SUB:- RUNNING/COMPLETED CONTRACTS/AGREEMENTS OF NER/CONSTRUCTION
ORGANISATION. AS ON 30.09.09
. REF:- GM/Vigilance letter No. Z/13/SS/Tender information/Web – site Dt. 11.09.09.
Sl.
NO
.
Name of Project O.T. No. Name of work LOA & date CA No., date & CA
Value
Original
DOC
Actual/Ex
tended
DOC
Position
of final
bill
Tentative
date for
final bill
Reason
for delay
1 2 3 4 5 6 7 8 9 10 11
Dy. CE/Con/I/IZN
1 Bareilly - Lalkua CAO/Con/20/05 Constn of bridges/Major Br.
No. 1032 in BRY - IZN
W/Con/362/II/666/W-3
Dt. 25.01.06
CAO/Con/GKP/870
Dt. 21.02.06
Rs. 34648304.00
24.09.06 30.08.08 Work
completed
31.12.09
2 Bareilly - Lalkua CAO/Con/45/06 (2) Linking of BG railway track n
PSC sleepers etc. in Bareilly
Jn. _ Izatnagar Workshop
section.
W/Con/362/II/844/W-3
(2)
Dt. 04.12.06
CAO/Con/GKP/1064
Dt. 27.03.08
Rs. 6799613.26
03.05.07 30.06.09 Work
completed
30.09.09
3 Bareilly - Lalkua CAO/Con/45/07 (2) Construction of S&T
Building between Bareilly Jn.
(excluding) to Lalkua
(excluding) in connection
with Bareilly – Lalkua
section.
W/Con/362/II/905/W-3
(2)
Dt. 19.09.07
CAO/Con/GKP/1024
Dt. 07.01.08
Rs. 8255017.23
18.08.08 30.09.09 Work not
started
due to non
supply of
portion.
- Work in
progress
4 Bareilly - Lalkua CAO/Con/86/07 (4) Widening of rail joints
90R/52 Kg. New/SH rails
between BE-IZN section.
A/L No.
W/Con/362/II/940/W-3
(4)
Dt. 13.02.08
A/L No.
W/Con/362/II/940/W
-3 (4)
Dt. 13.02.08
Rs. 642000/-
12.08.08 - - - -
5 Bareilly - Lalkua CAO/Con/92/07 (2) Rebuilding of Minor bridges,
earthwork, blanketing etc.
between IZN - BPR
W/Con/362/II/941/W-3
(2)
Dt. 02.04.08
CAO/Con/GKP/1086
Dt. 01.08.08
Rs. 58262162/-
01.03.09 31.07.09 - - Work in
progress
6 Bareilly - Lalkua CAO/Con/30/08 (2) Supply of ballast from LKU
Quarry and loading thereof.
W/Con/362/II/760/W-3
(2)
Dt. 30.07.08
Dy.
CE/Con/I/IZN/02
Dt. 02.10.08
Rs. 47430000/-
29.04.09 31.12.09 - - Work in
progress
7 Bareilly - Lalkua CAO/Con/43/08 (2) Construction of high level
passenger platform, rake
handling platform, approach
road, platform benches etc.
and BC, IZN & DOX station
including earthwork in filling
from private land in platform,
approach road, good shed etc.
surfacing provision of CC
paver etc. in connection with
gauge conversion of BRY-
LKU Section from MG into
BG (Phase –I).
W/Con/362/II/972/W-3
(2)
Dt. 02.09.08
CAO/Con/GKP/1115
Dt. 27.10.08
Rs. 29087909.18
01.04.09 31.12.09 - - Work in
progress
8 Bareilly - Lalkua CAO/Con/35/08 (3) Transportation of Rails, PSC
Sleepers, P Way materials
etc. between Bareilly –
Lalkua and Bareilly –
Kasganj section in connection
with gauge conversion of
Bareilly – Lalkua – Kasganj
section.
W/Con/362/II/765/W-3
(3)
Dt. 18.08.08
CAO/Con/GKP/1117
Dt. 12.11.08
Rs. 22222101.50
17.08.10 - - - Work in
progress
9 Bareilly - Lalkua CAO/Con/28/08 (5) Rebuilding of Major bridge
No.11,13,18,20,24,47,50,
(3x6.1m Girder) on same
alignment/temporary
diversion with pile foundation
and PSC Slab/RCC Box
including earthwork in
temporary diversion between
Izatnagar – Lalkua section in
connection with Gauge
conversion of Bareilly –
Lalkua section.
W/Con/362/II/902/W-3
(5)
Dt. 11.09.08
Dy.
CE/Con/I/IZN/12
Dt. 29.03.09
Rs. 7,11,72,543/-
10.03.10 - - - Work in
progress
10 Bareilly - Lalkua CAO/Con/11/08 (3) Rebuilding of balance minor
bridges between Bhojipura –
Lalkua (12 Nos.) and
provision of hectometer post
between Bhojipura – lalkua
and left over widening of
formation in lalkua –
Bhojipura between Km. 0/0 –
Km 16/0 (length = 12 Km) in
connection with gauge
conversion of Bareilly –
Lalkua section.
W/Con/362/II/951/W-3
(3)
Dt. 24.06.08
Dy.
CE/Con/I/IZN/03
Dt. 19.12.08
Rs. 18156407/-
23.01.10 31.12.09 - - Work in
progress
11 Bareilly - Lalkua CAO/Con/43/08 (3) Manufacturing, supply and
stacking of 65mm size
machine crushed track ballast
as per RDSO's specification
of June/2004 with up to date
correction slips along the side
of track between Baheri to
Izatnagar in connection with
gauge conversion of Izatnagar
- Lalkua section.
W/Con/362/II/972/W-3
(3)
Dt. 18.08.08
Dy.
CE/Con/I/IZN/04
Dt. 27.12.08
Rs. 31860000/-
17.05.09 31.12.09 - - Work in
progress
12 Bareilly - Lalkua CAO/Con/43/08 (4) Manufacturing, supply and
stacking of 65mm size
machine crushed track ballast
as per RDSO's specification
of June/2004 with up to date
correction slips along the side
of track between Lalkua to
Baheri in connection with
gauge conversion of Izatnagar
- Lalkua section.
W/Con/362/II/972/W-3
(4)
Dt. 23.09.08
Dy.
CE/Con/I/IZN/09
Dt. 07.03.09
Rs. 16417400/-
22.03.09 31.12.09 - - Work in
progress
13 Bareilly - Lalkua CAO/Con/43/08 (1) Construction of high level
passenger platform, rake
handling platform, approach
road, platform benches etc. at
Baheri, Kichha & Richha
W/Con/362/II/972/W-3
(1)
Dt. 07.11.08
Dy.
CE/Con/I/IZN/06
Dt. 31.01.09
Rs. 21603611.02
06.07.09 31.03.10 - - Work in
progress
Road station including
earthwork in filling from
private land in platform,
approach road, goodsshed etc,
surfacing. provision of CC
Paver etc. in connection with
gauge conversion of Bareilly
Jn. - Lalkua Jn. Section from
MG into BG (Phase - I).
14 Bareilly - Lalkua CAO/Con/61/08 (1) Rebuilding of Major Bridge
No.2 (3x12.20m Girder),
Bridge No. 23 (3x12.2m
Girder), Bridge No.39
(1x12.2m Girder) & Bridge
No.45A (1x12.2m Girder), on
well & pile foundation on
PSC Girder and deck slab on
permanent diversion
between Bhojipura-Lalkua in
connection with Gauge
Conversion of Bareilly-
Lalkua section.
W/Con/362/II/987/W-3
(1)
Dt. 13.01.09
CAO/Con/GKP/1132
Dt. 09.06.09
Rs. 102503235/-
11.12.09 - - - Work in
progress
15 Bareilly - Lalkua CAO/Con/76/08 (5) Construction of high
level/medium level passenger
platforms/island platforms,
rake handling platform,
approach road, platform
benches, earthwork for dead
end/sand humps, in
approaches of yards/in
formation in yard etc. at
Lalkua, Pantnagar &
Dewrania stations including
earthwork in approach road,
goodshed etc and surfacing of
platform and other
miscellaneous civil works in
connection with gauge
conversion of Bareilly -
Lalkua Section on these
stations/yards.
W/Con/362/II/1001/W-
3 (5)
Dt. 19.02.09
Dy.
CE/Con/I/IZN/16
Dt. 06.04.09
Rs. 22777853.56
18.12.09 - - - Work in
progress
16 Bareilly - Lalkua CAO/Con/92/08 (3) Hiring of Road vehicle (Tata
Sumo/Jeep, Bolero, Marshall
or similar) for supervision of
ongoing works under
AXEN/Con/Pilibhit and
AXEN/Con/Kasganj
W/Con/362/II/1017/W-
3
Dt. 16.03.09
W/Con/362/II/1017/
W-3
Dt. 16.03.09
Rs. 862436/-
15.01.11 - - - Work in
progress
17 Bareilly - Lalkua Dy. CE/Con/IZN/
2008-09
Preparation/Scanning and
Degitation of drawing
through Auto CAD for yard
plans, building, bridges, LWR
& gradient plants etc.
W/Con/247/IZN/II/Quot
ation/2008-09/01
dt. 16.03.09
Dy.
CE/Con/I/IZNI/01/
2008-09 dt. 16.09.08
Rs. 195730/-
15.01.09 15.07.09 - - Work in
progress
18 Bareilly - Lalkua CAO/Con/16/09 (2) Construction of high
level/medium level/rail level
passenger platforms/island
platforms, approach road,
platform benches, earthwork
W/Con/247/IZN/2/W-1
Dt. 24/29.06.09
W/Con/247/IZN/2/W
-1
Dt. 24/29.06.09
Rs. 12700750/-
28.05.10 - - - Work in
progress
for dead end/sand humps, in
approaches of yards/in
formation in yard etc. at
Bhojipura & Atamanda
stations including earthwork
in approach road and
surfacing of platform and
other miscellaneous civil
works in connection with
gauge conversion of Bareilly
- Lalkua Section on these
stations/yards.
19 Bareilly - Lalkua CAO/Con/16/09 (1) Supplying and Laying of
blanketing material on
permanent diversions of
major bridges no 11,13,18,20
,23,47 and 50 and other left
over miscell civil works
between Izatagar-Lalkuan
section in connection with
gauge conversion Bareilly-
Lalkuan section.
W/Con/247/IZN/1/W-
1/1
Dt. 18.06.09
W/Con/247/IZN/1/W
-1/1
Dt. 18.06.09
Rs. 28133721.59
17.12.09 - - - Work in
progress
20 Bareilly - Lalkua CAO/Con/45/06 (1) Repair & maintenance of
quarters & offices camp
office & constn. Of record
room PWI/IOW office at
Izatnagar.
W/Con/362/II/844/W-3
(1)
Dt. 04.12.06
CAO/Con/GKP/965
Dt. 15.03.07
Rs. 2543682.34
03.06.07 31.03.08 Work
completed
- -
21 FBD - KSJ CAO/Con/06/06 (1) Rebuilding of balance minor
bridges bet. FBD - KSJ
W/Con/362/II/870/W-3
(1)
Dt. 15.06.06
CAO/Con/GKP/914
Dt. 28.08.08
Rs. 41787517.13
14.03.07 31.10.07 Work
completed
- -
22 FBD - KSJ CAO/Con/66/07 (3) Execution of balance works
of passenger platform for
high level etc. bet. KSJ
(Excl.) – DRO (Incl.)
W/Con/362/II/865/W-3
(3)
Dt. 05.02.09
CAO/Con/GKP/955
Dt. 28.02.07
Rs. 11721091.85
04.06.07 30.10.07 - - Vitiation is
under vetting
23 FBD - KSJ CAO/Con/06/06 (2) Transportation of 52 Kg.
New/SH rails, 90 lbs rails
PSC Sleepers etc.
W/Con/362/II/807/W-3
(2)
Dt. 06.06.06
CAO/Con/GKP/903
Dt. 14.07.06
Rs. 20094835.08
05.02.07 31.07.07 Work
completed
30.09.09 -
24 FBD – KSJ CAO/Con/33/06 (4) Level Crossing between KSJ
- DRO
W/Con/362/II/836/W-3
(4)
Dt. 28.09.06
CAO/Con/GKP/973
Dt. 28.03.07
Rs. 4822714.60
27.04.07 28.02.08 Work
completed
- -
25 FBD – KSJ CAO/Con/06/06 (3) Const. of 1 no. 600 mm long
washing pit etc. at Kasganj
W/Con/362/II/807/W-
3(3)
Dt. 03.06.06
CAO/Con/GKP/919
Dt. 06.09.06
Rs. 34632109.24
12.03.07 30.06.08 Work
completed
- -
26 FBD – KSJ CAO/Con/35/06 (1) Supplying, stacking and
spreading of blanketing
materials on top at new
embankment on approaches
of Bridge No. 254 bet. BHK-
SWRT stations.
W/Con/362/II/838/W-
3(1)
Dt. 13.11.06
CAO/Con/GKP/974
Dt. 29.03.07
Rs. 5701400/-
12.03.06 30.06.07 Work
completed
- -
27 FBD – KSJ CAO/Con/66/06 (4) Const. of Signal building,
camp office etc. at Kasganj.
W/Con/362/II/865/W-
3(4)
Dt. 26.02.07
CAO/Con/GKP/968
Dt. 22.03.07
Rs. 7717244.30
25.08.07 30.06.08 Work
completed
15.10.09 -
28 FBD – KSJ CAO/Con/46/06 (1) Linking of BG railway track
on PSC sleepers etc. in Zone
–I of FBD – KSJ section.
W/Con/362/II/845/W-
3(1)
Dt. 29.10.07
CAO/Con/GKP/957
Dt. 28.02.07
Rs. 9151676.81
28.06.07 31.03.08 Work
completed
15.10.09 -
29 FBD – KSJ CAO/Con/46/06 (2) Linking of BG railway track
on PSC sleepers etc. in Zone
–II of FBD – KSJ section.
W/Con/362/II/845/W-
3(2)
Dt. 29.01.07
CAO/Con/GKP/958
Dt. 28.02.07
Rs. 11320486.64
24.06.07 31.03.08 Work
completed
31.10.09 -
30 FBD – KSJ CAO/Con/46/06 (3) Linking of BG railway track
on PSC sleepers etc. in Zone
–III of FBD – KSJ section.
W/Con/362/II/845/W-
3(3)
Dt. 29.10.07
CAO/Con/GKP/959
Dt. 28.02.07
Rs. 10458938.56
30.06.07 31.03.08 Work
completed
15.09.09 -
31 FBD – KSJ CAO/Con/46/06 (4) Linking of BG railway track
on PSC sleepers etc. in Zone
–IV of FBD – KSJ section.
W/Con/362/II/844/W-
3(4)
Dt. 02.02.07
CAO/Con/GKP/967
Dt. 22.03.07
Rs. 7834077.56
28.06.07 31.03.08 Work
completed
30.09.09 -
32 FBD – KSJ CAO/Con/46/06 (5) Linking of BG railway track
on PSC sleepers etc. in Zone
–V of FBD – KSJ section.
W/Con/362/II/845/W-
3(5)
Dt. 29.01.07
CAO/Con/GKP/978
Dt. 20.04.07
Rs. 10937361.56
28.06.07 31.03.08 Work
completed
- -
33 FBD - KSJ CAO/Con/60/07 (1) Construction of high level
passenger platform at Kampil
road station and surfacing of
rake handling facilities 15m
width at Farrukhabad
including drain in yards in
connection with gauge
conversion of Farrukhabad –
Kasganj section.
W/Con/362/II/926/W-
3(1)
Dt. 16.10.07
CAO/Con/GKP/1017
Dt. 10.12.07
Rs. 10315285.9
15.04.08 31.03.09 Work
completed
10.11.09 -
34 SZP-PBE-TPU CAO/Con/49/05 Provision of Hectometer post
and Cable huts in SZP-PBE-
TPU section.
W/Con/362/II/796/W-3
Dt. 13.02.06
CAO/Con/GKP/925
Dt. 30.10.06
Rs. 2622086.96
12.11.06 31.10.07 Work
completed
31.12.09 -
35 Mechanical
Workshop, Izatnagar
CAO/Con/81/08 (1) Construction of foundation,
supplying & erection of
sheeting, dismantling of
existing floor including
disposal of debris,
construction/renovation of
flooring including linking of
track, construction of service
buildings & other
miscellaneous works in
connection of
extension/renovation of Bogie
overhauling section (Bay-2),
extension of open gantry in
Bay-2 & 3 (G-2 & G-3),
extension/renovation of
carriage wheel shop (3E),
extension/renovation of
corrosion shop, BG coach
lifting and lowering corrosion
shop (4E, 4E1 & 4E2) for
developing 50 BG Coaches
POH at Mechanical
Workshop, Izatnagar. (Zone -
I).
W/Con/362/II/1006/W-
3(1)
Dt. 23.02.09
Dy CE/Con/I/IZN/13
Dt. 06.04.09
Rs. 64349938.92
22.02.11 - - - Work in
progress
36 Mechanical
Workshop, Izatnagar
CAO/Con/81/08 (3) Construction of foundation,
supplying and erection of
sheeting, dismantling of
existing floor including
disposal of debris,
construction/renovation of
flooring in shed no. 28 & 29
W/Con/362/II/1006/W-
3(3)
Dt. 23.02.09
Dy CE/Con/I/IZN/14
Dt. 06.04.09
Rs. 64673872.75
22.02.11 - - - Work in
progress
including linking of track,
construction of service
buildings related to BTC,
Centralized Library,
supervisors room, meeting
hall, laboratory (1,2 &3)
including septic tanks,
70,000 Gallons capacity static
tank including pump house,
culvert and Gas godown and
construction/renovation/exten
sion of SSE offices, cycle
stand in connection of
developing 50 BG Coaches
POH at Mechanical
Workshop, Izatnagar. (Zone -
III).
37 Mechanical
Workshop, Izatnagar
CAO/Con/81/08 (2) Construction of foundation,
supplying & erection of
sheeting, dismantling of
existing floor including
disposal of debris,
construction/renovation of
flooring including linking of
track in General shed (SE-10,
shed no. 21, 21/A, 26 & 27
and repair of sheeting in shed
no. 18A, repair/renovation of
floors & roofs and other
works in shed SPR-20,
construction/widening of CC
roads and
construction/renovation of
existing drain in connection
of developing 50 BG Coaches
POH at Mechanical
Workshop, Izatnagar. (Zone -
II).
