elect rms) m2 877.6

4.4 m2 -

10.1 m2 4,483.0

1 m2 1,512.1

Epoxy coating system16-1 214 Marim Jalani m2 9,680.2

Vetonit repair4.7 295 Dar Anan m2 -

Extra over for wall ht >4.5m16-5 214 Marim Jalani m2 300.1

CEILINGAnti-bacterial Paint

Emulsion

18-2214 Marim Jalani m2 7,989.8 214 Marim Jalani - HCS m2 1,377.6 214 Marim Jalani (elect rms) m2 65.1

5.1 295 Dar Anan m2 27.4 2 560 Nahedh Al Monshri m2 666.1

Extra over for wall ht >4.5m

16-6214 Marim Jalani m2 2,673.0 214 Marim Jalani - HCS m2 246.0

METAL DOORS & WINDOWSBar Grill Door (BGD)

15-1 214 Marim Jalani m2 4,281.0

Access Door (AD)15-2 214 Marim Jalani m2 257.9

Hollow Metal Door (HMD)15-3 214 Marim Jalani m2 4,116.8

Full Putty Works

214 Marim Jalani

295 Dar Anan453 Benayat560 Nahedh Al Monshri

15-4 214 Marim Jalani m2 4,921.0

Bar Grill Window17-3 214 Marim Jalani pcs 1,204.4

Louver Window17-4 214 Marim Jalani pcs 32.2

ADDITIONAL WORKSElectrical rooms (exterior)

18-1 214 Marim Jalani pcs 6.3

Low current rooms (interior)18-2 214 Marim Jalani pcs 7.9

Building electrical rooms (interior)18-3 214 Marim Jalani pcs 15.3

EXTERNALWALL

Texturedm2 93,444.0

16-4 m2 3,158.4

3.2 m2 1,126.1

Maytas m2 12,699.0

Repair works

m2 148,083.4

Scaffolding for textured painting works above 4.5m Ht3.3 295 Dar Anan Lm 137.7

Textured on Parapet coping3.5 295 Dar Anan Lm 251.1

2 TILING WORKSINTERNAL

FLOORCeramic tile 100x100 (install only)

1.40 m2 43.4

Ceramic tile 200x200 (install only)1.50 295 Dar Anan m2 80.0

Ceramic tile 300x300 (install only)1.60 295 Dar Anan m2 648.3

Terrazzo tile 400x400x40 (supply/install only)1.12 295 Dar Anan m2 807.7

1 m2 985.7

Terrazzo tile 400x400x40, pattern (supply/install only)1.13 295 Dar Anan m2 186.6

197 Al Tawakl214 Marim Jalani295 Dar Anan

197 Al Tawakl

295 Dar Anan

553 Al Otaibi (install only)

Terrazzo border W=100 (supply/install only)1.15 295 Dar Anan Lm 261.9

Terrazzo border W=200 (supply/install only)1.16 295 Dar Anan Lm 77.5

Terrazzo tread 40mmx300, riser 20mmx1501.17 295 Dar Anan Lm 3.3

BASECeramic tile 100x400 (install only)

3 553 Al Otaibi Lm 735.3 Ceramic cove base (install only)

2.1 295 Dar Anan Lm 253.2 Terrazzo skirting 100x200mm (supply/install)

2.2 295 Dar Anan Lm 833.5

WALLCeramic tile 100x100 (install only)

3.8 295 Dar Anan m2 164.7

Ceramic tile 200x200 (install only)3.9 295 Dar Anan m2 1,132.7 2 553 Al Otaibi m2 118.8

