Status of the TPS Control System. Kuo-Tung Hsu On-behalf of the TPS Control Team NSRRC, Hsinchu, Taiwan June 13, 2011. Strategic for TPS Control System Development. TPS control system frameworks => EPICS toolkit. Most successful and largest collaboration for control system project - PowerPoint PPT Presentation
Citation preview
EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Status of the TPS Control System
Kuo-Tung Hsu
On-behalf of the TPS Control Team
NSRRC, Hsinchu, Taiwan
June 13, 2011
2EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Strategic for TPS Control System Development TPS control system frameworks => EPICS toolkit.
Most successful and largest collaboration for control system project
Development strategic for new EPICS site like TPS projectWork first, then pursue work wellLearning by doingLearn from EPICS community
Focus on hardware and software of data source layer at this moment.Standardization and minimized requires resources
Middle layer and presentation layer will be focus in next step.
Co-operative development to integrated EPICS and non-EPICS systemSome subsystems controls have their special requirements and preferencesIt need time to clarify between EPIC (poem, computer form factor, …) and
EPICS (Experimental Physics and Industrial Control System) for a new comer!
Goal: Meet system integration and commissioning and machine fine tune schedule in 2013~2014 and requirements for future development.
3EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
A Chivalrous Sword-ManJia Dao (779-843 A.D.)Spend 10-year sharpening my sword,The frost-bright blade has never tested.Let me show it to you todayHave you anything unjust to say?
劍客賈島 (779-843 A.D.)
十年磨一劍,霜刃未曾試。今日把示君,誰有不平事?
Essay by Peter Norvig: Teach Yourself Programming in Ten Years
After the sword (skill) is sharpen -Hope we can contribute something to the EPICS community in future!
Our Aspiration
4EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Phase I: Minimized type of EPICS IOCMinimized type of platform, OS and software versionsEPICS IOC Nodes
cPCI IOCs ~ 70 nodesCorrector PS control IOCs ~ 120 nodesBPM IOCs ~ 72 nodesSpecial IOCs ~ 30 nodes
Servers ~ 20 nodesControl console ~ 10 nodesBasic software for system integration, commissioning and operationBasic software development management…
Phase II :Complex and sophisticated applicationsEPICS extension…
2010 2011 2012 2013 2014 2015
Phase I Phase II
Machine Commissioning and Tuning
TPS Control System Development Phase
5EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Consolesand
Servers
Standard cPCI EPICS IOCs- Intel CPU/Linux (fully preemptive kernel )- High volume I/O- High speed serial connection (GbE, … etc.)
Miscellaneous EPICS IOCs- Pentium/XScale/ARM/PPC Linux- Soft real-time system- RS-232/422/485 Devices- CCD camera server- PLC (safety type system)- Bunch-by-bunch feedback system interface- Special applications
cPCI EPICS IOCs
File and Name Server,Gateway, Archivers, Beam Physics Server (Modeling System), Display Ma
nagers, Database Server,Alarm Server, AP Server, Boot Serve
r, Monitoring Services,Storage Server … etc.
EPICSIOC
(Input Output
Controller) Signal
Conditioning
Miscellaneous EPICS IOCs
Safety Type System
Intranet
Beamline Network,Network Attached
EPICS Devices(e.g. EPICS Oscillosc
ope,… etc.)
PLC-IOCControl Ethernet
PrivateEthernet
Field Devices(Power Supply, Motion Controller,
LXI Instruments, …etc.)
Timing
EPICS/OPI
PC/Linux
Router
Control System Infrastructure
6EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
D-TacqIntel IOP + ADC
TEWS cPCI IP carrierADLINK 128 Bits DI/DI
ADLINK cPCI CPU board
CompactPCI IOC (Linux)
BI, BO, AI, AO, Timing, Network attached devices
I-Tech BPM IOC(Intel CPU, Linux)
MRF cPCI Event System Modules
D-TacqCustom Designed
Corrector Power Supply Controller IOC(~ 20 bit DAC)
D-Tacq 18 bits DAC
Power SuppliesEthernet/LXI devices
Dimtel Bunch-by-BunchFeedback and Diagnostic
IOC
Middle Layer IOC(JavaIOC ?)