W/Con/362/II/1006/W-
3(2)
Dt. 28.04.09
W/Con/362/II/1006/
W-3(2)
Dt. 28.04.09
Rs. 60283758.58
27.04.11 - - - Work in
progress
38 PBR-PBE-TPU CAO/Con/50/08 (2) Construction of S&T
Buildings between Bhojipura
(excl.) to Tanakpur (incl.),
Camp Office at Pilibhit and
extension of Dy. Chief
Engineer/Con/I/Izatnagar's
office and construction of
Two units VIP Officer's Rest
House and one unit Camp
Office at Izatnagar.
W/Con/362/II/980/W-
3(2)
Dt. 08.11.08
Dy CE/Con/I/IZN/05
Dt. 30.12.08
Rs. 11341483.54
07.10.09 0 - - Work in
progress
39 PBR-PBE-TPU CAO/Con/50/08 (1) Rebuilding of substructure of
Major Bridge No.27, Bridge
No. 34A, Bridge No.53, Br.
No. 57B & Br. No. 65 PSC
Girder on well foundation on
permanent
diversion/temporary diversion
including earthwork on
permanent
diversion/temporary diversion
W/Con/362/II/980/W-
3(1)
Dt. 09.02.09
W/Con/362/II/980/W
-3(1)
Dt. 09.02.09
Rs. 162082639/-
08.08.10 - - - Work in
progress
and supplying and laying of
Blanketing material on the
permanent diversion of these
bridges, between Pilibhit -
Tanakpur stations in
connection with Gauge
Conversion of Bhojipura -
Pilibhit-Tanakpur section.
40 PBR-PBE-TPU CAO/Con/73/08 (4) Construction/Rebuilding of
minor bridges (Br. No. 319 to
299 i.e. total 20 Nos. to be
rebuilt) including earthwork
in filling in widening of
formation, temporary
diversion and other
miscellaneous civil works
between Bhojipura-Saithal
from Km. 286/10 to 300/2-3
in connection with gauge
conversion Bhojipura-
Pilibhit-Tanakpur section.
W/Con/362/II/998/W-
3(4)
Dt. 28.02.09
W/Con/362/II/998/W
-3(4)
Dt. 28.02.09
Rs. 20976288.5
27.02.11 - - - Work in
progress
41 PBR-PBE-TPU CAO/Con/73/08 (2) Construction/Rebuilding of
minor bridges (Br. No. 52 to
75 i.e. total 21 Nos. to be
rebuilt) including earthwork
in filling in widening of
formation, temporary
diversion and other
miscellaneous civil works
between Khatima (excl) -
Tanakpur in connection with
gauge conversion Bhojipura-
Pilibhit-Tanakpur section.
W/Con/362/II/998/W-
3(2)
Dt. 15.05.09
W/Con/362/II/998/W
-3(2)
Dt. 15.05.09
Rs. 41765085/-
14..05.11 - - - Work in
progress
42 PBR-PBE-TPU CAO/Con/92/08 (1) Construction/Rebuilding of
minor bridges (Br. No. 1 to
51 i.e. total 42 Nos. to be
rebuilt) including earthwork
in filling in widening of
formation, temporary
diversion and other
miscellaneous civil works
between Pilibhit –Khatima
(incl.) in connection with
gauge conversion Bhojipura-
Pilibhit -Tanakpur section.
Dy. CE/Con/I/IZN/18
Dt. 11.08.09
Dy.
CE/Con/I/IZN/18
Dt. 11.08.09
Rs. 38279443.5
14.05.11 - Work
completed
- Work in
progress
Dy. CE/Con/East
43 Chhapra - Ekma
doubling
CAO/CON/44/2007 Construction of drainage in
Chhapra Yard in connection
with Chhapra – Ekma
doubling
W/Con/362/II/905/W-3
dated 16.10.2007
CAO/Con/GKP/1114
dated: 23.10.2008
Rs. 1636080.00
15.02.08 31.07.08 - - Work is in
progress
44 Ekma - Jiradei
doubling
CAO/CON/26/2005
(2)
Earthwork and Blanketing in
formation, construction of
minor bridges & other misc.
works such as signal building,
platform, FOB, OFC Hut,
fencing etc. between
Chainwa(ex.) –
W/Con/362/II/674/W-3
(2) dated 24.06.2006
CAO/Con/GKP/917
dated: 05.09.2006
Rs. 40769041.50
23.10.07 31.01.08 Under
preparatio
n
31.10.09 Due to
engagement
in doubling
work.
Dhuraundha(in.) section in
connection with doubling of
Ekma - Jiradei section of
Varanasi Division
45 CAO/CON/26/2005
(5)
Earthwork and Blanketing in
formation, construction of
minor bridges & other misc.
works such as signal building,
platform, FOB, OFC Hut,
fencing etc. between
Siwan(ex.) – Jiradei(in.)
section in connection with
doubling of Ekma - Jiradei
section of Varanasi Division.
W/Con/362/II/674/W-3
(5) dated 06.03.2006
CAO/Con/GKP/915
dated: 29.08.2006
Rs. 41809049.00
05.11.07 30.06.09 - - Final bill
will be
prepared
after CRS
46 CAO/CON/30/2006
(2)
Earthwork and Blanketing in
formation, construction of
minor bridges & other misc.
works such as signal building,
platform, FOB etc. between
Ekma (excluding) – Chainwa
(including) and Duraundha
(excluding) - Siwan
(including) section in
connection with doubling of
Ekma - Jiradei section of
Varanasi Division.
W/Con/362/II/883/W-3
(2) dated 21.09.2006
CAO/Con/GKP/940
dated 27.11.2006
Rs. 82256431.00
20.03.08 28.02.09 - 30.11.09 Final bill
will be
prepared
after CRS
47 CAO/CON/69/2007
(3)
Supplying, laying and fixing
of heavy duty hexagonal
paver blocks on level
crossings, CC pavers on
passenger platforms & other
misc. works between Chhapra
(in.) - Jiradei(in.) section in
connection with Chhapra -
Ekma - Jiradei doubling work
W/Con/362/II/926/W-3
(3) dated 25.01.2008
CAO/Con/GKP/1077
dated: 24.04.2008
Rs. 9615936.00
24.04.08 30.07.08 - - Final bill
will be
prepared
after CRS
48 CAO/CON/04/2007
(1)
Linking of BG track manually
including slewing &
dismantling B.G. track
wherever required, carting
and stacking of released
materials, spreading of
ballast, transportation of 52
Kg/90R SH/New Rails, PSC
sleepers, 60 Kg from sleeper
factory or any other Railway
stations, P.Way materials etc.
from different places to
various stations/places and
linking level crossing, bridge
etc. between Ekma (excl.) -
Pachrukhi (incl.) in
connection with Ekma -
Jiradei patch doubling
project.
W/Con/362/II/873/W-3
(1) dated 17.05.2007
CAO/Con/GKP/991
dated 06.08.2007
Rs. 22512743.50
16.01.08 30.06.09 Under
preparatio
n
31.10.09 Due to
engagement
in doubling
work.
49 CAO/CON/04/2007
(1)
Linking of BG track manually
including slewing &
dismantling B.G. track
wherever required, carting
W/Con/362/II/873/W-3
(2) dated 15.06.2007
CAO/Con/GKP/1069
dated 31.03.2009
Rs. 18183662.50
14.02.08 30.09.09 - - Work is in
progress
and stacking of released
materials, spreading of
ballast, transportation of 52
Kg/90R SH/New Rails, PSC
sleepers, 60 Kg from sleeper
factory or any other Railway
stations, P.Way materials etc.
from different places to
various stations/places and
linking level crossing, bridge
etc. between Pachrukhi
(excl.) - Jiradei (incl.) in
connection with Ekma -
Jiradei patch doubling
project.
50 CAO/CON/84/2008
(3)
Casting of deck slab on Major
Bridge No. 103 (6x18.30m)
at Km. 395/5-6 between
Siwan - Jiradei section in
connection with Ekma -
Jiradei doubling work.
W/Con/362/II/995/W-3
(3) dated 19.01.2009
Dy.CE/Con/GKP/Eas
t/06 dated 20.04.2009
Rs. 3521550.00
18.03.09 18.03.09 - - Final will be
done after
CRS
51 CAO/CON/18/2009
(3)
Alumino Thermit Welding of
52kg./90R rails by SKV
Process at cess/in stack in
connection with Ekma -
Jiradei doubling and
construction of Chhapra
Gramin new station and
various projects running in
the jurisdiction of Dy.Chief
Engineer/Con/East /GKP.
W/Con/362/II/994/W-3
(2)
Dated 22.05.2009
Dy.CE/Con/GKP/Eas
t/09 dated 10.09.2009
Rs. 4611000.00
21.11.09 21.11.09 - - Work is in
progress
52 CAO/CON/52/2008 Earthwork and blanketing in
formation, construction of
minor bridges and other misc.
works between Maharajganj
to Basantpur (excluding) at
chainage 19.500 in
connection with Mahrajganj-
Mashrakh new BG line
project.
W/Con/362/II/982/W-3
(3) dated 06.11.2008
CAO/Con/GKP/1129
dated: 27.03.2009
Rs.18173525.00
05.02.10 05.02.10 - - Work is in
progress
53 CAO/CON/63/2008
(1)
Earthwork and blanketing in
formation, construction of
minor bridges and other misc.
works between Basantpur
(including) to Mashrakh
(including) in connection with
Mahrajganj-Mashrakh new
BG line project.
W/Con/362/II/990/W-3
(1) dated 10.02.2009
CAO/Con/GKP/1131
dated 02.06.2009
Rs. 176101500.00
09.05.10 09.05.10 - - Work is in
progress
54
Maharajganj -
Masrakh new BG
Line
CAO/CON/68/2008
(1)
Carrying out soil
investigation for construction
of major bridges, minor
bridges, platform wall and
embankments in Thawe -
Chhapra & Maharajganj -
Mashrakh in connection with
gauge conversion of Chhapra-
Siwan-Thawe -Kaptanganj
section & construction of new
W/Con/362/II/994/W-3
(1) dated 19.12.2008
Dy.CE/Con/East/GK
P/ 04 dated
07.03.2009
Rs. 553950.00
18.06.09 - - - Work is in
progress
BG line from Maharajganj -
Mashrakh.
55 CAO/CON/33/2008
(1)
Manufacturing, carting &
fixing of RCC Boundary
Pillar as per CE’s (MET) plan
No. M/59/62 with
contractor’s tool, labour,
material, reinforcement,
cement, complete. As per
specified intervals or as
directed by Engineer-in-
charge in connection with
Mahrajganj-Masrakh new BG
line.
W/Con/362/II/936/W-3
(4) dated 07.08.2008
Not done
Rs. 603488.00
06.11.08 Extension
upto
31.10.09
is under
process.
- - Work is in
progress
56 CAO/CON/06/2009
(1)
Construction of major bridges
on well/open foundation etc.
with other misc. works
between Maharajganj -
Mashrakh section in
connection with Maharajganj-
Mashrakh new BG line
project.
W/Con/362/II/1023/W-
3 (1)
Dated 02.06.2009
Not done
Rs.113742975.39
01.09.10 - - - Work yet to
be started.
57 CAO/CON/19/2009
(1)
Supply of two nos. Road
Vehicle at Chhapra/Siwan for
the use of the officers of
Dy.Chief
Engineer/Con/East/GKP's at
Chhapra/Siwan unit of
N.E.Railway.
W/247/BG/W – Hiring
Dated 09.07.2009
Not done
Rs.661481.76
08.07.10 - - - Work is in
progress
58 CAO/CON/31/2006 Supplying, leading and
loading of machine crushed
track ballast confiroming to
RDSO's specification of
June/2004 with upto date
correction slips from Pakur
Quarry into any type of
Railway wagon.
W/Con/362/II/834/W-3
dated 16.11.2006
CAO/Con/GKP/949
dated 29.01.2007
Rs.19600000.00
15.05.07 31.12.07 - - Case fill has
been seized
by Railway
Board
Vigilance
59 CAO/CON/44/2007 Supplying, leading and
loading of machine crushed
track ballast confiroming to
RDSO's specification of
June/2004 with upto date
correction slips from Pakur
Quarry into any type of
Railway wagon.
W/Con/362/II/834/W-3
dated 16.11.2006
CAO/Con/GKP/908
dated 28.07.2006
Rs. 17600000.00
15.05.07 31.12.07 - - Case fill has
been seized
by Railway
Board
Vigilance
60 CAO/CON/29/2007 Supplying, leading and
loading of machine crushed
track ballast confiroming to
RDSO's specification of
June/2004 with upto date
correction slips from Pakur
Quarry into any type of
Railway wagon.
W/Con/362/II/943/W-3
(2) dated 28.07.2008
CAO/Con/GKP/1103
dated: 29.08.2008
Rs. 46500000.00
27.09.09 15.11.09 - - Work is in
progress
61
Ballast supply from
Pakur Quarry
CAO/CON/29/2007 Supplying, leading and
loading of machine crushed
W/Con/362/II/943/W-3
(1) dated 28.07.2008
CAO/Con/GKP/1109
dated: 01.10.2008
27.09.09 27.11.09 - - Work is in
progress
track ballast confiroming to
RDSO's specification of
June/2004 with upto date
correction slips from Pakur
Quarry into any type of
Railway wagon.
Rs. 46500000.00
62 CAO/CON/53/2008 Supplying, leading and
loading of machine crushed
track ballast confirming to
RDSO's specification of
June/2004 with upto date
correction slips from Pakur
Quarry into any type of
Railway wagon
W/Con/362/II/976/W-3
(3) dated 06.10.2008
Dy.CE/Con/East/GK
P/01 Dated:
31.12.2008
Rs. 46800000.00
05.08.09 31.12.09 - - Work is in
progress
63 CAO/CON/35/2008
(1)
Supplying, leading and
loading of quarry dust to be
used as blanketing material
on Railway embankment
from Pakur Quarry into any
type of Railway wagons.
W/Con/362/II/965/W-3
(1) dated 17/19.12.2008
Dy.CE/Con/East/GK
P/03 Dated:
19.02.2009
Rs. 3460000.00
16.04.09 15.06.09 - - Work is in
progress
64 CAO/CON/97/2008
(1)
Supplying, leading and
loading of quarry dust to be
used as blanketing material
on Railway embankment
from Pakur Quarry into any
type of Railway wagons.
W/Con/247/East/Tender
/Quarry Dust (2)
dated 30.03.2009
Dy.CE/Con/East/GK
P/07 Dated:
05.06.2009
Rs. 1809926.00
29.09.09 - - - Work is in
progress
65 CAO/CON/97/2008
(1)
Supplying, leading and
loading of quarry dust to be
used as blanketing material
on Railway embankment
from Pakur Quarry into any
type of Railway wagons.
W/Con/247/East/Tender
/Quarry Dust (12)
dated 30.03.2009
Dy.CE/Con/East/GK
P/08 Dated:
15.06.2009
Rs. 1809926.00
29.09.09 - - - Work is in
progress
66 CAO/CON/22/2009
(1)
Supplying, leading and
loading of quarry dust to be
used as blanketing material
on Railway embankment
from Pakur Quarry into any
type of Railway wagons.
W/Con/247/Dy.CE/East
/Tender/03 (1)
Dated 22.07.2009
Not done
Rs. 1810000.00
21.01.10 - - - Work yet to
be started.
67
Dust supply from
Pakur
CAO/CON/22/2009
(1)
Supplying, leading and
loading of quarry dust to be
used as blanketing material
on Railway embankment
from Pakur Quarry into any
type of Railway wagons.
W/Con/247/Dy.CE/East
/Tender/03 (2)
Dated 22.07.2009
Not done
Rs. 1810000.00
21.01.10 - - - Work yet to
be started.
68 CAO/CON/55/2005 Construction of platform,
minor bridge, linking of track
& other misc works between
Chhapra Jn. (in.) and Chhapra
Kachery(in.) section and upto
TP 323/3 in connection with
doubling of Chhapra -
Hajipur section.
W/Con/362/II/800/W-3
dated 29.06.2006
CAO/Con/GKP/888
dated: 01.05.2006
Rs. 4545777.50
28.06.06 31.07.07 Under
preparatio
n
31.10.09
69
Chhapra - Hajipur
doubling (E. C.
Railway Project)
CAO/CON/16/2007
(1)
Construction of station
building & platform and
W/Con/362/II/882/W-3
(1) dated 19.06.2007
CAO/Con/GKP/1009
dated: 20.11.2007
18.11.07 30.04.09 - - Earthwork
being done
misc.works between Chhapra
Kachery - Goldenganj in
connection with construction
of New Chhapra Gramin
Railway station.at Chhapra
Gramin and other misc. works
in connection with doubling
of Chhapra - Hajipur project.
Rs. 32241845.00 by E. C.
Railway.
70 CAO/CON/68/2008
(5)
Manufacture & erection of
105x15 steel covered shed
including construction of
foundation, examination pit,
flooring, circulating area,
drain and other misc. works at
Chhapra yard in connection
with gauge conversion of CPJ
- THE - SV - CPR section.
W/Con/362/II/994/W-3
(5) dated 06.01.2009
Dy.CE/Con/East/GK
P/05 Dated:
19.02.2009
Rs. 23451361.68
05.07.09 Extension
upto
31.10.09
is under
process.
- - Work is in
progress
71
Chhapra - Thawe
gauge conversion
CAO/CON/22/2009
(3)
Transportation of PSC
Turnouts, switches, rails and
other P. Way materials etc.
from different places to
various stations/places
between Chhapra - Thawe
section in connection with
Kaptanganj - Thawe - siwan -
Chhapra gauge conversion
project
W/Con/247/Dy.CE/East
/Tender/02
Dated 22.07.2009
Not done
Rs. 3085755/-
21.01.10 - - - Work yet to
be started.
Dy CE/Con/West
72 GKP-GD (loop) &
ANDN-NTV G.C.
Project
L.T.No.
CAO/Con/23/06 (1)
Provision of Hectometer Post
in GKP-ANDN-NTV section
and loading of ballast into all
type of railway Wagons
W/Con/362/II/824/W-
3(1) dt.30.08.06
CAO/Con/GKP/943
dt.22.12.06
Rs. 2199060.36
29.1.07 31.12.08 Final bil
entered in
MB. Final
variation
under pre
paration.