Ceramic corner cove 200x200 (install only)3.11 295 Dar Anan Lm 831.0

553 Al Otaibi Lm -

100 201 202 400 500 601

3,246.2 4,017.9 406.1 92.8 105.9 22.3

4,483.0

75.0

140.0

350.0 353.7

7.7 15.8 1.6

134.4 216.4 71.4 21.6 21.0

1.4

2,371.7 2,921.0 2,122.2 1,881.0 738.6 1,716.0

3,162.2 3,894.6 2,829.6 2,508.0 984.8 2,745.6

554.1 257.5

494.5 109.9

118.8

602 700 800 901-1 901-2 901-3

80.4 343.0 343.0 24.6 44.1 44.1

210.0 226.1

382.5 135.1 189.1

2.5 9.0 9.0

37.2 42.6 38.4 38.4 38.4

465.0 457.8 502.8 502.8

586.6

417.3

620.0 712.8 610.4 670.4 670.4

28.8

32.0

224.2

123.6

148.2

3.3

309.2

99.3

104.5

177.3

901-4 901-5 902 903-1 903-2 1001

343.0 259.6 308.0 44.1 45.6

226.1 23.0 50.0

189.1 112.5 136.1

9.0 10.5

15.1

38.4 38.4 39.6 37.8 37.8

149.5

2.1 23.1

0.7

83.8 384.0

441.8 543.7 598.5

234.6 512.0

13.3

2.9

70.9 174.1

130.9

34.4

50.4

60.2

11.1

60.0

1002 1100 1201-1 1201-2 1201-3 1201-4

4.8 16.0 16.0 16.0

95.0 106.9 106.9

61.5

9.1 42.0 42.0 42.0

0.7

1,076.4 1,470.0 2,663.5 3,196.2 3,196.2 3,196.2

1,435.2 1,960.0 4,261.6 4,261.6 4,261.6 4,261.6

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

608.1 608.1 68.1 106.0

1,950.0

706.7 1,099.3 344.4 344.4

564.2 564.2 246.0

300.0 300.0 300.0

16.0 16.0 11.8 11.8

118.8

250.0 250.0 250.0 250.0

42.0 42.0 47.4 47.4

0.7 0.7 0.7 0.7

0.7 0.7 0.7

1.4 1.4 1.4 1.4

266.4 3,196.2 3,196.2 799.1 3,196.2 3,196.2

4,261.6 4,261.6 4,261.6 4,261.6 4,261.6 4,261.6

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

390.9 608.1 68.1 106.0

1,275.0 2,100.0

35.3 76.0

706.7 1,099.3 344.4

362.7 564.2

180.0 300.0 300.0

11.8 11.8 15.1 15.1

71.3 118.8 118.8

250.0 125.0 125.0 250.0

47.4 47.4 47.4 60.0

3,196.2 3,196.2 3,196.2 3,196.2

4,261.6 4,261.6 4,261.6 4,261.6

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

564.6 106.0

2,025.0

48.8

1,099.3 344.4

564.2

249.0 300.0 300.0

16.8 16.8

118.8 59.4 118.8 118.8

250.0 250.0 250.0 250.0 250.0 250.0

47.4 47.4 42.0 42.0 42.0 42.0

0.7 0.7 0.7 0.7

0.7 0.7 0.7 0.7

266.4 1,065.4 1,598.1

2,495.2 2,079.3

2,130.8 2,258.6 2,599.6

1201-23 1201-24 1202 1204-1 1204-2 1204-3

152.0 152.0

300.0 300.0 288.0 288.0 288.0

16.8 16.8 5.7

118.8 118.8 90.7 70.6

250.0 250.0 240.0 240.0 240.0

42.0 42.0 49.0 49.0 49.0

0.7

0.7 0.7 0.5 0.7

0.7 0.5 0.7

2,054.4 327.8 1,966.8

1,663.5 3,326.9 980.3

4,108.8 1,835.7 2,622.4

1204-4 1301 1302 1400 1500 1601-1

1,615.0

1,415.0

500.0

53.5

288.0

4.6

90.7 240.0

240.0

49.0 13.9 35.0 11.2

0.5

0.7

655.6 1,684.2 2,326.2 2,907.8

2,221.8

2,622.4 2,245.6 3,101.6 3,877.1

1601-2 1601-3 1601-4 1601-5 1601-6 1602

452.2

3.4

240.0 168.0 240.0 162.0

11.2 12.6 12.6 11.2

0.7 0.7 0.7 0.7 0.7

1,904.4 1,904.4 1,904.4 1,904.4

2,539.2 2,539.2 2,539.2 2,539.2

343.8

63.0

113.6

77.5

274.0

1603 1701 1702 1900 2001 2002

7.7 3.5

1.3 0.9

1,863.6 1,482.0

2,484.8 1,976.0 3,146.0

2003 2004 2005 (1~3) 2006 2007-1 2007-2

70.2 38.4 0.6 1.2

1.4

39.8

98.9

92.6

5.2

125.6

141.4

2007-3 2007-4 2008-1 2008-2 2100 2201

343.0

101.5

1.2 1.2 9.0 9.0

501.6 1,438.8

262.2 262.2 262.2

668.8 1,918.4

42.4 42.4 42.4

59.0 58.9 58.9

2202 2301 2302 2400 2501-1 2501-2

15.1 1.8 1.8

1,368.0 1,156.2 191.0 48.6 48.6

1,824.0 1,541.6 254.6 81.0 81.0

2501-3 2501-4 2501-5 2501-6 2501-7 2501-8

1.8 1.8 1.8 1.8 1.8 1.8

48.6 48.6 48.6 48.6 48.6 48.6

81.0 81.0 81.0 81.0 81.0 81.0

2501-9 2502 2602-1 2602-2 2602-3 2602-4

15.4

9.8

1.2 1.2 1.2 1.2

133.2 133.2 133.2 133.2

222.0 222.0 222.0 222.0

2602-5 2602-6 2602-7 2602-8 2602-9 2602-1

14.0

14.0

1.2 1.2 1.2 1.2 1.2 1.2

133.2 133.2 133.2 133.2 133.2 133.2

222.0 222.0 222.0 222.0 222.0 222.0

2.5 2.8

17.4 19.4

40.2 44.7

13.7 15.2

2602-11 2602-12 2602-13 2602-14 2700 2800

1.2 1.2 1.2

133.2 133.2 133.2 270.2

222.0 222.0 222.0 1,080.8

2900 3000 3100 3201 3202A-1 3202A-2

450.0

152.6

71.6

51.6 39.6 14.4 14.4

2.1 2.1

371.2 854.0 346.8 163.2 163.2

1,484.8 1,366.4 462.4 272.0 272.0

648.3

33.1

218.8

22.4

862.5

452.3

3202A-3 3202A-4 3202A-5 3202A-6 3202A-7 3202A-8

238.0 238.0 238.0 238.0

-

152.6 152.6

-

110.6 110.6 110.6 110.6

- 71.6 71.6

14.4 14.4 14.4 14.4 14.4 14.4

2.1 2.1 2.1 2.1 2.1

163.2 163.2 163.2

175.0

201.3

272.0 272.0 272.0

10.7

52.6

3202A-9 3202A-10 3202A-11 3202A-12 3202A-13 3202B-1

238.0 189.0

152.6 152.6 152.6

110.6 73.5

71.6 71.6 71.6

14.4 14.4 14.4 14.4 14.4 10.8

2.1 2.1 2.1 2.1 2.1 0.7

163.2 163.2 145.5

175.0

152.4

272.0 272.0 242.6

3202B-2 3202B-3 3202B-4 3202B-5 3202B-6 3202B-7

189.0

119.3 119.3 119.3 119.3

73.5

47.3 47.3 47.3 47.3

10.8 10.8 10.8 10.8 10.8 10.8

0.7 0.7 0.7 0.7

145.8 145.8 145.5 145.5 145.5

243.0 243.0 242.6 242.6 242.6