31.10.09
73 CAO/Con/56/06 (5) Transportation of PSC line
sleepers from sleeper
factory/station yards to
various locations etc. in
connection with gauge
conversion of Gorakhpur-
Anandnagar-Nautanwa
section.
W/Con/362/II/855/W-
3(5) dt. 01.02.07
CAO/Con/GKP/962
dt.15.3.07
Rs. 22211384.95
30.4.07 30.04.09 Final bill
is being
entered in
MB.
10.11.09
74 CAO/Con/56/06 (4) Transportation of PSC line
sleepers from sleeper factory/
station yards to various
locations in connection with
gauge conversion of GKP-
ANDN-NTV section.
W/Con/362/Ii/855/W-
3(4) dt.01.02.07
CAO/Con/GKP/963
dt.15.3.07
Rs. 23706598/-
30.4.07 30.08.09 Extension
under
process,
work in
progress
75 CAO/Con/56/06 (1 ) Linking of BG track manually
between GKP(in)-
Peppeganj(in)
W/Con/362/11/855/W-
3(1)/2173 dt.26.06.07
CAO/Con/GKP/1061
dt.26.03.08
Rs. 15376380/-
25.10.07 31.10.09 Work in
progress
76 CAO/Con/56/06 (2) Linking of BG track manually
betweeen Peppeganj(ex)-
Purandarpur.
W/Con/362/II/855/W-
3(2) /2431 dt.20.07.07.
CAO/Con/GKP/1079
dt.30.4.08
Rs. 14730575/-
19.11.07 30.09.09 Extension
under
process,
work in
progress
77 CAO/Con/56/06 (3) Linking of BG track manually
betweeen Purandarpur-
Nautanwa.
W/Con362/II/855/W-
3(3) dt. 12.07.07
CAO/Con/GKP/1044
dt.26.2.08
Rs. 14583575/-
11.11.07 31.10.09 Work in
progress
78 L.T.No.
CAO/Con/43/07 (4)
Construction & extension of
P.F. bet. GKP(ex)-MIM(in)
W/Con/362/II/904/W-
3(4)/2976 dt.119.07
CAO/Con/GKP/1026
dt.11.01.08
Rs. 4030950/-
10.01.08 31.07.09 Extension
under
process,
work in
progress
79 LTNo.
CAO/Con/43/07 (3)
Construction & extension of
P.F.- bet. MIM(ex)-
Peppeganj(in)
W/Con/362/Ii/904/W-
3(3)2973 dt. 11.09.07
CAO/Con/GKP/1015
dt.10.12.07
Rs. 3767080.50
15.03.08 28.02.09 Final
variation
under
vetting
4/11/2009
80 CAO/Con/43/07 Construction & extension of
P.F. bet. Peppeganj(ex)-
Campier ganj (in).
W/con/362/II/904/W-
3(5) dt. 21.08.07
CAO/Con/GKP/1010
dt.20.11.07
Rs. 2295805.5
20.12.07 30.05.09 Final
variation
under
vetting
25/10/09
81 L.T.No.
CAO/Con/43/07 (1)
Construction & extension of
P.F. bet. Campier ganj (ex)-
Lokvidyapith Nagar.
W/Con/362/II/904/W-
3(1)/2912 dt. 6.9.07.
CAO/Con/GKP/1032
dt.25.01.08
Rs. 7268289.96
5.10.08 31.07.09 Final bill
entered in
MB.
82 L.T.No.
CAO/ Con/43/07(3)
Construction & extension of
P.F. bet. Purandarpur-
Nautanwa (ex.) .
W/Con362/II/904/W-
3(3)/2801 dt.17.08.07
CAO/Con/GKP/1020
dt.24.12.07
Rs. 4460535/-
16.12.07 31.03.09 Extension
under
process,
work in
progress
83 CAO/Con/31/ 08 (2) Construction and extension of
platform etc. and other
miscellaneous work between
Gorakhpur(ex) to
Nautanwa(ex)
W/Con/362/II/962/W-
3(2)/2705 dt. 18.8.08
CAO/Con/GKP/1124
dt.12.01.2009
Rs. 24514745/-
17.11.08 31.12.09 Work in
progress
84 LT No.
CAO/Con/ 01/08 (2)
Construction & extension of
P.F. at Nakha jungle.
W/Con/362/II/946/W-
3(2) dt.31.03.08
CAO/Con/GKP/1107
dt.29.09.08
Rs. 4877595.20
30.06.08 30.04.09 Final bill
is being
entered in
MB.
15.11.09
85 CAO/Con/45/ 08 Construction of 2 no.
Washable Aprons along with
the water filling arrangement
and other leftover
miscellaneous work at
Gorakhpur Yard
W/Con/362/II/974/W-
3/365 dt. 19.11.08.
Dy.CE/Con/W/GKP/
01 dt. 06.01.09
Rs. 43725800/-
18.03.09 31.10.09 Work in
progress
86 CAO/Con/03/07 Construction of Rake
handling platform, approach
road etc. at Nautanwa .
W/Con362/II/872/W-3
dt. 24.05.07.
CAO/Con/GKP/1012
dt.28.11.07
Rs. 15398932/-
23.10.07 30.11.09 Work in
progress
87 CAO/Con/54/ 07 (2) Widening, regrading,
resurfacing the approach road
of various level crossing as
per Rly. standard (IRPWM)
and specification etc. between
ANDN(excl.) to NTV(incl.)
W/Con/362/II/914/W-
3(2) dt. 14.9.07
Dy.CE/Con/W/GKP/
03 dated 12.05.09
Rs. 7575800/-
14.12.07 31.10.09 Work in
progress
88 CAO/Con/33/ 07 (4) Construction of Island
platform at GKP etc.
dt.19.9.07,
W/Con/362/II/897/W-
3(4) dt. 19.09.07.
CAO/Con/GKP/1041
dt.15.02.08
Rs. 32239645/-
18.01.08 31.05.09 Extension
under
process,
work in
progress
89 CAO/Con/54/ 07 (1) Widening, regrading, re-
surfacing of the approach
road of various level crossing
etc between GKP-ANDN.
W/Con/362/II/914/W-
3/6 dt. 31.12.07
CAO/Con/GKP/1078
dt.25.4.08
Rs. 8037120/-
30.03.08 30.09.09 Extension
under
process,
work in
progress
90 CAO/Con/05/08 (1) Construction washable apron
, water filling arrangement
etc. and other miscellaneous
work at Nautanwa
W/Con/362/II/947/W-
3(1)/1474 dt. 28.04.08.
CAO/Con/GKP/1126
dt.13.01.09.
Rs. 20776050/-
27.07.08 30.08.09 Extension
under
process,
work in
progress
91 CAO/C/04/08 (2) Manufacturing , supplying
and stacking of 65 mm
maximum size machine
crushed stone ballast etc bet.
ANDN-BNY km.41/0 to
Km.112/9 .
W/Con/362/II/945/W-3
(2)
dt.16.3.08
CAO/Con/GKP/1087
dt.10.06.2008.
Rs. 61560000/-
15.09.08 25.09.09 Final bill
entered in
MB. Final
variation
under
preparatio
n.
92 CAO/Con/27/07 (1) Rebuilding /strengthening of
left over minor Br. No.2, 25,
26 & 28 and other misc. work
etc. (Rs.7258370/-)
W/Con/362(II)/
891/W-3(1) dt.
22/6.7.09
CAO/Con/GKP/1033
dt.25.01.08
Rs. 7258370/-
5.12.07 31.08.09 Final bill
is being
entered in
MB.
25.11.09
93 CAO/Con/52/06 (1) Rebuilding /strengthening of
major bridges No.71(8x6.1
mtr. PSC slab) on pile
foundation etc. in connection
of gauge conversion of GKP-
GD (loop) including ANDN-
NTV section (Rs.83787293/-)
W/Con/362/II/850/W-
3(1) dt.5.02.07
CAO/Con/GKP/983
dt.30.5.07
Rs. 83787293/-
4.05.08 31.12.09 Work in
progress
94 L.T.No.
CAO/Con/21/ 07
Earthwork in formation, other
miscellaneous work including
linking of B.G. track for
Engg. siding at Katka
W/Con/362/II/886/W-
3/1621 dt. 23.05.07
CAO/Con/GKP/989
dt.25.7.07
Rs. 2205897/-
22.7.07 30.11.08 Final bill
is being
entered in
MB.
10.11.09
95 CAO/Con/53/ 03 Rebuilding/strengthening of
major bridges between Anand
nagar-Naugarh station.
W/Con/362/II/594/W-3
dt.12.4.04.
CAO/Con/GKP/817
dt.31.05.05
Rs. 24136528/-
11.10.05 20.06.200
7
Final bill
entered in
MB. Final
variation
in
process.
30.10.09
96 CAO/Con/37/ 04 Rebuilding of
Br.No.55(5x3.65 PRC slab)
Br.No.59(3x6.09 RCC
slab),Br.No.61(5x3.65 RCC
slab),Br.No.62,63,67with
PSC slab on open foundation
including track linking on
temporary&permanent
diversion bet. Sohratgarh to
Burhni station in ANDN-GD
section.
W/Con/362/II/634/W-
3/3243 dt. 31.08.04
CAO/Con/GKP/822
dt.17.05.05
Rs. 29869080/-
30.02.06 30..06.07 Final bill
entered in
MB. Final
variation
in
process.
10.11.09
97 CAO/Con/89/08 (1) Hiring of 2 nos. road vehicle
Tata Sumo or Marshal or
Bolero for inspection at
various on going work during
Mega Block period.
W/Con/362/II/1014/W-
3(1)/170 dt. 25.3.09
Dy.CE/Con/W/GKP/
04 dt. 20.07.09
Rs. 232400/-
24.07.09 24.07.09 Final bill
entered in
MB. Final
variation
in
process.
30.11.09
98 CAO/Con/58/07 (3) Hiring of vehicles in
connection with supervision
of various work in connection
with patch doubling work bet.
MND-BV, DMG-SWA and
W/Con/362/II/905/W-
3/3251 dt. 4.10.07
CAO/Con/GKP/1008
dt. 14.11.07
Rs. 886600/-
3.9.08 31.3.09 Final
variation
under
vetting
31.10.09
gauge conversion of GKP-
Barhni-GKP-ANDN.
99 CAO/Con/14/08 (1) Hiring of road vehicle(Tata
Sumor/Marshal/Bol;ero/Quali
st or similar for officials
under Dy.CE/Con/West
W/Con/362/II/953/W-
3(1) dt. 27.5.08
CAO/CON/gkp/1125
dt. 12.11.09
Rs. 263550/-
26.05.09 26.5.09 Final
variation
under
vetting
31.10.09
Dy. CE/Con/NE
100 Hathua-Bhatani CAO/Con/69/ 08 Construction of well
foundations Pier abutment for
major bridge on Jharahi river
(4x18.30m composite girder)
between Bhatni - Bathua Bazar
including costing of deck slab
in connection with Hathua
Bhatni New B.G. line
W/Con/362/ II/989/W-3
dt. 6.11.08
Dy CE/Con
/NE/GKP/06 dt.
19.3.09
Rs. 25563725/-
05.7.09 - - - Due to non
availability
of girder
work is in
heldup
101 -do- CAO/Con/58/2008/
(3)
Linking of track loading/
leading/unloading of various
P. Way materials between
Phulwaria and Bathua Bazar
stations in connection with
construction of Hathua -
Bhatni New BG line.
W/Con/362/ II/986/W-
3(3) dt. 24.11.08
Dy
CE/Con/NE/GKP/07
dt. 13.4.09
Rs.4450112.77
23.3.09 31.10.09 - - Work is in
progress
102 -do- CAO/Con/83/2007/
(2)
Balance earthwork and
blanketing in formation,
construction of minor bridges
and casting of deck slab etc.
on major bridges between km
2.42 to km 22.00 in Hathua -
Bathua Bazar section in
connection with Hathua-
Bhatni New BNG line.
W/Con/362/ II/924/W-3
(3) dt. 2.01.08
CAO/Con/1051 dt.
10.3.08
Rs.59952364.40
01.03.09 31.5.09 - - -
103 -do CAO/Con/45/ 06
(4)
Alumino Thermit welding of
52Kg/90R rails by SKV
process at cess in stack
between Hathua - Bathua
Bazar section in connection
with Hathua-Bhatni New BG
line.
W/Con/362/ II/814/W-3
(4) dt. 13.09.06
CAO/Con/ GKP/941
dt. 27.11.06
Rs.4360850/-
12.01.07 30.09.08 - - -
104 -d- CAO/Con/02/ 06
(1)
Linking of track construction
of station building platform at
Lain Bazar Construction of
level crossing gate lodge
staff quarters and other misc
works between Hathua (incl)
to km 12/0 in connection with
co0nstruction of Hathua –
Bhatni new BG line.
W/Con/362/ II/827/W-3
(1) dt. 20.09.06
CAO/Con/ GKP/927
dt. 7.11.06
Rs.16349483.45
19.12.06 15.12.08 Final bill
under
preparatio
n
-
105 -do- CAO/Con/53/ 07 (5) Hiring of Tata Sumo/Bolero
or similar vehicle for
inspection of ongoing
construction works of
Hathua-Bhatni new line and
W/Con/362/ II/913/W-3
(5) dt. 8.10.07
CAO/Con/GKP/1019
dt. 20.10.07
Rs.427980/-
07.8.07 - - - -
Gorakhpur Cantt.- Baitalpur
doubling
106 -do- CAO/Con/53/ 06 Consultancy preparation &
supply of Architectural
drawings including plan with
site plan elevation etc. on
AUTO CAD of Lain Bazar,
Salar Khurd, Phulwaria &
Bathua Bazar station
buildings or any other station
and scaled down models of
Salar Khurd and Phulwaria
station building or any other
station in connection with the
Const. of New BG line.
W/Con/362/ II/851/W-3
dt. 23.11.06
CAO/Con/ GKP/947
dt. 18.01.07
Rs.167300.50
22.12.06 22.7.07
Final bill
under
preparatio
n
- -
107 -do- CAO/Con/68/07 (2) Construction works on
platform staff quarters at
different stations gang hut &
other misc. works in Hathua
Bathua Bazar section in
connection with Hathua
Bhatni new BG line project.
W/Con/362/ II/924/W-3
(2) dt. 27.11.07
CAO/Con/GKP/1070
dt. 31.3.08
Rs.16961461/-
26.5.08 30.7.09 - - Applied for
DOC &
work is in
progress
108 -do- CAO/Con/11/ 08 (1) Construction of well
foundations Pier abutment for
major bridge on Chhoti
Gandak river (8x18.30m
composite girder) between
Bhatni - Bathua Bazar
including costing of deck slab
in connection with Hathua
Bhatni New B.G. line
W/Con/247/02/NE(1)
dt. 7.05.09
-
Rs. 41828651.25
06.5.2010 - - - Work to be
started
109 -do- CAO/Con/11/ 08(2) Construction of well
foundations Pier abutment for
major bridge on Haldi Khas
river (2x18.30m composite
girder) and Khanua river
(6x18.30m composite girder)
between Bhatni-Bathua Bazar
including costing of deck slab
in connection with Hathua
Bhatni New B.G. line
W/Con/247/02/NE(2)
dt. 7.05.09
-
Rs. 46628172.10
6.05.2010 - - - Work is in
progress
110 Chhitauni-Tamkuhi
Rd.
CAO/Con/25/ 07 (2) Construction of station
buildings & platform at
Chhitauni, gate lodge staff
quarter and other misc. works
between Paniyahwa-Chhitauni
in connection with Constn.of
Paniyahwa Chhitauni Tamkuhi
Rd. new BG line.
W/Con/362/ II/889/W-3
(2) dt 7.6.07
CAO/Con/GKP/1042
dt. 20.2.08
Rs.9000302.50
6.9.07 31.3.09 Final bill
under
preparatio
n
- -
111 -do- CAO/Con/30/07 Earthwork and blanketing in
formation and turfing etc.
between Paniyahwa –
Chhitauni stations in
connection with new BG line
W/Con/362/ II/871/W-3
dt.31.5.07
CAO/Con/GKP/1037
dt. 6.2.08
Rs.17440455/-
30.11.07 15.7.09 Final bill
under
preparatio
n
- -
between Chhitauni Tamkuhi
Rd.
112 -do- CAO/Con/25/07 (1) Linking of track, construction
of level crossing, installation
of lifting barrier etc. and other
misc. works between
Paniyahwa- Chhitauni in
connection with construction
of Paniyahwa – Chhitauni –
Tamkuhi Rd. new BG line.
W/Con/362/ II/889/W-3
(1) dt. 27.6.07
Not done
Rs.4120559/-
- Delay due to
nonavailabili
ty of
material
113 GKC-BALR CAO/Con/82/ 07 (2) Alumino Thermit welding of
52Kg/90R rails by SKV
process at cess in stack in
Gorakhpur Cantt.-Baitalpur
section in connection with
doubling of Gorakhpur
Cantt.-Baitalpur or any where
in the jurisdiction Dy
CE/Con/NE/GKP.
W/Con/362/ II/921/W-3
(2) dt. 17.03.08
CAO/Con/ GKP/04
dt. 02.02.09
Rs.4060000/-
16.12.08 31.12.09 - - Work is in
progress
114 -do- CAO/Con/37/ 06 In Connection with doubling
of Gorakhpur Cantt. to
Baitalpur section of Varanasi
Division construction of
bridges on well foundation,
substructure and deck in
super structure of bridge
No.171 (2x18.30m composite
girder) between Kusmhi-
Sardarnagar stations and well
foundation, substructure and
PSC superstructure of Br. No.
149 (3x18.30m PSC girder)
between Gauri Bazar -
Baitalpur stations Br. No. 160
(3X18.30m PSC girder)
between Chauri Chaura -
Gauri Bazar stations Br.
No.172 (4x18.30m PSC
girder) between Kusmhi -
Sardarnagar stations and Br.
No. 173 (4x18.30m PSC
girder) between Gorakhpur
Cantt.-Kusmhi stations.
W/Con/362/ II/830/W-3
dt. 23.11.06
CAO/Con/ GKP/954
dt. 23.02.07
Rs.108090217/-
22.01.08 28.2.09 Final bill
under
preparatio
n
- -
115 -do- CAO/Con/63/08 (2) Supplying, Laying and fixing
of 100mm thick stone blocks
(from Chunar or near by area)
of approved size and shape
etc. over 50 mm thickness of
local sand layer on 299mm
thick WBM etc. at rake
handling platforms of Kusmhi
and Sardarnagar stations. The
rates is inclusive of all labour,
materials, sand, tools, plants,
equipments etc. with all lead,
W/Con/362/ II/990/W-3
(2) dt. 19.01.09
Dy CE/Con /NE/
GKP/05 dt. 03.03.09
Rs.31542669.30
18.7.09 31.12.09 - - Work is in
progress
lifts ascends, descends, xing
of track, cutting of stone
blocks etc. at site for proper
completion of work as per
direction of Engineer - in -
Charge at site complete job.