3202B-8 3202B-9 3203 3204 3205 3206

101.5 238.5

238.0

119.3

105.0

27.4 47.3

10.8 10.8 16.2

0.7 0.7

145.5 145.5 269.0 61.2

138.1

242.6 242.6 358.7 81.6

21.6

3207 3208 3209 3210 L.S. 1 L.S. 2

445.0 298.0 178.9

105.0

5.4

2.1

339.2 453.0

678.4 604.0

L.S. 3 L.S. 4 L.S. 5 L.S. 6 L.S. 7 L.S. 8

L.S. 9 L.S. 10 L.S. 11 L.S. 12 L.S. 13 L.S. 14

L.S. 15 L.S. 16 Gas tank Fence curbstone

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total JOINERY

1 AluminumWindows

m2 1,044.52

Curtain walls130 United Arab Aluminum m2 86.65

Shutter130 United Arab Aluminum m2 1.86

Door130 United Arab Aluminum m2 0.87

2 MetalWindows

5.1 pcs 430.00

130 United Arab Aluminum

453 Benayat

100 201 202 400 500 601

143.09 225.73 175.73 37.79 13.10 13.23

31.54 4.23 26.88 17.28

0.17

2.00

602 700 800 901-1 901-2 901-3

20.93 28.85 24.98 1.38 9.18 9.18

901-4 901-5 902 903-1 903-2 1001

9.18 9.82 11.23 9.82 10.98 1.94

3.00

1002 1100 1201-1 1201-2 1201-3 1201-4

0.53 0.38

13.00 60.00 60.00 60.00 60.00

1201-5 1201-6 1201-7 1201-8 1201-9 1201-10

1201-11 1201-12 1201-13 1201-14 1201-15 1201-16

36.00 24.00

1201-17 1201-18 1201-19 1201-20 1201-21 1201-22

1201-23 1201-24 1202 1204-1 1204-2 1204-3

1204-4 1301 1302 1400 1500 1601-1

1.60 15.84

0.48 0.48

34.00 50.00 12.00

1601-2 1601-3 1601-4 1601-5 1601-6 1602

1.76 15.84 1.76 15.84 1.76 1.06

1603 1701 1702 1900 2001 2002

0.64 2.56 12.96 12.96

4.61 1.15

0.76 0.34

11.00 5.00

2003 2004 2005 (1~3) 2006 2007-1 2007-2

13.20 12.96 1.78

2007-3 2007-4 2008-1 2008-2 2100 2201

2.37 4.03

0.15

2202 2301 2302 2400 2501-1 2501-2

2.64 3.62 0.54 1.42 0.93 0.93

0.87

2501-3 2501-4 2501-5 2501-6 2501-7 2501-8

0.93 0.93 0.93 0.93 0.93 0.93

2501-9 2502 2602-1 2602-2 2602-3 2602-4

0.93 2.08 2.08 2.08 2.08

2602-5 2602-6 2602-7 2602-8 2602-9 2602-10

2.08 2.08 2.08 2.08 2.08 2.08

2602-11 2602-12 2602-13 2602-14 2700 2800

2.08 2.08 2.08 2.08 9.46 20.40

0.14 0.30

2900 3000 3100 3201 3202A-1 3202A-2

29.52 24.82 38.64

3202A-3 3202A-4 3202A-5 3202A-6 3202A-7 3202A-8

3202A-9 3202A-10 3202A-11 3202A-12 3202A-13 3202B-1

3202B-2 3202B-3 3202B-4 3202B-5 3202B-6 3202B-7

3202B-8 3202B-9 3203 3204 3205 3206

3207 3208 3209 3210 L.S. 1 L.S. 2

L.S. 3 L.S. 4 L.S. 5 L.S. 6 L.S. 7 L.S. 8

L.S. 9 L.S. 10 L.S. 11 L.S. 12 L.S. 13 L.S. 14

L.S. 15 L.S. 16 Gas tank Fence curbstone ................