116 -do- CAO/Con/68/ 07(1) Construction of camp office
& store for Sr. Section
Engineer/Con/Tel. in Bichhia
Railway Colony, Gorakhpur
W/Con/362/ II/924/W-3
(1) dt 06.11.07
CAO/Con/GKP/1030
dt. 18.01.08
Rs.3558902.23
05.3.08 15.03.09 Final bill
under
preparatio
n
- Work is in
progress
117 -do- CAO/Con/03/ 09(2) Hiring of 2 Nos. Road
vehicles like Tata
Sumo/Marshal/Bolero or
Similar vehicle for official
use of XEN/Con /NE/GKP &
XEN/Con / HTW.
W/Con/247/ 01/NE dt
31.3.09
DY CE/Con/ GKP/09
dt. 16.6.09
Rs.564279.60
30.3.2010 - - - Work is in
progress
118 -do- CAO/Con/28/ 06(1) Earthwork and blanketing in
formation, construction of
minor bridges and other misc.
work such as signal building
platforms, FOBs OFC huts,
fencing etc. between
Gorakhpur cantt to Baitalpur
station in connection with
doubling of Gorakhpur Cantt.
to Baitalpur section of
Varanasi Division.
W/Con/362/ II/830/W-3
(1) dt. 18/29.01.07
CAO/Con/ GKP/969
dt. 23.3.07
Rs.238723165/-
28.3.08 31.7.09 - - Applied
DOC &
Work is in
progress
119 -do- CAO/Con/26/ 08(1) Manufacturing, supplying and
stacking of 50mm nominal
size machine crushed stone
ballast as per RDSO’s
specification of June04 with
up to date correction slips
from Pvt. Quarry in
DALLA/Billi range to Chauri
Chaura (excl.) to Baitalpur
(incl) in GKC-BALR section
of Varanasi Division of N E
Railway along the cess in
Rly. land as per direction of
Engineer-in-charge in
connection with doubling of
Gorakhpur Cantt. - Baitalpur
section.
W/Con/362/ II/958/W-3
(1) dt. 4.8.08
Dy CE/Con/ NE/
GKP/03 dt. 29.01.09
Rs.33329300/-
03.5.09 31.3.2009 - - Work is in
progress
120 -do- CAO/Con/28/ 07(3) Linking of BG track manually
including slewing and
dismantling BG track
wherever required, carting
and stacking of released
materials, spreading of
ballast, transportation of
52kg/90R S.H./New Rails,
PSC sleepers 60kg from
sleeper factory or any other
Railway station, P.way
materials etc. from different
W/Con/362/ II/892/W-3
(3) dt. 16.08.07
CAO/Con/GKP/1006
dt. 7.11.07
Rs.15564949/-
15.12.07 31.12.09 - - Work is in
progress
places to various station
places and linking level xing,
bridges etc. between Chauri
Chaura (incl)-Baitalpur (incl)
in connection with GKC-
BALR patch doubling
project.
121 -do- CAO/Con/28/ 07(2) Linking of BG track manually
including slewing and
dismantling BG track
wherever required, carting
and stacking of released
materials, spreading of
ballast, transportation of
52kg/90R S.H./New Rails,
PSC sleepers 60kg from
sleeper factory or any other
Railway station, P.way
materials etc. from different
places to various
station/places and linking
level xing, bridges etc.
between GKC (incl) Chauri
Chaura (excl.) in connection
with GKC-BALR patch
doubling project.
W/Con/362/ II/892/W-3
(2) dt. 08.08.07
CAO/Con/GKP/1003
dt. 11.10.07
Rs.16120686/-
7.12.07 31.12.09 - - Work is in
progress
122 -do- CAO/Con/26/ 08(2) Manufacturing, supplying and
stacking of 50mm nominal
size machine crushed stone
ballast as per RDSO’s
specification of June04 with
upto date correction slips
from Pvt. Quarry in
DALLA/Billi range to
Gorakhpur Cantt. - Chauri
Chaurar (incl) in GKC-BALR
section of Varanasi Division
of N E Railway along the cess
in Rly land as per direction of
site Engineer-in-charge in
connection with doubling of
Gorakhpur Canll. - Baitalpur
section.
W/Con/362/ II/958/W-3
(2) dt. 4.8.08
Not done
Rs. 33506745/-
02.5.09 31.3.
2010
- - Work to be
started
123 -do- CAO/Con/72/ 07(3) Supplies Laying and fixing of
CC paver on passenger
platform of various stations
between GKC-BALR
interlocking doubling work
W/Con/362/ II/915/W-3
(3) dt. 6.2.08
Not done
Rs. 4647428/-
05-11-08 - - - Work to be
started
124 CPJ-THE CAO/Con/78/ 07(1) Earthwork and blanketing on
permanent diversion,
construction of major bridges
Nos. 46A between Ramkola -
Barharaganj, 40B bet.
Padrauna - Kathkuiyan on
well foundation and other
misc. work in connection with
gauge conversion of
W/Con/362/ II/929/W-3
(1) dt. 03-01-08
CAO/Con/GKP/1076
dt. 23.4.08
Rs.38173676/-
02.10.08 31.08.09 - - -
Kaptanganj–Thawe-Siwan-
Chhapra project.
125 -do- CAO/Con/54/ 08(3) Linking of track loading/
leading/unloading of various
P. Way materials and fixing
of hexagonal/Paver block
between Dudahi (excl) -
Thawe stations in connection
with gauge conversion of
Kaptanganj – Thawe section.
W/Con/362/ 948 /W-
3(2) dt. 23.10.08
Dy CE/Con /NE/
GKP/01 dt. 26.12.08
Rs.55345876.57
22.7.09 - - - Delay due to
non
availability
of material
126 -do- CAO/Con/58/ 08(4) Linking of track loading/
leading/unloading of various
P. Way materials and fixing
of hexagonal /Paver blocks
between Kaptanganj (incl) -
Dudaahi (incl) stations in
connection with gauge
conversion of Kaptanganj –
Thawe section.
W/Con/362/ II/ 968/W-
3 (4) dt. 23.10.08
Dy CE/Con/ NE/
GKP/10 dt. 28.8.09
Rs.54871861.70
22.7.09 30.5.2010 - - Work is in
progress
127 -do- CAO/Con/73/07(1) Earthwork in
formation/widening/
temporary diversion,
construction of minor bridges,
signal building platform OFC
hut, FOB, fencing etc. and
other misc works bet.
Tamkuhi Road (excl) –
Thawe (incl) in connection
with gauge conversion of
Kaptanganj–Thawe-Siwan-
Chhapra project.
W/Con/362/ II/894/W-3
(1) dt. 7.12.07
CAO/Con/GKP/1052
dt. 10.3.08
Rs.46110712.50
6.2.09 31.12.09 - - Work is in
progress
128 -do- CAO/Con/01/ 05(1) Construction of platform,
signal building , level
crossing & other misc. works
in Dudahi (incl) – Kaptanganj
(incl) in Kaptanganj-Thawe-
Siwan-Chhapra gauge
conversion project.
W/Con/362/ II/648/W-3
(1) dt. 31.3.05
CAO/Con/ GKP/856
dt. 15.12.05
Rs.4758171/-
30.11.09 31.3.07 Final bill
under
preparatio
n
-
129 -do- CAO/Con/11 /04 Supplying, Spreading,
stacking, blanketing material
as per RDSO’s guideline for
earthwork in Rly. Project with
upto date correction slips
including Mechanical
compaction with vibratory
Roller and manufacturing &
stacking of 50mm nominal
size hand broken track ballast
as per RDSO’s specification
1999 with upto date
correction slips on the top
/along the bank of the newly
constructed permanent
diversion of bridge No. 22 at
km 358/6-7 between
Bodarwar-Kaptanganj in
W/Con/362/ II/610/W-3
dt. 3.6.04
CAO/Con/ GKP/857
dt. 15.12.05
Rs.6440050/-
2.11.04 15.2.08 Final bill
under
preparatio
n
- -
Gorakhpur –Khadda section
in connection with rebuilding
of bridges under SRSF.
130 -do- CAO/Con/73/ 07(2) E/work in
formation/widening/
temporary diversion const. of
minor bridges, signal building
platform OFC hut, FOB ,
fencing etc. and other misc.
works between Kaptanganj
(incl.)Tamkuhi Rd. (incl.) in
connection with gauge
conversion of Kaptanganj –
Thawe –Siwan - Chhapra
project.
W/Con/362/II/879/W-
3(2) dt. 24.12.07
CAO/Con/GKP/1092
dt. 11.7.08
Rs.46342488.50
23.2.09 31.10.09 Work is in
progress
131 -do- CAO/Con/15/08 E/work and blanketing on
permanent diversion const. of
major bridges No. 20A,
between Dudhai -Tamkuhi Rd
9 between Jalalpur -
Sasamusa and 3A bet
.Sasamusa - Thawe on pile
foundation and other misc.
work in connection with
gauge conversion of
Kaptanganj-Thawe-Siwan-
Chhapra project.
W/con/362/II/929/W-
3(2) dt 21/23.05.08
Dy CE/Con/NE/
GKP/02
dt. 07.01.09
Rs.28752429.85
22.02.09 31.3.2010 Work is in
progress
132 -do- CAO/Con/76/ 07(2) Carrying out soil
investigation for const. of
bridges, platform wall and
embankments in the
jurisdiction of Dy
CE/Con/NE/GKP
W/Con/II/927/W-3(2) dt
24.1.08
CAO/Con/GKP/1111
dt. 01.10.08
Rs.262570/-
11.11.08 - Final bill
under
preparatio
n
133 -do- CAO/Con/65/ 06(1) Supplying, stacking,
spreading of blanketing
materials as per RDSO’s
guide line for E/work in Rly
project with upto date
correction slips including
mechanical compaction with
vibratory roller, unloading &
spreading of ballast on the
top/along the bank of newly
constructed permanent
diversion of bridge No. 38 at
km 340/5-6 bet.
Ghughli/Siswa Bazar stations
and rebuilding of minor
bridge No. 21 (1x3.66m)
RCC Box at km 359/3-4
between Bodarwar-
Kaptanganj stations and other
misc. works in Gorakhpur -
Khadda section under SRSF.
W/Con/362/ II/864/W-3
(1) dt. 6.3.07
CAO.Con/ GKP/995
dt. 27.8.07
Rs.10444637.50
05.8.07 30.11.08 Final bill
under
preparatio
n -.
Dy CE/Con/Bridge
134 Jiradai-Bhatani CAO/CON/91/07 (I) Fabrication, supplying,
transporting stacking of
12x24.4m. and span welded
type composite girders as per
RDSO,Drg.No.
RDSO/B/1730 &
RDSO/B/1569/R series for
bridge No.112(5x24.4m.)
and Br.No.119(7x24.4) on
Varanasi divi.of N.E.Railway.
W/Con/362/II/908/W-
3/(1)
Dt. 5.4.2008
Dy.CE/Con/Br/GKP/
03 dt.18.03.09
Rs. 4,43,14,730/-
04.03.09 30.10.09 - - Work is in
progress.
135 DMG-SWA
KLD-MND
CPJ-THE
CAO/CON/
10/2006(I)
Fabrication,supplying and
stacking of riveted type MBG
standard Open Web Bridge
girders of 31x30.5m span
including bearings for
Br.No.182,183,238 and 137
of N.E.Railway.
W/Con/362/II/
811/W-3/(1)
Dt.10.08.2006
CAO/Con/
GKP/922 dt.19.10.06
Rs. 12,62,47,693/-
09.02.08 09.06.10 - - Work in
progress
136 DMG-SWA CAO/CON/
10/07 (2)
Fabrication,supplying and
stacking of riveted type MBG
standard Open Web Bridge
girders of 9x45.7m span as
per including bearings for
Br.No.184 on GKP-GD
section of LJN divi. of
N.E.Railway.
W/Con/362/II/811/W-
3/(11)
3144
Dt.25/3.08.06
CAO/Con/
GKP/1045
Dt.04.03.08
Rs. 4,61,38,431/-
30.07.07 31.05.09 Final bill
prepared.
- Final bill
Under
signnature
137 DMG-SWA
SWA-MND
ANDN-GD
(Loop)
CAO/CON/
17/2006
Fabrication,supplying and
fixing of steel channel
sleepers for
Br.No.66,72,137,57,182,183,
& 238.
W/Con/362/11/908/W-
3/(1)
Dt.20.06.06
CAO/Con/
GKP/952
Dt.09.02.07
Rs.3,21,18,205/-
19.05.09 30.9.09 - - Work is in
progress.
E.O.T.
applied.
138 CPJ-THE
EKMA-ZRDE
GKP-GD
(Loop)
KSJ-MRT
BE-IZN.
CAO/CON/91/07 (I) Fabrication,supplying and
fixing of steel channel
sleepers for
Br.No.39,40B,20A,3A,63,97,
3,4,34,80,335 & 1032.
W/Con/362/II/898/W-3
Dt.27.04.08
CAO/Con/
GKP/1106
Dt.15.05.08
Rs.3,83,59,850/-
26.03.09 31.12.09 - - Work is in
progress.
139 MUR-BV CAO/CON/
86/2007 (5)
Fabrication, supply and
erection of steel structure of
FOB of MUR-BV section.
W/Con/362/II/
907/W-3/(1)
1155
Dt.03.04.08
Dy.CE/Con/Br/GKP/
04
Dt.31.03.09
Rs.1,42,75,456/-
03.03.09 30.7.09 - - Work is in
progress.
E.O.T.
applied.
140 SWA-MND
MND-BV
CAO/Con/
79/08(I)
Fabrication and erection of
steel structure of FOB at
diff.stations on SWA-MND,
& MND-BV section.
W/Con/362/II/952/W-
3/(1)
Dt.18.12.08
Dy.CE/Con/Br/GKP/
05
Dt.01.05.09
Rs.2,49,09,000/-
17.11.09 - - - Work is in
progress.
141 Indara-Mau Doubling
Bhatni-BathuaBazar
New Line
THE-CPR
GC &
ANDN-GD (Loop)
CAO/Con/
79/08(1)
Fabrication,transporting,suppl
y and stacking of 6x24.4m.
welded type Bridge girders at
Br.No. 72 of Indara-Mau
Jn.doubling work as per
drg.No.RDSO/BA-16005
series, 5x18.3 m. welded type
W/Con/362/II/
1004/W-3/(1)
715
Dt.04.04.09
-
Rs.4,11,31,515/-
03.03.10
- - - Work is in
progress.
composite girders at
Br.No.32(4x18.3m.) of
Bhatni-Bathua Bazar new line
project and
Br.No.22(1x18.3m.) at THE-
CPR gauge conversion
pro9ject and 9x12.2m. welded
plate girders for
Br.No.57(9x12.2m.) span for
GKP-GD(L00p) Gauge
conversion project of
N.E.Railway.
142 MAU-Indara,
CPR-THE
CPJ-THE
BUW-BBK
CKG-GHT
BE-LKU
KSJ-BE
CAO/Con/05/2009 Fabrication, Galvanising,
supplying and fixing of steel
channel sleepers with fittings
on Br.No.72(6x24.4m.)
53A(2x45.7m.) &
46B(1x45.7m.) on Varanasi
division
Br.No9.s403(1x30.5m.)
404(1x30.5m.) & 391
(17x61.0m.) on Lucknow
division and Br.No.41
(4x30.5m.) & Br.No.409
(10x61.0) on Izatnagar
division of N.E.Railway.
W/247/Con/Br/Ch.Sleep
er/
61.0 m
Dt.15.05.09
-
Rs.5,34,97,968.78
14.11.10 - - - Work is in
progress.
143 KSJ-MRT CAO/Con/12/08(1) Fabrication and erection of
steel structure of FOB and
PP.Shelter at different station
on KSJ-MRT section of IZN
division
W/Con/362/II/952/W-
3/(1) dt. 7.10.08
CAO/Con/GKP/1122
dt.30.12.08
Rs. 1,16,65,000/-
06.02.09 - Variation
statement
prepared.
- Work
completed
Variation
statement
under
contractor
signature.
144 BE-IZN
ANDN-GD
CPJ-THE
KSJ-MRT
CAO/CON/
48/07 (3)
Assembling & Launching of
riveted type open web
bridgegirders of 30.5m. and
45.7m. span as per RDSO’
drg.for different bridges on
Br.No.1032, 34, 20A, 40B &
335 of Varanasi, Lucknow &
IZN division of N.E.Railway.
W/Con/362/II/908/W-3/
(3)
Dt.13.9.07
CAO/Con/GKP/1039
Dt.06.02.08
Rs.2,05,44,902/-
12.08.08 31.10.09 - - Work is in
progress.
145 DMG-SWA CAO/Con
52/06(3)
Assembling & Launching of
open web type bridge girders
of 9x 45.7m. for Br.No.184
bet.Sahajanwa-Jagatbala
stations on GKP-GD section
of, Lucknow division of
N.E.Railway including
fabrication & erection of
trolly refuges and footpath on
the bridge girder.
W/Con/362/II/850/W-
3/(3)3012
Dt.13/17.9.07
CAO/Con/GKP/1098
Dt.31.07.08
Rs.2,99,05,020/-
16.08.08 15.06.09 - - Work held
up on
account of
unavailabilit
y of girders.
146 DMG-SWA CAO/Con/64/06 Assembling & Launching of
open web type bridge girders
of 14x30.5m. Br.No.183
bet.Domingarh-Jagatbala
stations on GKP-SWA
doubling work of Lucknow
division of N.E.Railway
W/Con/362/II863/W-3
Dt.15.3.07
_
Rs.2,38,81,050/-
14.02.08 31.10.09 - - Work is in
progress.
including fabrication &
erection of trolly refuges and
footpath on the bridge girder.
147 DMG-SWA SWA-
MND
CAO/Con/57/06 Assembling & Launching of
rivetted type bridge girders of
10x30.5m. Br.No.182
bet.Domingarh-Jagatbala
stations on GKP-SWA
doubling work and 238
(2x30.5m.) bet.Chureb-
Munderwa station of
Lucknow division of
N.E.Railway including
bearing as per RDSO’s
drg.No.RDSO/BA-11341-57
series including fabrication
& erection of trolly refuges
and footpath on the bridge
girder.
W/Con/362/II856/W-3
Dt.24/1.6/02 2007.
Dy.CE/Con/Br/GKP/
06 dt.10.08.09
Rs.1,98,01,900/-
05.01.08 31.10.09 - - Work is in
progress.
148 EKMA-ZRDE,GKP-
BALR, BALR-BTT,
BTT-ZRDE.
ANDN-GD
(Loop)
CAO/Con79/2008
(4)
Assembling and launching of
24.4 m., 18.3 m. and 12.2 m.
welded & composite girders
on Br.No.103, 171, 133, 97,
112, 119, 80 & Br.No.57 of
BSB & LJN division of
N.E.Rly.
W/Con/362/II/1004/W-
3/(4)599
Dt.27.01.09
Dy.CE/Con/Br/GKP/
02
Dt.27.02.09
Rs.2,60,45,682/-
26.12.09 - - - Work is in
progress.
149 GKP-GD
(Loop)
CPR-BSB SRSF.
- Erection and launching of
steel component for 30.5 m.
open web girders at
br.No.3(2x30.5m.) and
Br.No. 4(5x30.5 m) of GKP-
GD(loop) section of LJN div.
and Br.137(13x30.5 m) of
CPR-BSB section of BSB
division of N.E.Rly.
- CAO/Con/
GKP/828 dt. 27.6.05.
Rs.2,13,67,000/-
27.10.05 12.12.08 Work
completed
.
- Case file and
MB with
GM/Vig.
150 KSJ-BE
GKP-GD
(loop)
BUW-BBK
CAO/Con
79/08(3)
Carting of fabricated bridge
girders of 10x61.0 m. Open
web girders and 3x30.5 m.
welded type MBG standard
O.W. girders from
EWS/Arkonam, 8x30.5 m.
girders from BWS/Sabarmati
to and 7x30.5 m. girders
from EWS/MMR to different
bridge sites of N.E. Rly.
W/Con/362/II/1004/W-
3(3)/716 dt. 8.4.09
-
Rs.2,85,71,995/-
7.10.09 - - - Work is in
progress.
Dy. CE/Con/IZN/II
151 Kasganj – Mathura
GC
CAO/Con/23/04 Rebuilding of substructure of
Major bridge No. 272,272A
& 268
W/Con/362/II/615/W-3
/2351 Dt. 23.06.04
CAO/Con/GKP/773
dt. 09.08.04
Rs.47408151/-
22.02.06 31.12.07 Not
Drawn
31.03.10 Final bill
under
preparation
152 Kasganj – Mathura
GC
CAO/Con/20/06 (2) Rebuilding of substructure of
Major bridge No. 335 for
RKN-MTJ.
W/Con/362/II/821/W-3
(2) Dt. 10.08.06
CAO/Con/GKP/937
dt. 09.11.06
Rs. 33109743.20
09.07.07 31.12.08 Not
Drawn
31.12.09 Final bill
under
preparation
153 Kasganj – Mathura
GC
CAO/Con/36/07 (5) Transportation of P. Way
material etc.
W/Con/362/II/902/W-3
(5)/4237 Dt. 27.12.07
CAO/Con/GKP/1028
dt. 14.01.08
Rs. 34847600/-
26.10.08 30.08.09 Not
Drawn
31.03.09 Final bill
under
preparation
154 Kasganj – Mathura
GC
CAO/Con/36/07 (3) Misc works at station and
block section for KSJ(Excl)
Mendu (incl).
W/Con/362/II/902/W-3
(3) Dt. 17.09.07
CAO/Con/GKP/1022
dt. 31.12.07
Rs.23148511/-
16.08.08 31.05.09 Not
Drawn
30.11.09 Final bill
under
preparation
155 Kasganj – Mathura
GC
CAO/Con/36/07 (4) Misc works at station and
block section for Mendu
(Excl) Mathura (incl).
W/Con/362/II/902/W-3
(4)/4268 Dt. 27.12.07
CAO/Con/GKP/1035
dt. 04.02.08
Rs. 50668981.46
26.11.08 15.07.09 Not
Drawn
31.12.09 N.S. Under
process.
156 Kasganj – Mathura
GC
CAO/Con/65/07 (4) Const. of platform No. 2
washable apron etc.. at KSJ.
W/Con/362/II/921/W-3
(4)/461 Dt. 07.02.08
CAO/Con/GKP/1096
dt. 26.07.08
Rs. 28627868/-
06.08.08 15.08.09 Not
Drawn
31.12.09 Final bill
under
preparation
157 Kasganj – Mathura
GC
CAO/Con/13/08 Supply stacking of spreading
of blanketing materials.
W/Con/362/II/905/W-3
(3)/1631 Dt. 19.05.08
CAO/Con/GKP/1093
dt. 14.07.08
Rs. 52176054/-
18.09.08 31.01.09 Not
Drawn
31.12.09 N.S. under
process
158 Kasganj – Mathura
GC
CAO/Con/93/07 (2) Const. of Minor bridges for
Km.288/11-350/6
W/Con/362/II/939/W-3
(2)/249Dt. 18.01.08
CAO/Con/GKP/1058
dt. 24.03.08
Rs. 36265286.71
17.05.08 30.07.09 Not
Drawn
31.03.10 N.S. under
process
159 Kasganj – Mathura
GC
CAO/Con/93/07 (1) Const. of Minor Bridges for
Km. 245/2-3 to 288/11
W/Con/362/II/939/W-3
(1)/403 Dt. 21.01.08
CAO/Con/GKP/1057
dt. 24.03.08
Rs. 25094363.85
20.05.08 31.08.09 Not
Drawn
- Work in
progress
160 Kasganj – Mathura
GC
CAO/Con/93/07 (3) Const. of Minor Bridges of
span 1.00m, 1.5m and 2.00
(Segmental Construction).
W/Con/362/II/939/W-3
(3)/250 Dt. 18.01.08
CAO/Con/GKP/1054
dt. 13.03.08
Rs. 33925660.49
17.05.08 30.05.09 Not
Drawn
31.03.10 Final bill
under
preparation
161 Kasganj – Mathura
GC
CAO/Con/56/07 (7) Ballast supply on cess for
Mursan – Mathura Jn. From
Km. 321/3-4 to 350/12
W/Con/362/II/915/W-3
(7)/1232 Dt. 10.04.08
CAO/Con/GKP/1085
dt. 29.05.08
Rs. 34249300/-
09.01.09 09.04.09 Not
Drawn
30.11.09 Variation
under vetting
162 Kasganj – Mathura
GC
CAO/Con/56/07 (5) Ballast supply on cess for
Km. 283/5 to Km. 321/3.4
W/Con/362/II/915/W-3
(5) Dt.31.03.08
CAO/Con/GKP/1082
dt. 06.05.08
Rs. 40091000/-
30.12.08 28.02.09 Final
vitiation
under
process
30.11.09 Final bill
under
preparation
163 Kasganj – Mathura
GC
CAO/Con/80/07 (5) Ballast supply on cess for
Kasganj – Mathura section
from Km. from 247/13 to
Km. 256/11.
W/Con/362/II/905/W-3
(4)/1414 Dt. 28.04.08
CAO/Con/GKP/1101
dt. 20.08.08
Rs. 16746120/-
27.10.08 15.03.09 Not
Drawn
31.12.09 Final bill
under
preparation
164 Kasganj – Mathura
GC
CAO/Con/91/07 (4) Ballast supply in mendu
quarry.
W/Con/362/II/908/W-3
(4) Dt. 28.04.08
CAO/Con/GKP/1123
dt. 31.12.08
Rs. 44000000/-
27.10.08 31.08.09 Not
Drawn
- Work in
progress.
165 Kasganj – Mathura
GC
CAO/Con/77/08 (2) Ballast supply on cess for
Kasganj – Mathura section
W/Con/362/II/1002/W-
3 (2) Dt. 23.01.09
Dy
CE/Con/II/IZN/05
dt. 21.03.09
Rs. 19140000/-
22.03.09 31.07.09 Not
Drawn
- Work in
progress
166 Kasganj – Mathura
GC
CAO/Con/57/07 (4) Linking BG track Zone-I W/Con/362/II/917/W-3
(4)/3254 Dt. 03.10.07
CAO/Con/GKP/1048
dt. 04.03.08
Rs.20713619.10
02.04.08 30.06.09 Not
Drawn
31.03.10 N.S. under
process
167 Kasganj – Mathura
GC
CAO/Con/57/07 (5) Linking BG track (Zone-II) W/Con/362/II/917/W-3
(5) Dt. 05.11.07
CAO/Con/GKP/1105
dt. 10.08.08
Rs. 19756160.89
04.05.08 30.06.09 Not
Drawn
31.03.10 N.S. under
process
168 Kasganj – Mathura
GC
CAO/Con/57/07 (6) Linking BG track (Zone-III) W/Con/362/II/917/W-3
(6)/3253 Dt. 03.10.07
CAO/Con/GKP/1062
dt. 27.03.08
Rs. 23242807.50
02.04.08 15.07.09 Not
Drawn
31.03.10 N.S. under
process
169 Kasganj – Mathura
GC
CAO/Con/67/08 (4) Casting Manufacturing
transportation PSC Slab.
W/Con/362/II/991/W-3
(4) Dt. 22.11.08
Dy
CE/Con/II/IZN/01
Rs. 1013100/-
21.12.08 29.01.09 Not
Drawn
31.12.09 Subsidiary
Agreement
to be done
after
variation
170 Kasganj – Mathura
GC
CAO/Con/65/08 L.C. from L.C. No. 250 to
350A (55 Nos.)
W/Con/362/II/937/W-3
(1) Dt. 18.11.08
Dy
CE/Con/II/IZN/02
Rs. 17761610/-
02.03.09 25.05.09 Not
Drawn
31.12.09 Final bill
under
preparation
171 Kasganj – Mathura
GC
CAO/Con/65/07 (5) Widening of 52 Kg/90R Rails
by SKV process.
W/Con/362/II/921/W-3
(5)/981 Dt. 20.03.08
Dy
CE/Con/II/IZN/03
Rs. 12149000/-
09.03.09 30.06.09 Not
Drawn
- Work in
progress
172 Kasganj – Mathura
GC
CAO/Con/24/06 Manufacturing supplying &
stacking of 65 mm hand
broken ballast & Tanakpur
Yard.
W/Con/362/II/825/W-3
(4) Dt. 20.11.06
CAO/Con/GKP/960
dt. 02.03.07
Rs. 8265000/-
19.10.07 30.06.09 Not
Drawn
31.12.09 Final bill
under
preparation
173 Kasganj – Mathura
GC
CAO/Con/24/06 Manufacturing, supply and
stacking of 65 mm hand
broken ballast & Tanakpur
Yard.
W/Con/362/II/825/W-3
(1) Dt. 20.11.06
CAO/Con/GKP/965
dt. 12.01.07
Rs. 8265000/-
19.10.07 30.06.09 Not
Drawn
31.12.09 Final bill
under
preparation
174 Kasganj – Mathura
GC
CAO/Con/24/06 Manufacturing supplying &
stacking of 65 mm hand
broken ballast & Tanakpur
Yard.
W/Con/362/II/825/W-3
(3) Dt. 20.11.06
CAO/Con/GKP/944
dt. 12.01.08
Rs. 8265000/-
19.10.07 30.06.09 Not
Drawn
31.12.09 Final bill
under
preparation
175 Kasganj – Mathura
GC
CAO/Con/24/06 Manufacturing supplying &
stacking of 65 mm hand
broken ballast & Tanakpur
Yard.
W/Con/362/II/825/W-3
(2) Dt. 20.11.06
CAO/Con/GKP/946
dt. 12.01.09
Rs. 8265000/-
19.10.07 30.09.09 Not
Drawn
31.12.09 Final bill
under
preparation
176 Kasganj – Mathura
GC
CAO/Con/96/07 (2) Widening regarding,
resurfacing of L.C. No. 306 to
357.
W/Con/362/II/937/W-3
(2) Dt. 23.04.08
CAO/Con/GKP/1104
dt. 08.09.08
Rs. 27644583.97
22.04.08 31.08.09 Not
Drawn
- Work in
progress
177 Kasganj – Mathura
GC
CAO/Con/17/09 (1) Execution of balance misc.
work etc. from Km. 302/0 to
Km. 350/6.
W/Con/247/Type-
II/Mendu/MTJ-KJN
Dt. 08.08.09
Not executed as yet
07.02.09 - Not
Drawn
- Work in
progress
178 Bareilly – Kasganj
GC
CAO/Con/45/07 (1) Construction of S&T building
bet. BRY Jn. – KSJ Jn. BRY
– KSJ section.
W/Con/362/II/905/W-3
(1) Dt. 19.09.07
CAO/Con/GKP/1025
dt. 07.01.08
Rs.10928251/-
18.08.08 31.03.09 Not
Drawn
- Work in
progress
179 Bareilly – Kasganj
GC
CAO/Con/71/07 (3) Manufacturing supplying &
stacking of machine crushed
broken ballast KSJ- SRN.
W/Con/362/II/903/W-3
(3) Dt. 06.05.08
CAO/Con/GKP/1100
dt. 08.08.08
Rs. 15810000/-
05.03.09 31.07.09 Not
Drawn
- Work in
progress
180 Bareilly – Kasganj
GC
CAO/Con/55/08 (2) Rebuilding of Major bridge
No.
375,377,378,379,400,404,406
,407A, 408,411,418.
W/Con/362/II/884/W-3
(2) Dt. 13.01.09
CAO/Con/GKP/1134
dt. 14.07.09
Rs. 306343685/-
12.07.10 12.07.10 Not
Drawn
- Work in
progress
181 Bareilly – Kasganj
GC
CAO/Con/55/08 (1) Rebuilding of Major bridge
No. 347, 352, 357, 358, 360,
361, 364, 373 & 374.
W/Con/362/II/884/W-3
(1)/62 Dt. 05.01.09
CAO/Con/GKP/1133
dt. 10.06.09
Rs. 320980285/-
04.07.10 04.04.10 Not
Drawn
- Work in
progress
182 Bareilly – Kasganj
GC
CAO/Con/76/08 (3) Manufacturing supplying &
stacking BRY – KSJ section
between Bareilly – Badaun.
W/Con/362/II/1001/W-
3 (3) Dt. 18.06.09
CA Not executed as
yet
17.06.10 17.06.10 Not
Drawn
- Work in
progress
183 Bareilly – Kasganj
GC
CAO/Con/76/08 (4) Manufacturing supplying &
stacking SRN – BEM section
W/Con/362/II/1001/W-
3 (4) Dt. 18.06.09
CA Not executed as
yet
17.06.10 17.06.10 Not
Drawn
- Work in
progress
184 Diesal Shed/
Izatnagar
CAO/Con/61/08 (2) Construction of new shed etc.
for creation of maintenance
facilities for 25 locos.
W/Con/362/II/987/W-3
(2) Dt. 16.01.09
Dy
CE/Con/II/IZN/15
Dt. 06.04.09
Rs. 21457559/-
15.04.10 15.04.10 Not
Drawn
- Work in
progress
Dy. CE/Con/Genl
185 SWA-MND Patch
doubling project.
CAO/Con/ 30/05(1) Earthwork and Blanketing in
formation, construction of
minor bridges & other misc.
works such as signal building,
platform, FOB, OFC Hut,
fencing etc. between
Sahjanwa(excl.) –
Maghar(incl.) section in
connection with patch
doubling of Sahjanwa (excl.)
to Munderwa section
W/Con/362/II/667/W-
3(1), dt.06.02.06
CAO/Con/GKP/871
dt. 21.02.08
Rs.67166749/-
05.8.07 31.5.09 - - In progress.
186 -do- CAO/Con/ 30/05(2) Earthwork and Blanketing in
formation, construction of
minor bridges & other misc.
works such as signal building,
platform, FOB, OFC Hut,
fencing etc. between
Maghar(excl.) –
Khalilabad(incl.) section in
connection with patch
doubling of Sahjanwa (excl.)
to Munderwa section
W/Con/362/II/667/W-
3(2), 24.03.06
CAO/Con/GKP/896
dt. 21.06.09
Rs.57219702/-
23.9.07 30.6.09 - - In progress.
187 -do- CAO/Con/ 29/05(2) Earthwork and Blanketing in
formation, construction of
minor bridges & other misc.
works such as signal building,
platform, FOB, OFC Hut,
fencing etc. between
Chureb(excl.) –
Munderwa(incl.) section in
connection with patch
doubling of Sahjanwa (excl.)
to Munderwa section
W/Con/362/II/667/W-
3(2), 24.02.06
CAO/Con/GKP/905
dt. 25.7.06
Rs.61675653/-
23.8.07 31.12.09 - - In progress.
188 -do- CAO/Con/ 30/05(3) Earthwork and Blanketing in
formation, construction of
minor bridges & other misc.
works such as signal building,
platform, FOB, OFC Hut,
fencing etc. between
Khalilabad(excl.) –
Chureb(incl.) section in
connection with patch
doubling of Sahjanwa (excl.)
to Munderwa section
W/Con/362/II/667/W-
3(3),24.02.06
CAO/Con/GKP/906
dt. 25.7.06
Rs.50470493/-
23.8.07 30.9.09 - - In progress.
189 -do- CAO/Con/ 9/06 Construction of Br. no. 200
(10x12.20m PSC Girder) on
well foundation between
Sahjanwa - Maghar stations,
Br. no. 236(2x4.57m PSC
slab) on pile foundation and
Br. no. 238 (2x30.50m
W/Con/362/II/812/W-3,
05.8.06
CAO/Con/GKP/920
dt. 12.10.06
Rs.51639857/-
04.02.08 31.3.09 - - In progress.
Girder) on well foundation
between Chureb - Munderwa
stations in connection with
patch doubling work between
Sahjanwa (exc.) - Munderwa
(incl.) section
190 -do- CAO/Con/ 01/09(1) Widening, regrading, re-
surfacing of approach roads
of various level crossing as
per IRPWM, erecting rail
fencing, casting and erection
of various type of boards and
other misc. works between
Sahajanwa- Khalilabad
section in connection with
patch doubling of Sahajanwa-
Munderwa project
W/Con/247/BG/G/
Calling of tender,
24.03.09
Dy.CE/Con/G./GKP/
08, 08.09.09
Rs.5696505/-
23.7.09 31.10.09 - - In progress.