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total GREENHOUSE BUILDING

1 Design, Supply & Installation of Green HouseFooting

1 lot 3.00

Greenhouse structure2 148 USMS pcs 2.91

Cooling system3 148 USMS pcs 1.80

148 USMS

2005-1 2005-2 2005-3

1.00 1.00 1.00

0.97 0.97 0.97

0.60 0.60 0.60

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total EXTERIOR WORKS

1 Plants

2 Miscellaneous WorksDrainage gravel

Palms m2 227.30 Trees m2 1,037.00 grass, shrubs, GC m2 889.00

m2 2,153.30 Filter Membrane

363 USMSPalms m2 757.50 Trees m2 3,629.40 grass m2 664.00 shrubs, GC m2 1,114.00

Soil Mix363 USMSPalms m3 340.90 Trees m3 1,037.00 grass m3 33.20 shrubs, GC m3 55.70

Excavation & Hauling363 USMSPalms m3 386.30 Trees m3 1,244.40

Gravel Mulching363 USMSPalms m2 - Trees m2 -

3 Irrigation WorksSub-main pipeline incl necessary fittings

363 USMS75mm Lm 477.00 63mm Lm 1,939.50 50mm Lm - 32mm Lm 129.00

Lateral pipeline incl necessary fittings363 USMS40mm Lm 349.50 32mm Lm 1,739.50 25mm Lm 796.50 20mm Lm 1,407.50

363 USMS

Conduits pipeline incl necessary fittings363 USMS110mm Lm 663.00 90mm Lm 154.00 75mm Lm 55.00 63mm Lm 361.00 50mm Lm 1,140.00

Irrigation wire363 USMSAWG-14 Lm 5,326.00

PC 05

227.30 1,037.00 889.00

757.50 3,629.40 664.00 1,114.00

340.90 1,037.00 33.20 55.70

386.30 1,244.40

477.00 1,939.50

129.00

349.50 1,739.50 796.50 1,407.50

663.00 154.00 55.00 361.00 1,140.00

5,326.00

SAUDI BINLADEN GROUP - ABCDPAYMENT CERTIFICATE DEPARTMENT

Project CORRECTIONAL FACILITIES P-1182, DammamSubject AS-BUILT QUANTITIESPeriod As of 18 Feb 2016

NO DESCRIPTION Unit Total 1 EXTERIOR WORKS

Precast curbstone364 USMS (straight & curved) Lm 20,520 295 Dar anan (straight) Lm - 295 Dar anan (curved) Lm -

Broom finish B2364 USMS m2 2,948

Broom finish B5364 USMS m2 1,374

Interlock tiles, sandy color 6cm thick364 USMS m2 460

Interlock triple hexagonal tiles 8cm thick364 USMS m2 1,890

Concrete edger 20x10x8364 USMS Lm 155

Precast tiles 40x40x4 cm (cement tiles)364 USMS m2 1,921

20,520.00

2,948.00

1,374.00

460.00

1,890.00

155.00

1,921.00

Page 373 of 373

SAUDI BINLADIN GROUPProject CORRECTIONAL FACILITIES P1182, Dammam Subject SUBCONTRACTOR TO DATE PAYMENT Date As of 23 Feb 2016

Subcontractor PC Amount Remarks

123 Al Ameel PC09 10,328,033.40 130 United Arab Alum PC03 1,466,350.60 148 USMS PC03 841,861.77 160 Al Hazem PC04 290,997.89 191 Al Manhal PC01 61,880.00 214 Marim Jalani PC05 2,759,385.31 295 Dar Anan PC03 4,099,835.15 322 Cretec PC07 3,575,286.41 Final363 USMS PC05 855,488.91 364 USMS PC05 2,499,665.00 453 Benayat PC23 78,120,069.42 510 Kabbani PC11 2,629,417.25 526 Dar Anan PC03 1,990,555.39 550 Tawakl Modern PC04 1,580,987.18 553 Otaibi PC01 98,293.29 560 Al Monsrhri PC04 1,306,096.75 562 Awan Al Award PC05 777,539.39

Contract No.

Recommended