191 -do- CAO/Con/ 48/07 Linking of BG track manually
including slewing &
dismantling B.G. track
wherever required, carting
and stacking of released
materials, spreading of
ballast, transportation of 52
Kg/90R SH/New Rails, PSC
sleepers, 60 Kg from sleeper
factory or any other Railway
stations, P.Way materials etc.
from different places to
various stations/places and
linking level crossing, bridge
etc. between
Sahjanwa(excl.)-Munderwa
(incl.) Km.522/9-10 to
Km.554/12-13 in connection
with Sahjanwa - Munderwa
patch doubling project
W/Con/362/II/809/03
(7) 06.09.07
CAO/Con/GKP/1029
dt. 18.01.08
Rs.27790852/-
05.01.08 31.03.10 - - In progress.
192 -do- CAO/Con/ 66/07(3) Manufacturing, supplying and
stacking of 50mm nominal
size machine crushed stone
ballast as per R.D.S.O.'s
specification of June/04 with
up to date correction slips
from private quarry in
DALA/BILLI range to SWA
- MND section along the cess
in Rly land as per direction of
site Engineer in connection
with patch doubling of
SWA(excl.) - MND(incl.)
section in Lucknow Division
of N.E.Railway.
W/Con/362/II/888/ W-3
(1) dt. 07.02.08
CAO/Con/GKP/1066
dt. 28.3.08
Rs.31350000/-
06.08.08 30.6.09 - - In progress.
193 -do- CAO/Con/ 02/09(1) Maintenance of newly laid
BG track - main line, loop
lines and points and crossing
between Sahjanwa and
Khalilabad stations of
Sahjanwa - Munderwa patch
W/Con/247/04/G/
Invitation of open
tender 22.04.09
W/Con/247/BG/G/In
vi.tender 22.04.09
Rs.1999415-
22.10.09 - - - Work to be
started after
linking
work.
doubling project.
194 -do- CAO/Con/ 78/08 Supplying, laying and fixing
of 100mm thick stone block
(from Chunar or near by area)
of approved size and shape
etc. over 50mm thick local
sand layer on 200mm thick
previously laid WBM at Rake
handling platform of
Khalilabad station in
connection with patch
doubling work of Sahjanwa –
Munderwa section
W/Con/362/II/ 1003/
W-3 dt. 5.01.09
Dy.CE/Con/G./GKP/
01, 07.02.09
Rs.4975515/-
14.03.09 20.10.09 - - In progress.
195 -do- CAO/Con/ 46/08 Hiring of 01 no. road vehicle
Tata Sumo/S Marshal/ Bolero
for Dy.CE/Con/General/
Gorakhpur for inspection of
various ongoing works.
W/Con/362/II/975/W-3,
dt.29.8.08
CAO/Con/GKP/1113
dt. 20.11.08
Rs.315240/-
28.8.09 30.11.09 - - In progress.
196 -do- Loading, unloading and
transportation of 52 Kg/90R
(new/S.H. rails), P.Way
material, P.S.C. sleepers 60
Kg from sleeper factory /
various places by road
vehicles/trailer & other misc.
works etc. in Sahjanwa (excl.)
to Khalilabad (incl.) section
under the jurisdiction of
Dy.CE/Con/Gen/GKP in
connection with SWA -
MND patch doubling project
CAO/Con/GKP/997
dt. 20.09.07
Rs. 3737408/-
Under
preparatio
n
31.10.09 Final
variation
under
vetting.
197 -do- Loading, unloading of 52
Kg/90R (new/S.H. rails),
P.Way material, P.S.C.
sleepers 60 Kg from sleeper
factory / various places by
road vehicles/trailer & other
misc. works etc. in
Khalilabad (excl.) to
Munderwa (incl.) section
under the jurisdiction of
Dy.CE/Con/Gen/GKP in
connection with SWA -
MND patch doubling project
CAO/Con/GKP/1027
dt.14.01.08
Rs.3393105/-
- 31.10.09 Final bill is
under
process.
198 -do- Construction of new skew
canal bridge no. 235A
(1x3.50m RCC box) on
proposed alignment for
doubling at Km. 550/2-4
between Chureb and
Munderwa stations
17.06.09. Dy.CE/Con/G/GKP/
07 dt. 17.6.09.
Rs.1130344/-
23.07.09. 15.9.09 - - Work is in
progress.
199 -do- CAO/Con/ 7/09(1) Hiring of 01 No. road vehicle
Tata Sumo/Marshal/Bolero
for AXEN/Con/ GKP for
inspection of various ongoing
works (SWA-MND patch
doubling project) under
Dy.CE/Con/Gen/GKP.
W/Con/247/BG/G/ dt.
24.4.09
Dy.CE/Con/G/GKP/
06 dt. 28.05.09
Rs.285292/-
23.04.10 Work is in
progress.
200 -do- CAO/Con/ 30/09(3) Providing CC M-15 (1:2:4)
flooring with vacuum
dewatering in fresh concrete
work on island passenger
platform at Chureb in
connection with Sahjanwa -
Munderwa patch doubling
work.
W/Con/247/BG/G/
Tender/SWA-MND/ 02
dt. 20.08.09
-
Rs. 1574956.5
20.10.09 - - - Work is in
progress.
201 BNY - GD section of
GKP-GD (loop)
Gauge Conversion
project.
CAO/Con/ 84/08/(5) Hiring of road vehicle Tata
Sumo/Jeep for official use of
XEN/Con/Balrampur under
Dy.CE/Con./Gen./GKP.
W/Con/362/II/1009/ W-
3(5) dt. 04.03.09
CA no.
DY.CE/CON/Gen./G
KP/05
dt. 21.05.2009.
Rs.442497/-
2.09.10 - - - In progress.
202 -do- CAO/Con/ 30/03(1) Construction of well
foundations and substructure
of Bridge no. 103 (3x12.2m
Composit Girder) and well
foundations, substructure and
PSC superstructure of Bridge
no. 104 (9x12.2m ) and 104A
(5x12.2m ) on permanent
diversions between
Pachperwa and Gainsari
stations in connection with
Gauge Conversion of
Gorakhpur-Gonda (loop)
project
W/Con/362/II/570/ W-
3(1) dt. 20.11.2003
CAO/Con/GKP/718,
dt-29.12.2003
Rs.58162825/-
19.8.05 30.6.07 Under
preparatio
n.
Oct./09 Final
variation is
under
vetting.
203 -do- CAO/Con/
85/2007(1)
Rebuilding of major bridge
no. 107(7x6.10m girder) by
(7x6.10m PSC slab) on pile
foundation of permanent
diversion and minor Bridge
no. 106(1x3.05m RCC box)
coming on permanent
diversion of Br. no. 107
between Gainsari – Tulsipur
in Barhni – Gonda section of
Gorakhpur – Gonda (loop)
Gauge conversion project of
Lucknow Division
W/Con/ 362/ II/ 933/
W-3(1) dt. 23.01.08
CAO/Con/GKP/1056
dt- 18.3.08.
Rs.22106955/-
22.05.09 - Under
preparatio
n.
Nov./09 Final
measurement
is progress.
204 -do- CAO/Con/ 05/08(5) Construction of bridges on
permanent diversions
including earthwork and
blanketing for Br. no. 111
(8x6.10m PSC slab), Br. no.
130 (3x6.10m PSC slab) &
Br. no. 132 (4x6.10m PSC
slab) on pile foundations, Br.
no. 111A (1x1.00m RCC
box), 111B(1x1.00m RCC
box), Br. no. 112(1x2.00m
RCC box), Br.no.
121(1x1.00m RCC box),
Br.no. 123 (1x1.00m RCC
box), Br.no.126 (1x1.00m
RCC box), Br. no. 127
(1x3.66m RCC box), Br. no.
129 (1x1.00m RCC box) and
W/Con/ 362/ II/947/ W-
3(5) 15.05.08
CAO/Con/GKP/1088
dt. 19.6.2008.
81204071/-
14.11.09 - - - In progress.
Br. no. 131 (4x6.10m PSC
slab) on open foundation
between Barhni and Kawapur
stations in Barhni - Gonda
section of GKP - GD (loop)
gauge conversion project.
205 -do- CAO/Con/ 37/ 2008
(3)
Construction of Br. no. 140
(3x12.20m PSC girder),
Br.no. 145(2x12.20m PSC
girder), Br.no. 146 (4x12.20m
PSC girder), Br.
no.148(4x12.20m PSC girder)
on well foundations and Br.
no. 138B (1x1.00m RCC
box), Br. no. 141 (1x6.10m
RCC box) and Br. no. 144A
(1x1.00m RCC box) between
Kawapur and Gainjahwa
stations in Barhni - Gonda
section of GKP - GD (loop)
gauge conversion project.
W/Con/362/II/972/ W-
3(3) dt. 10.10.08
CAO/Con/GKP/1118
dt. 21.11.08.
151495351/-
09.04.10 - - - In progress.
206 -do- CAO/Con/ 42/2008
(2)
Construction of Br.
No.162(5x12.20m PSC
girder) on well foundation,
Br. No. 157(7x6.10m PSC
slab), Br. No. 167(6x6.10m
PSC slab) on pile foundation,
Br. No. 153 (5x6.10m PSC
slab) on open foundation and
Br. No. 158(1x3.66m RCC
box) between Gainjahwa and
Gonda stations, construction
of retaining wall of the bridge
approach at Bridge No. 107,
in Barhni - Gonda section of
Gorakhpur - Gonda (loop)
gauge conversion project
W/Con/362/II/972/ W-
3(2) dt. 10.10.08
CAO/Con/GKP/1119
dt. 25.11.08
Rs.141090289/-
09.04.10 - - - In progress.
207 -do- CAO/Con/ 12/08(2) Remaining earthwork and
blanketing in formation on
permanent diversion of Br.no.
103, 104 & 104A between
Pachperwa & Gainsari
stations in Barhni - Gonda
section of Gorakhpur - Gonda
(loop) Gauge Conversion
Project.
W/Con/362/II/952/W-3
(2) dt. 17.06.08
CAO/Con/GKP/
1120 dt. 15.12.08
Rs.24493190/-
16.03.09 30.6.09 - - In progress.
208 -do- CAO/Con/ 40/2004 Construction of foundation &
substructure of Br. no.
80(9x12.20m) at Km. 115/11-
116/0 between Barhni -
Pachpherwa on well
foundation and construction
fo foundation substructure
super structure with PSC
girder of Br. no.
122(5x12.20m PSC girder) at
Km. 149/9-10 between
Gainsari - Tulsipur and Br.
W/Con/362/II/636/W-3
dt. 20.10.04
CAO/Con/GKP/809
dt-13.01.05/24.03.08
Rs.96428745/-
19.04.06 31.12.08 - Nov./09 Final
measurement
is in
progress.
no. 128(5x12.20m PSC
girder) at Km. 152/14-15
between Tulsipur - Kawapur
including construction of Br.
no. 77 (3x6.10m PSC slab),
Br. no. 78 (3x6.10m PSC
slab), Br.no. 79(2x6.10m
slab) and Br. no. 81(1x3.66m
RCC Box) between Barhi -
Pachpherwa coming on
permanent diversion of bridge
no. 80 in connection with
Gauge Conversion of
Gorakhpur - Gonda (loop).
209 -do- CAO/Con/ 82/2008
(1)
Construction of platforms,
signal buildings, P.P. shelter,
gate lodges and earthwork in
yards, rebuilding of minor
bridges and other
miscellaneous works between
Barhni (excluding) to
Gainsari(including) stations
in connection with gauge
conversion of Gorakhpur-
Gonda (loop) section of
Lucknow Division.
W/Con/362/II/1007/W-
3 (1) dt. 09.03.09
-
Rs.57621731/-
09.09.10 - - - In progress.
210 -do- CAO/Con/ 82/ 2008
(2)
Construction of platforms,
signal buildings, F.O.B., P.P.
shelter, gate lodges and
earthwork in yards, rebuilding
of minor bridges and other
miscellaneous works between
Gainsari (excluding) to
Tulsipur (including) stations
in connection with gauge
conversion of Gorakhpur -
Gonda (loop) section of
Lucknow Division.
W/Con/362/II/1007/ W-
3 (2) dt. 02.03.09
-
Rs.41381675/-
02.09.10 - - - In progress.
211 -do- CAO/Con/ 61/2008
(4)
Provision of office
accommodation XEN/Con.
SE/P.Way/Con and
SE/W/Con at Balrampur in
connection with Gauge
Conversion work of Barhni -
Gonda section of Lucknow
Division of N.E. Railway.
W/Con/362/II/987/ W-3
(4) dt. 15.12.08
Dy.CE/Con/GKP/03
dated 08.05.09
Rs.1981680/-
14.03.09 31.10.09 - - In progress.
212 -do- CAO/Con/ 82/2008
(4)
Construction of platforms,
gate lodges, signal buildings,
earthwork inyards and other
miscellaneous works such as
hand pump, low cost P.P.
shelter etc. between
Balrampur (excluding) to
Gonda (excl.) stations in
connection with gauge
conversion of Gorakhpur -
Gonda (loop) section in
Lucknow Division.
W/Con/362/II/1007/ W-
3 (4) dt. 23.03.09
Dy.CE/Con/GKP/04
dated 18.05.09
Rs.54452459/-
22.09.10 - - - In progress.
213 -do- CAO/Con/ 40/2008
(3)
Hiring of 01 no. road vehicle
Tata Sumo/marshal/Bolero at
Gonda for inspection of
various ongoing works
(Gauge Conversion of
Barhni-Gonda & Bonda-
Bahraich section under
Dy.CE/Con/Gen/Gorakhpur.
W/Con/362/II/902/ W-3
(3) dt. 31.10.08
Dy.CE/Con/GKP/02
dated 01.05.09
Rs.330400/-
30.10.09 - - - In progress.
214 -do- CAO/Con/ 13/2009
(1)
Manufacturing, supplying and
stacking of 50mm nominal
size machine crushed stone
track ballast from
Dala/Billi/Jhansi/ Maihar
sources conforming to
R.D.S.O.’s specification of
June/04 with up to date
correction slips in Barhni
(excluding) to Gainsari
(including) including depot
supply at Gainsiri of Gonda -
Barhni section of Lucknow
Division of N.E. Railway in
connection with Gorakhpur -
Gonda (loop) Gauge
Conversion project including
loading of ballast in MG
hoppers & unloading ballast
in the section.
W/Con/362/II/1024/ W-
3 (1) dt. 15.09.09
-
Rs.137290000/-
15.03.11 - - - Yet to be
started.
215 -do- CAO/Con/ 13/2009
(2)
Manufacturing, supplying and
stacking of 50mm nominal
size machine crushed stone
track ballast from
Dala/Billi/Jhansi/ Maihar
sources conforming to
R.D.S.O.’s specification of
June/04 with up to date
correction slips in Gainsiri
(excluding) to Balrampur
(excluding) including depot
supply at Tulsipur of Gonda -
Barhni section of Lucknow
Division of N.E. Railway in
connection with Gorakhpur -
Gonda (loop) Gauge
Conversion project including
loading of ballast in MG
hoppers & unloading ballast
in the section.
W/Con/362/II/1024/ W-
3 (2) dt. 10.09.10
-
Rs.135630000/-
10.03.12 - - - Yet to be
started.
216 GD - BRK Gauge
Conversion project.
CAO/Con/ 99/07/(1) Construction of platforms,
gate lodges, signal buildings,
F.O.B., earthwork in yards,
rebuilding of minor bridges
and other miscellaneous
works between Gonda to
Bahraich (incl.) stations in
connection with gauge
conversion of Gonda -
Bahraich section in Lucknow
W/Con/362/II/914/ W-
3(5) dt. 30.07.08
CAO/Con/GKP/1127
dt. 30.01.09
Rs.83539591/-
29.01.10 - - - In progress.
Division.
217 -do- CAO/Con/ 67/07/(5) Construction of bridge no. 9
(2x12.20m PSC Girder)
between Gangadham –
Bangai and bridge no. 27
(3x12.20m PSC Girder)
between Payagpur –
Yogenderdham on well
foundation on permanent
diversion in connection
Gauge Conversion work of
Gonda - Bahraich section of
Lucknow division
W/Con/362/II/922/ W-
3(5) dt. 26.02.08
CAO/Con/GKP/1102
dt. 25.08.08
Rs.40942402/-
25.05.09 25.12.09 - - In progress.
218 -do- CAO/Con/ 13/09/(5) Manufacturing, supplying and
stacking of 50mm nominal
size machine crushed stone
track ballast from
Dala/Billi/Jhansi/ Maihar
sources conforming to
R.D.S.O.’s specification of
June/04 with up to date
correction slips in Gonda
(excl.) to Payagpur including
yard @ 3500 cum in GDAM,
BGAN, BEU & PDR in
connection with Gonda-
Bahraich Gauge Conversion
project
W/Con/362/II/1024/ W-
3(5) dt. 03.8.09
-
Rs.99600000/-
03.02.11 - - - Yet to be
started.
Dy. CE/Con/HQ
219 BTT-BALR CAO/Con/14/07(1) Earth work and blanketing in
formation,construction of
minor bridges and oother
misc.work etc. bet. BTT-
BALR
W/con/362/II/880/W-3
(1) dt. 11.7.07
CAO/Con/GKP/1034
dt.30.1.08
Rs. 161369180/-
11.10.09 - - - Work in
progress
220 - CAO/Con/52/07(I) Construction of major bridge
no.133 at Km 456/12-13 on
well foundation between
Deoria Sadr and Baitalpur etc.
W/Con/362/II/880/W-3
(2) dt.11.10.2007
CAO/Con/GKP/1018
dt. 18.12.07
Rs. 19105028/-
08.9.08 31.7.09 - - -
221 BTT-ZRDE CAO/Con/32/07(3) Earth work and blanketing in
formation, construction of
minor bridges and other misc
work etc.
W/Con/362/II/879/W-3
(1) dt.20.7.07
CAO/Con/GKP/1067
dt. 27/28.3.08
Rs. 108350615/-
29.9.08 31.8.09 - - -
222 - CAO/Con/94/08(3) Linking of B.G.
Track,Transportation of
P.Way material & other misc
work bet. ZRDE-Bankatta
W/Con/247/HQ/02
Rs. 161369180/-
Dy.CE/Con/HQ/GKP
/05 dt. 21.7.09
Rs. 31425558.99
19.4.2010 - - - Work in
progress
223 -
CAO/Con/89/08(5) Construction of rake handling
platform at Mairwa station
W/Con/247/HQ/01 dt
18/19.2.09
Dy.CE/Con/HQ/GKP
/04 dt. 12.6.09
Rs. 26159100/-
18.8.09 - - - -
224 -
CAO/Con/48/06 Cnstruction of major bridges
bet. BTT-ZRDE.
W/Con/362/II/817/W-3
dt.17.2.07
CAO/Con/GKP/1016
dt.10.12.07
Rs. 80683107.70
11.8.08 31.5.09 - 15.10.09 Work
completed
225 - CAO/Con/34/08(3) Extension of New Office
building of CAO/Con Office
and provision of
Cycle/Scooter stand at
W/Con/362/II/964/W-3
(3) dt.02.9.08
Dy.CE/Con/HQ/CA-1
Rs. 4259450/-
01.1.2009 31.8.09 - - -
Gorakhpur.
226 SRSF (CPR-ALY)
CAO/Con/93/07(3) Linking of B.G.Track on
permanent diversion for
major bridge of CPR-ALY
section.
W/Con/362/II/926/W-3
(3) dt. 25.1.08
CAO/Con/GKP/1059
dt. 26.3.08
Rs. 9901650/-
24.4.08 30.4.09 - 15.10.09 Work
completed
227 SRSF(BTT-ARJ) CAO/Con/39/05 Linking of B.G. track on
permanent diversion for
major bridges in Indara-Mau-
Aurihar section etc.
W/Con/362/II/782//W-3
dt. 26.12.05
CAO/Con/GKP/878
dt. 06.3.06
Rs. 21674610/-
25.10.06 30.4.08 - 15.10.09 Work
completed
Dy
CE/Con/LKO
228 CAO/Con/52/05 (1) Raising of platform No. 1 bet
CPA-FBD
W/Con/II/794/W-3
(1)/1170 dt. 05.04.06
CAO/Con/GKP/898
dt. 22.06.06
Rs.11409548.10
04.08.06 10.03.08 Under A/c
vetting
Oct. -09
229
CPA-FBD (G.C.)
CAO/Con/87/08 (2) Carting/shorting/ stacking of
PSC sleeper Rails and other
miscellaneous P-Way fitting
in between CPA-FBD section
at different places at SE/Con
P-Way store in connection
with CPA-FBD gauge
conversion project.
W/Con/II/1012/W-3 (2)
dt. 22.01.09
Dy. CE/Con/LJN/18
dt. 24.06.09
Rs.823570/-
21.04.09 31.03.10 In
progress
230 CAO/Con/04/06 (5) Unloading of stone ballast
from MG wagon and carting
of the same bet. MUR GD
W/Con/II/805/W-3
(1)/2507 dt. 14/17.07.06
CAO/Con/GKP/988
dt. 12.07.07
Rs.5586000/-
13.05.07 31.12.07 Final bill
under
preparatio
n
Dec.-09
231
MUR – GD
CAO/Con/57/08 Linking of Bg track manually
including dismantling BG
track wherever required
carting and stacking P. Way
materials etc. at GD yard.
W/Con/II/981/W-3 (4)
dt. 06.01.09
Dy. CE/Con/LJN/16
dt. 02.04.09
Rs.25072793.40
05.07.09 31.03.10 In
progress
132 CAO/Con/31/05 (5) Construction of passenger
platform signal building etc.
W/Con/II/668/W-3 (5)
dt. 30.01.06
CAO/Con/GKP/885
dt. 25.04.06
Rs.6954265/-
29.11.06 28.02.09 Measurem
ent is
being
recorded
Dec.-09
233 E/Work in filling and
supplying blanketing material
and construction Minor
bridges. Bet. BV (incl.) –
Babhanjotia (incl.) Km. 598
to 608.
CAO/Con/GKP/873
dt. 24.02.06
Rs.43294719.56
11.11.07 31.12.08 Variation
sanctione
d
Oct. -09
234 CAO/Con/31/05 (3) E/Work in filling and
supplying blanketing material
and construction Minor
bridges. Bet. MSW (excl.) –
MUR (incl.) Km. 618/0 to
628/0.
W/Con/II/668/W-3 (3)
dt. 09.05.06
CAO/Con/GKP/910
dt. 07.08.06
Rs. 48618560/-
08.03.07 30.06.08 Final bill
under
preparatio
n
Dec.-09
235 CAO/Con/36/06 (2) SKV welding of 52 Kg.
New/SH rail on GD – MUR
and MUR - BV
W/Con/II/839/W-3 (2)
dt. 22.12.06
CAO/Con/GKP/980
dt. 15.05.07
Rs. 9091220/-/-
21.08.07 31.10.09 In
progress
236
MUR - BVN
CAO/Con/33/07 (1) Linking of BG track
including dismantling of BG
track bet. BV (incl) – MSN
(excl.) km. 598/0 to 614/0.
W/Con/II/879/W-3 (1)
dt. 02.08.07
CAO/Con/GKP/1011
dt. 21.11.07
Rs. 14409636.25
01.02.08 15.06.09 Final bill
under
preparatio
n
Dec.-09
237 CAO/Con/33/07 (2) Linking of BG track
including dismantling of BG
track bet. MSN (incl) to MUR
(excl.) km. 614/0 to 628/0.
W/Con/II/879/W-3 (2)
dt. 02.08.07
CAO/Con/GKP/1013
dt. 04.12.07
Rs. 13779901.25
02.12.07 31.03.09 In
progress
238 CAO/Con/38/07 Construction of duty room,
gateman and other misc.
works bet MUR –BV.
W/Con/II/900/W-3
(1)/3627
dt. 01.11.07
CAO/Con/GKP/1081
dt. 05.05.08
Rs. 2472085/-
30.04.08 31.03.09 Final bill
under
preparatio
n
March -
2010
239 CAO/Con/27/07 (4) Carrying out soil exploration
and investigation under
jurisdiction of Dy CE/Con/
LJN.
W/Con/II/891/W-3 (4)
dt. 07.08.07
CAO/Con/GKP/1094
dt. 16.07.08
Rs. 317176/-
06.02.08
30.11.08 Final bill
under
preparatio
n
Dec.-09
240 Construction of PSC girders
in superstructure of Br. O.
327 bet. LKNR – MSW.
W/Con/II/928/W-3
dt. 31.12.07
CAO/Con/GKP/1036
dt. 03/04.01.08
Rs.9912365/-
30.04.08 28.02.09 Final bill
under
preparatio
n
Dec.-09
241 CAO/Con/50/08 (3) Misc. leftover work in
Mankapur – Babhnan section
such as electrical sub station
building etc.
W/Con/II/980/W-3 (3)
dt. 23.09.08
Dy. CE/Con/LJN/14
dt. 25.02.09
Rs.7153205/-
22.11.08 31.10.09 In
progress
242 CAO/Con/51/08 (4) Linking of BG Track
manually including
dismantling BG track
wherever required, carting
and stacking P. way materials
etc. in connection with MUR
-BVN doubling.
W/Con/II/980/W-3 (4)
dt. 23.09.08
Dy. CE/Con/LJN/10
dt. 25.02.09
Rs.6260399.50
14.11.08 31.03.10 In
progress
243 Carting /collection of PSC
sleeper, Rails, miscellaneous,
P Way fitting and other
ancillary/left over works at
different stations/locations in
Dy. CE/Con/LJNs
Jurisdiction.
W/247/LJN/07
dt 08.06.09
Dy. CE/Con/LJN/19
dt. 30.06.09
Rs.1615886.06
07.10.09 - In
progress
244 CAO/Con/85/08 (1) Hiring of 01 (one) no. Road
vehicle Tata Sumo/Bolero or
Similar Road vehicle
in connection with patch
doubling.
W/Con/II/1010/W-3 (1)
dt. 21/22.01.09
Rs.288800/-
21.01.10 - In
progress
245 CAO/Con/20/07 (4) Construction of approach
embankment for new bridges
near existing bridge no. 391
bet. GHT – CKG.
W/Con/II/886/W-3
dt. 11.09.07
CAO/Con/GKP/1014
dt. 10.12.07
Rs.52623500/-
10.09.08 31.03.10 In
progress
246
Ghaghraghat –
Chaukaghat doubling
CAO/Con/41/07 Construction of new bridges
near existing bridge no. 391
bet. GHT – CKG
W/Con/II/901/W-3/310
dt. 31.01.08
CAO/Con/GKP/1071
dt. 31.03.08
Rs.296958500/-
03.08.09 31.01.10 In
progress
247 CAO/Con/66/07 (1) Misc. Work for freight
examination Pit & other
works at GD.
W/Con/II/867/W-3
(2)/4029
dt. 19.11.07
CAO/Con/GKP/1060
dt. 26.03.08
Rs.4662539/-
13.03.08 31.08.09 Final bill
under
preparatio
n
Dec.-09
248
GD Yard
CAO/Con/58/07 (2) Linking of BG/MG track and
other Misc. works in GD
Yard.
W/Con/II/905/W-3 (3)
dt. 14.11.07
CAO/Con/GKP/1021
dt. 31.12.07
Rs.1312990.70
13.01.08 30.06.08 In
progress
249 CAO/Con/05/07 (1) Construction of signal
building at Bindaura &
Jahngirabad stations ad
construction of Cap office at
Gonda.
W/Con/II/874/W-3
(1)/2189
dt. 26.09.07
CAO/Con/GKP/1007
dt. 14.11.07
Rs.4530152/-
28.10.07 31.10.08 Final bill
under
preparatio
n
Dec.-09
250 CAO/Con/64/07 (1) Earthwork filling – supplying
blanketing materials and
Const. of Minor bridges bet.
BBK – Rafinagar (Km 730/0)
W/Con/II/920/W-3
(1)/4149
dt. 14.12.07
CAO/Con/GKP/1043
Dt 26.02.08
Rs.76570895/-
13.03.09 31.12.09 In
progress
251 CAO/Con/88/07 (1) Earthwork filling, supplying
blanketing materials and
Construction of Minor
bridges bet. Rafinagar (excl)
– BUW Km 730/0 Up to
BUW (incl).
W/Con/II/920/W-3
(2)/6789
dt. 25.02.08
CAO/Con/GKP/1084
dt. 22.05.8
Rs.66411625/-
24.05.09 31.12.09 In
progress
252 CAO/Con/76/07 (5) Construction of gate lodges,
quarters and other misc.
works in connection with
patch doubling work in
Barabanki-Burhwal section
from Barabanki (incl.) to
Burhwal (incl.).
W/Con/II/917/W-3 (5)
dt. 31.03.08
CAO/Con/GKP/1089
dt. 19.06.08
Rs.13828758.22
30.12.08 15.11.09 In
progress
253 CAO/Con/93/08 Construction of (i)Bridge
No.406 (10x9.15M) on well
foundation with PSC slab at
Km.730/5-6 .(ii) Br. No-396
(5x4.57)at Km.722/0-1with
RCC box, Br no.403
(5x6.1m) & 404(5x6.1m) on
well foundation with open
web steel girder at Km.728/1-
3 & (iii) left over works of
Br. no. 327 in MUR – BNV
Section.
W/Con/II/5/W-3
dt. 10.02.09
Dy. CE/Con/LJN/15
dt. 26.03.09
Rs.49040587.68
09.02.10 - In
progress
254 CAO/Con/19/09 (2) Linking of B.G. track
Manually Km. 732/0 up to
BUW (incl) including yard.
W/Con/II//W-3/19/09
(2)
dt. 10.08.09
Rs.17684261.11
09.04.10 - In
progress
255 CAO/Con/19/09 (1) Linking of B.G. track
Manually Km. 732/0 up to
BBK (incl) including yard.
W/Con/II//W-3/19/09
(1)
dt. 10.08.09
Rs.18374430.05
09.04.10 - In
progress
256
BBK-BUW
CAO/Con/85/08 (2) Hiring of 02 (two) nos. Road
vehicle Tata Sumo/Bolero or
Similar Road vehicle in
connection with patch
doubling of GHT- CKG &
BBK-BUW project.
W/Con/II/1010/W-3
(2)/92
dt. 21/29.01.09
Dy. CE/Con/LJN/23
dt. 01.08.09
Rs.674780/-
21.01.10 - In
progress
257 Construction of 3rd running
line, Br. No. 76 & 77 at
Saraiya and Mahmudabad
bet. BUW – STP Section.
CAO/Con/GKP/981
dt. 15.05.07
Rs.4940615.85
25.06.07 15.08.08 Final bill
under
preparatio
n
Dec.-09
258
IIIrd running line on
BUW - STP
CAO/Con/33/06 (2) Construction of 3rd running
line at Tehsil Fatehpur &
Sundiyamau bet BUW – STP
sec.
W/Con/II/826/W-3 (2)
dt. 23.09.08
CAO/Con/GKP/970
dt. 26.03.07
Rs.4908581.15
06.06.07 31.12.08 Final bill
under
preparatio
n
Dec.-09
259 CAO/Con/88/07 (2) Construction of signal
building, linking etc. at
SDAM, TFS, MMB on
BUW-STP section
W/Con/II/934/W-3 (2)
dt. 14.02.08
CAO/Con/GKP/1055
dt. 18.03.08
Orig. Rs. 4539903/-
Rev. Rs. 8514620/-
13.08.08 14.09.09 Final bill
under
preparatio
n
Dec.-09
260 CAO/Con/88/07 (1) Construction of signal
building, linking etc. at
Saraiya, Parsandi, Biswan on
BUW – STP section.
W/Con/II/934/674/W-3
(1)
dt. 25.02.08
CAO/Con/GKP/1130
dt. 31.03.09
Rs.4868379/-
24.08.08 31.12.09 In
progress
261 CAO/Con/28/08 (2) Alumino Thermit welding of
52 Kg/90R rails in SKV
Process with contractor’s
portion and other consumable
as approved by RDSO etc. on
Cess/in situ in connection
with traffic facilities work
bet. STP- BUW section &
other misc. project running
under Dy. CE/Con/LJN of
N.E. Railway.
W/Con/II/902/W-3
(2)/1429
dt. 28.07/25.08.08
Dy. CE/Con/LJN/11
dt. 01.08.09
Rs.3938550/-
04.05.09 31.12.09 In
progress
262 CAO/Con/27/08 (3) Manufacturing, supplying,
stacking & spreading of
50mm nominal size machine
crushed stone ballast as per
RDSO’s specification of
June-2004 with up to date
correction slips from private
quarry to Sudhiamau, Tehsil
Fatehpur, Mahmudabad,
Saraiya, Parsendi & Biswan
stations in Sitapur-Burhwal
section.
W/Con/II/959/W-3 (3)
dt. 30.07.08
Dy. CE/Con/LJN/17
dt. 06.04.09
Rs.7685000/-
29.09.08 31.12.09 In
progress
263 LJN Yard CAO/Con/17/08 Construction of high level
platform, washing apron,
extension of minor bridges,
track linking and other misc.
work in connection with yard
remodeling of Lucknow Jn.
phase-II in Lucknow division
of N.E.Railway.
W/Con/II/920/W-3 (3)
dt. 07.08.09
Dy. CE/Con/LJN/12
dt. 19.01.09
Rs.25757514/-
07.02.09 31.12.09 In
progress
Dy. CE/Con/NW
264 DMG-SWA CAO/C/18/ 2005(5) Earthwork from Ch.no.65.25
to 111.78 including Jagatbela
Yard and blanketing from Ch.
No.52.48 to 111.78 etc.
W/ Con/ 362/ II/ 664/
W-3(1) dt. 26.10.05
CAO/Con/GKP /864
dt.12.01.08
Rs.34269477/-
18.11.05 31.3.09 under
process
31.10.09
265 CAO/C/18/ 2005(2) Earthwork and blanketing
from Ch.111.38 to 176.74
including SWA Yard.
W/ Con/ 362/ II/ 664/
W-3(2) dt. 4.10.05
CAO/Con/GKP /850
dt.13.12.05
Rs.33902798.50
18.11.05. 31.3.09 under
process
31.10.09
266 CAO/C/14/ 2008(2) Manufacturing, supplying &
stacking of 65 mm maximum
size machinecrushed stone
ballast etc. bet. JTB-SWA.
W/ Con/ 362/ II/ 953/
W-3(2) dt. 5.9.08
Dy.CE/Con/NW /04
dt.16.02.09
Rs.24000000/-
2.11.08 30.9.09 Work is in
progress
267 CAO/C/85/ 2007(2) Linking of B.G. Track
between DMG-SWA
W/ Con/ 362/ II/ 876/
W-3(2) dt. 12.02.08
Dy.CE/Con /NW /12
dt.29.6.09
Rs.13560000/-
11.5.08 31.10.09 "
268 CAO/C/67/ 2008(1) Provision of pitching of
boulder bet. DMG-SWA
W/ Con/ 362/ II/ 991/
W-3(1) dt. 05.01.09
Dy.CE/Con /NW /03
dt.16.02.09
Rs.35004750/-
4.5.09 31.3.10 "
269 CAO/C/77/ 2008(1) Const. of platform FOB, P.P.
shelter , earthwork bet. DMG
etc.
-do- 1062/ W-3(1) dt.
14.2.09
Dy.CE/Con /NW /09
dt.11.5.09
Rs.36443200/-
02.03.09 13.8.09 "
270 CAO/C/72/ 2008(1) Linking of B.G. Track
between DMG(ex.)-
SWA(ex.)
W/ Con/ 362/ II/
997/W-3(1) dt. 13.2.09
Dy.CE/C/NW/GKP/1
3 dt.08.09.2009
Rs.11565330/-
12.8.09 31.3.11 "
271 CAO/C/71/ 2008(3) Manufacturing, supplying &
stacking of 65 mm maximum
size machine crushed stone
ballast in Jagatbela Yard.
-do- 996/W-3(3) dt.
26.02.07
Dy.CE/Con /NW /11
dt.11.7.09
Rs.13560000/-
25.6.09 30.9.09 "
272 CAO/C/71/ 2008(2) Manufacturing, supplying &
stacking of 65 mm maximum
size machine crushed stone
ballast in Domingarh Yard.
W/ Con/ 362/ II/
996/W-3(2) dt. 27.03.09
Rs.11725000/- 26.7.09 - "
273 MND-BV CAO/C/29/ 2006(1) Earthwork in formation ,
supplying, laying &
compaction of blanketing
material etc.
'-do- 831/W-3(1) dt.
02.01.07
CAO/Con/GKP/ 953
dt.23.2.07
Rs.19129380/-
20.1.07 31.3.10 "
274 CAO/C/67/ 2007(2) Linking of B.G. track
manually between Bast (ex)
to TH(in.) km.569/6 to 586/0
LOA No. W/Con/
362/II/922/W-3(2)
dt.13.11.07
Rs. 21732442.50 12.3.08 31.5.10 "
275 CAO/C/67/ 2007(3) -do- between Tinich (ex.) to
BV(ex) km.586/0 to 598/14
between MND-BV Section.
'-do- 922/W-3(3) dt.
26.11.07
Dy.CE/Con/ NW/02
dt.16.2.09
Rs.24000000/-
9.4.08 31.10.09 "
276 CAO/C/67/ 2007(1) -do- between Km 554/9-10 to
569/6 between MND-BST
Section.
W/ Con/ 362/II/
924/W-3(1) dt.26.11.07.
Rs.18257397.50 9.4.08 "
277 CAO/C/11/ 2008(2) Manufacturing, supplying and
stacking of 65 mm stone
ballast etc. bet. 561/8-9 to
569/6
'-do- 922/W-3(2) dt.
04.07.08
CAO/Con/GKP/1116
dt.12.11.2008
Rs.15400000/-
25.8.08 31.3.09 Complet
ed
"
278 CAO/C/14/ 2008(4) -do- Km.569/6 to Km.580/6
Basti-Govindnagar -Tinich
'-do- 953/W-3(4) dt.
02.07.0
Dy.CE/Con/ NW/08
dt.01.05.09
Rs.28296000/-
2.1.09 30.9.09 Work in
progress "
279 MND-BV CAO/C/12/ 2009(2) -do- Km.569/6 to Km.591/0
Basti (ex)-Gaur (excl.)
W/Con/315/NW/
CAO/Con/12/09(2)
dt.29.8.09
Dy.CE/Con/ NW/14
dt.22.09.09
Rs.18650000/-
28.2.10 Work is in
progress.
280 CAO/C/04/ 2008(5) -do- Km.554/8-9 to
Km.561/8-9 bet. Munderwa-
Orwara.
W/ C/ 362/II/ 945/W-
3(5) dt.12.06.08
Dy.CE/Con/ NW/07
dt.20.3.09
Rs.18723690/-
18.8.09 31.10.09 "
281 CAO/C/04/ 2008(3) -do- Km.580/7 to Km.598/14
bet. Govindnagar-Tinich -
Gaur- BV
W/ C/ 362/II/ 943/W-
3(3) dt.21.4.08
Dy.CE/Con/NW/I
dt.09.01.09
Rs.46440000/-
15.7.08 31.12.09 "
282 CAO/C/07/ 2008(2) Construction of platform and
S&T building between ORW-
GAUR.
'-do- 956/W-3(2) CAO/Con/GKP/
1121 dt. 12.12.08
Rs.52271511/-
12.8.08 31.7.09 "
283 CAO/C/74/ 2007 (1) Supplying, laying and fixing
of 80 mm thick inter locking
CC pavers etc. between
DMG-NV.
W/ C/ 362/II/ 925/W-
3(1) dt.20.2.08
Dy.CE/Con/ NW/05
dt.21.02.09
Rs.10080640/-
20.2.09 31.12.09 "
284 CAO/C/06/ 2008 (3) Misc.work repairing of patch
doubling between MND-BV
and BST Rake handling.
-do- 1005/W-3
dt.09.03.09
Dy.CE/Con/ NW/10
dt.08.05.09.
Rs.22496316.73
8/9/2009 - "
285 CAO/C/71/ 2008 (1) Provision of Boulder Drain
by pitching & filling of
boulder on the approach of
Br. No.281
-do- 996/W-3 (1)
dt.23.1.09
Dy.CE/Con/ NW/06
dt.03.03.09
Rs.9448000/-
02.02.09 31.03.10 "
286 CAO/C/01/ 2009 (4) Hiring of 1 no. road vehicle
for MND-BV
-do- 5/W-3 dt.24.03.09 -
Rs.281775/-
23.3.10 23.3.10 "
Dy. CE/Con/BSB
287 ARJ-JNU Gauge
Conversion
CAO/Con/38/ 04(1) Rebuilding of minor bridges
& widening of existing of
embankment from MG to BG
standard including earth work
in yard. Construction of
platform, etc. and other
miscellaneous work at
stations between Aunrihar to
Krakat (incl.) in Connection
with gauge conversion of
Aunrihar – Jaunpur section in
Varanasi.
W/Con/362/II/630/W-3
(1) dt. 20.10.04
CAO/Con/GKP/865
Dt. 16.01.06
Rs. 26556025/-
19.01.06 31.10.08 - - -
288 ARJ-JNU Gauge
Conversion
CAO/Con/38/ 04(2) Rebuilding of minor bridges
& widening of existing of
embankment from MG to BG
standard including earth work
in yard. Construction of
platform, etc. and other
miscellaneous work at
stations between Krakat
(excl.) to Jaunpur (excl.) in
connection with gauge
conversion of Aunrihar –
Jaunpur section in Varanasi.
W/Con/362/II/630/W-3
(2) dt. 20.10.04
CAO/Con/GKP/820
Dt. 10.05.05
Rs. 35670298/-
19.01.06 30.04.09 - - -
289 ARJ-JNU Gauge
Conversion
CAO/Con/12/06 Rebuilding of Bridge NO. 17
(3x12.20m) at Km. 27/4-5 on
permanent diversion with
PSC girders and wel
foundation including
blanketing on new
embankment etc. Bet. Dobhi
– Kerakat stations.
W/Con/362/II/814/W-3
dt. 07.11.08
CAO/Con/GKP/994
Dt. 28.08.07
Rs. 16979238/-
06.02.08 31.10.08 - - Work
terminated
290 Extension of washing
pit of manduadih
CAO/Con/27/ 05(1) Manufacturing and erection
of steel covered shed
including construction of
foundation. Examination pit ,
flooring drain and other misc.
work at Manduadih coaching
complex in connection with
Manuduadih – Extension of
sick link shed associated
facilities for maintenance of
A.C. coaches
W/Con/362/II/675/W-3
(1) dt. 12.01.06
CAO/Con/GKP/872
Dt. 22.02.06
Rs. 16822770/-
11.07.06 31.05.09 - - -
291 Construction of OFC
Hut bet Mau -
Shahganj
CAO/Con/41/ 05(2) Construction of S&T building
in connection with provision
of FM to FM Track
circulating & quad cable hut
at all crossing stations in Mau
– Shahganj stations in
Varanasi Division of N.E.
Railway.
W/Con/362/II/788/W-3
(2) dt. 16.03.06
CAO/Con/GKP/948
Dt. 19.01.06
Rs. 3397545/-
14.02.07 31.03.08 Work has
been
completed
& final
bill has
been paid.
- -
292 Construction of OFC
Hut and equipment
room bet ARJ-CPR
CAO/Con/53/ 05 Construction of OFC Hut and
equipment room at all
crossing stations in
W/Con/362/II/799/W-3
dt. 05.04.06
CAO/Con/GKP/948
Dt. 15.06.07
Rs. 4353910/-
03.03.07 29.09.08 Work has
been
completed
- -
connection with provision of
4 quad cable in ARJ – CPR
stations.
contractor
is not
available
for sight
on final
bill.
293 Construction of 3rd
running line bet.
Varanasi – Allahabad
section.
CAO/Con/26/ 06(2) Linking of track & other
misc. in connection with
construction of third running
line at Raja Talab, Kachhawa
Road, Jangiganj and Saidabad
stations.
W/Con/362/II/828/W-3
(2) dt. 22.09.06
CAO/Con/GKP/966
Dt. 20.03.06
Rs. 7700131/-
18.03.07 30.09.07 - - -
294 Indara – Mau Patch
doubling work
CAO/Con/53/ 07(2) Construction of major bridge
no. 72 at Km. 65/14-15
between Indara and Mau
stations in connection with
patch doubling of Indara –
Mau section of Varanasi
Division of N. E. Railway.
W/Con/362/II/913/W-3
(1) dt. 12.11.07
CAO/Con/GKP/1038
Dt. 06.03.08
Rs. 43656576/-
10.01.09 15.11.09 - - -
295 Indara – Mau Patch
doubling work
CAO/Con/67/ 07(4) Earthwork and formation,
construction of minor bridges
and other misc. work such as
signal building, platform,
OFC Hut, fencing etc. bet.
Indara Jn. to Mau Jn.
W/Con/362/II/913/W-3
(1) dt. 13.11.07
CAO/Con/GKP/1040
Dt. 06.03.08
Rs. 44780308/-
11.02.09 31.12.09 - - -
296 ARJ-JNU Gauge
Conversion
CAO/Con/53/ 07(3) Transportation of PSC line
sleeper from sleeper
factory/stations yards to
various location such as level
crossing and station of
Aunrihar – Jaunpur section
including loading into
contractors own
vehicle/Tailor and unloading.
Transportation including
unloading of 90R /52 g
(New/Second Hand) rails
from Railway Wagons and
loading leading unloading
into yards/block sections of
ARJ – JNU section.
W/Con/362/II/913/W-3
(3) dt. 19.12.07
CAO/Con/GKP/1073
Dt. 15.04.08
Rs. 577320/-
18.08.08 30.04.09 - - -
297 ARJ-JNU Gauge
Conversion
CAO/Con/72/ 07(1) Manufacturing supplying &
stacking of machine crushed
track ballast from private
quarry in Dala/Billi range as
per RDSO’s specification of
June-2004 with up to date
correction slips along the
bank between Aunrihar
(including) to Km 15/0 on
ARJ-JNU section of N.E.
Railway.
W/Con/362/II/915/W-3
(1) dt. 07.01.08
CAO/Con/GKP/1074
Dt. 15.04.08
Rs. 14985000/-
06.07.08 31.03.09 Work has
been
completed
& final
bill has
been paid.
- -
298 ARJ-JNU Gauge
Conversion
CAO/Con/56/ 07(2) Manufacturing, supplying &
stacking of Machine crushed
ballast from private quarry in
Dala/Billi range as per
RDSO‘s specification June-
2004 with up to date
W/Con/362/II/915/W-3
(2) dt. 14.01.08
CAO/Con/GKP/1047
Dt. 04.03.08
Rs. 14910000/-
13.07.08 31.05.09 Work has
been
completed
& final
bill has
been paid.
- -
correction slip along the bank
between Km. 15/0 to 30/0
bet. ARJ – LNU section of
N.E. Railway.
299 ARJ-JNU Gauge
Conversion
CAO/Con/56/ 07(3) Manufacturing, supplying &
stacking of Machine crushed
ballast from private quarry in
Dala/Billi range as per RDSO
‘s specification June-2004
with up to date correction slip
along the bank between Km.
30 to 45/0 bet. ARJ – JNU
section of N.E. Railway
W/Con/362/II/915/W-3
(3) dt. 14.01.08
CAO/Con/GKP/1046
Dt. 04.03.08
Rs. 15060000/-
13.07.08 30.09.09 - - -
300 ARJ-JNU Gauge
Conversion
CAO/Con/56/ 07(4) Manufacturing, supplying &
stacking of Machine crushed
ballast from private quarry in
Dala/Billi range as per
RDSO‘s specification June-
2004 with up to date
correction slip along the bank
between 45/0 to Jaunpur bet.
ARJ – JNU section of N.E.
Railway
W/Con/362/II/915/W-3
(4) dt. 14.01.08
CAO/Con/GKP/1072
Dt. 10.04.08
Rs. 15060000/-
13.07.08 15.11.09 - - -
301 Standard – III
interlocking work
bet. Varanasi –
Allahabad City
CAO/Con/37/ 07(2) Construction of signal
buildings and other
miscellaneous works at all
crossing stations in
connection with Standard III
work between Varanasi and
Allahabad City section in
Varanasi Division of N.E.
Railway.
W/Con/362/II/854/W-3
(2) dt. 08.08.07
CAO/Con/GKP/1080
Dt. 05.05.08
Rs. 4709065/-
31.12.07 30.06.09 - - -
302 Extension of washing
pit at Azamgarh
CAO/Con/55/ 07(4) Extension of B.G. Washing
pit of 90M length at
Azamgarh Railway station on
Varanasi Division of N.E.
Railway in connection with
the work of provision of
Coach maintenance facilities
at Azamgarh.
W/Con/362/II/913/W-3
(4) dt. 23.04.08
Dy CE/Con/BSB/07
Dt. 08.03.09
Rs. 5148035/-
22.10.08 31.10.09 - - -
303 ARJ-JNU Gauge
Conversion
CAO/Con/49/ 07(1) Balance work of platform,
gate lodges, signal building,
FOB, earthwork, rebuilding
of minor bridges and other
miscellaneous work between
Aunriahr _ Jaunpur section of
Varanasi Division of N.E.
railway.
W/Con/362/II/979/W-3
(1) dt. 06.11.08
Dy CE/Con/BSB/04
Dt. 02.02.10
Rs. 23389730/-
05.05.09 - - - -
304 Standard – III
interlocking work
bet. Varanasi –
Allahabad City
CAO/Con/72/ 08(2) Linking of track, points &
crossing along with other
miscellaneous works in
crossing station yards in
connection with Standard-III
interlocking work at
Daraganj, Jhusi, Ramnathpur,
Saidabad, Handiakhas and
Bhiti Station in Varanasi-
Allahabad City section of
W/Con/362/II/997/W-3
(2) dt. 07.01.09
Dy CE/Con/BSB/05
Dt. 08.03.09
Rs. 25614171/-
07.09.09 - - - -
Varanasi Division of N.E.
Railway.
305 ARJ-JNU Gauge
Conversion
- Schedule of rates and
quantities for “Flash Butt
Welding 60Kg./52 Kg. and
90R rails at site using road
cum rail mobile Flash Butt
welding machine.
W/Con/275/II/362/FBW
P/W-3 dt. 01.08.06
CAO/Con/GKP/863
Dt.
10.01.06/01.08.06
Rs. 64125000/-
17.12.07 31.03.10 - - -
306 ARJ-JNU Gauge
Conversion
CAO/Con/39/ 08(2) Linking of track,
loading/leading/unloading of
various P-way materials, and
other miscellaneous works
between ARJ (incl.) - KCT
(incl.) stations in connection
with gauge conversion of
ARJ- JNU section in Varanasi
Division of N.E. Railway.
W/Con/362/II/969/W-3
(2) dt. 07.11.08
Dy CE/Con/BSB/09
Dt. 23.06.09
Rs. 60805772/-
06.08.09 31.03.10 - - -
307 ARJ-JNU Gauge
Conversion
CAO/Con/39/ 08(1) Linking of track,
loading/leading/unloading of
various P-way materials, and
other miscellaneous works
between KCT (excl.)-JNU
(excl.) stations in connection
with gauge conversion of
ARJ- JNU section in Varanasi
Division of N.E. Railway.
W/Con/362/II/969/W-3
(1) dt. 06.10.08
Dy CE/Con/BSB/10
Dt. 01.07.09
Rs. 42575440/-
05.07.09 31.03.10 - - -
308 Standard – III
interlocking work
bet. Varanasi –
Allahabad City
CAO/Con/67/ 08(2) Construction of RRI building
at Manduadih and other
miscellaneous works in
connection with Standard - III
interlocking work between
Varanasi and Allahabad City
section in Varanasi Division
of N.E. Railway.
W/Con/362/II/991/W-3
(2) dt. 12.02.09
Dy CE/Con/BSB/08
Dt. 06.05.09
Rs. 6121951/-
11.07.09 31.12.09 - - -
309 Standard – III
interlocking work
bet. Varanasi –
Allahabad City
CAO/Con/17/ 09(3) SKV welding of 52 kg. New
Rail 90 UTS and 52 kg./90R
(Second Hand) Rail 72 UTS
including supply of portion
and other consumable etc. on
cess/in situ between
Allahabad-Varanasi section
of Varanasi division in
connection traffic facility and
signaling works.
W/Con/247/Dy
CE/Con/BSB/17/09 (3)
dt. 17.06.09
-
Rs. 2490756/-
16.12.09 - - - -
310 ARJ-JNU Gauge
Conversion
CAO/Con/72/ 08(3) Alumino thermit Welding of
52 Kg. New Rails 90 UTS
and 52 Kg./90 R (Second
Hand) Rails 72 UTS by SKV
process including supply of
portion and other consumable
etc. on cess/in – situ between
Aunrihar - Jaunpur Railway
Stations in connection with
Gauge Conversion of
Aunrihar - Jaunpur Section
W/Con/247/Dy
CE/Con/BSB/ATW/AR
J-JNU/28 dt. 16..05.09
-
Rs. 8618700/-
15.11.09 - - - -
of Varanasi Division, N.E.
Railway.
311 ARJ-JNU Gauge
Conversion
CAO/Con/30/ 09 (4) Balance work of Construction
of platform, gate lodges,
F.O.B., earthwork for
diversion, blanketing -
rebuilding of minor bridges,
paver block and other
miscellaneous works between
Kerakat (Excl.) to Jaunpur
(Excl.) in connection with
gauge conversion of Aunrihar
-Jaunpur section in Varanasi
Division of N.E. Railway.
W/Con/247/Dy
CE/Con/BSB/30/09 (4)
dt. 24.07.09
-
Rs. 34559417/-
23.01.10 - - - -
312 Indara – Mau Patch
doubling work
CAO/Con/15/ 09(2) Linking of BG Track
manually including
dismantling BG track
wherever required, carting
and stacking P. way materials
etc. from different places to
Indara - Mau section and
other miscellaneous works at
Indara - Mau section in
connection with Indara - Mau
section doubling Patch Work
at Indara - Mau section .
W/Con/247/Dy
CE/Con/BSB/15/09 (2)
dt. 18.07.09
-
Rs. 9328521/-
17.01.10 - - - -
313 ARJ-JNU Gauge
Conversion
CAO/Con/28/ 09(2) Supplying & Stacking of 50
mm nominal size machine
crushed track ballast from
private quarry in Dala / Billi
range as per RDSO’s
specification June-2004 with
upto date correction slips
along the bank between Km.
10/0 to Km. 20/0, in Aunrihar
– Jaunpur section of Varanasi
Division, NE Railway.
W/Con/247/Dy
CE/Con/BSB/28/09
(2)/12 dt. 13.12.09
-
Rs. 9440400/-
14.09.09 13.12.09 - - -
Recommended