Applicaion Specific
SoftIOC
Special IOC
YEC PLC IOC
Hytec 18/20/24 bitsDAC/ADC IP Modules
Oscilloscopes
MOXA Serial Server MODBUS/TCP Devices
ADLINK cPCI Crate
64 Nodes of cPCI Platforms in Test
EPICS IOC Hardware Building Blocks
7EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Control System Computer Room to CIAs
Control and Timing fiber network
Control fiber network
To TLS Control System Computer Room
Intra-CIA fiber link
CIA #24 to Control System Computer Room and all CIAs
Control, Timing and Intra-CIA Fiber Network
8EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
CIA Switch 24 setsPulse magnet PS x 1 set
TPS Control SystemComputer Room
CIA24Network Rack
TPS Control Network Infrastructure –Baseline Design
(ready in late 2012)
~ 32 SFP+ 10 GbEdual speed ports
E3143 (TLS Control System Computer Room)
M230 (Laboratory)
10 Gigabit Fiber Links
1 Gigabit Fiber Link
NSRRCIntranet
Ethernet Switch Ethernet Switch
Ethernet Switch
Ethernet Switch
Ethernet Switch
Ethernet SwitchEthernet Switch
Ethernet Switch
Edge Switch24 GbE + 4 SFP + 2 SFP+
NTP server
Ethernet Switch
NSRRC Intranet
9EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
cPCI modules- CPU modules- 6 U cPCI EVG/EVR- 32/64/96 channel 16 bits AI 32/64 channel 24 bits AI (transient signal capture capability)- 32 channel, 18 bits AO- 128 bit DI, 128 bit DO- EVG, EVR in 6U cPCI form factor- IP carrier and IP modules 16 channel/24 bits ADC 16/8 channel 18/20 bits DAC- In house design modules
FiledbusEthernet (> 95%) Raw ASCII/LXI/VXI-11 /Modbus-TCP, ….RS-232/422-485 devices Serial device server => Ethernet… etc.
Ethernet and LXI compliant devicesPower supplyDiagnosticsElectronics instrumentsEnvironment monitoring (temperature, vibration,
pressure, …)Motion control Ethernet based motion controllerFast waveform capture
Oscilloscope and soft-IOCCamera
GigE VisionInterlock
PLC embedded EPICS IOCEthernet/LXIMiscellaneous Interface… etc.
EPICS Controls Hardware Standard
10EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
cPCI-EVRTG-300(e-Gun Trigger)
Fan-Out Concentrator
Universal I/O TTL Interlock Input ModuleUniversal I/O TTL Input UNIV-TTLIN Universal I/O TTL Output UNIV-TTLUniversal I/O TTL Output Module w/ Delay TuningUniversal I/O NIM Output UNIV-NIMUniversal I/O LVPECL Output ModuleUniversal I/O LVPECL Output Module with Delay Tuning Universal I/O HFBR-1414 Output UNIV-HFBR-1414 Universal I/O HFBR-1528 Output UNIV-HFBR-1528In-house made fanout Fanout module
cPCI-EVG-300
cPCI-EVR-300
GUN-RC-203/300
Fibre+Transceiver
Ru87
Timing System Hardware
11EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Storage ring dipole power supply, booster dipole power supply and quadrupole power supplies were awarded to the IE Power.
Control interface is similar as CLS.
Booster dipole power supply and quadrupole power supply will build in waveform generator and/or external reference input (cPCI EPICS IOC + IP Carrier Module + Hytec 18/20 bits DAC IP module).
Storage ring quadrupole 、 sextupole power supplies and transport line dipole 、quadrupoles power supply were contracted to Chroma ATE Inc. All power supply equip with Ethernet/LXI interface with NSRRC specify control functionality.
Power Supply Control Interface
12EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Interlock PLC IOC
EPICS IOCADLINK cPCI CPU
ADLINK 128 Bits DI/DO
TEWSTCP201
IP Carrier
Hytec IP ADC24 bits, 16 channels
IP-ADC-8417
EVR (CPCI6U-EVR-300)
Trigger Fanout
Trigger
Ramp Trigger
TPS Control Network
Hytec IP DAC18 bits, 16 channels
IP-DAC-8415
BR frev clock3 Hz
Power supplies trigger
EPICS IOCACQ164CPCI
24 bits ADC, 32 ch, GbE
SextupoleSD, SF PS
Ethernet Switch
Ethernet Interface:On/Off controlStatus readbackInterlock reset
Two Options: Analogue Reference Input (Waveform) or Embedded Waveform Generator
Booster Dipole, QF, Q1, Q2, QM PS (IE Power Inc.)
Booster Main Power Supply Control Interface
13EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
TPS Control network
CellPower Supply
Control cPCI IOC
Ethernet Switch
Quad (10), Sextupole (7)(Chroma ATE Inc.)
x 24
EPICS Access(10 Hz rate)
Orbit Feedback Setting(10 kHz rate)
CPU Module
±10 Amp Power Supplies (ITRI)
EVR (cPCI-EVR-300)
Corrector Power Supply
Controller(CPSC)
SR Slow Correctors 168 (H) +168 (V)SR Fast Correctors 96 (H) + 96 (V)
Skew Quadrupole 96BR Correctors 60 (H) + 36 (V)
EPICS IOC20 bits DAC24 bits ADC
(D-Tacq)
CLK/Trigger
Dipole PS(IE Power)
x 1
Power Supply Control in one Cell
14EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
+Slow Setting
Buffer
External Clock Input
DO (LEMO connector, for timing measurement), Trigger out, Package received
Write Registers8 bit DO
Setting Buffers
GigabitEtherne
t
Slow Trigger(on demand, may not necessary)
Heartbeat Register
Rx
FastSetting Ports (GbE, UDP/IP),Through Port
Heartbeat Register
AURORA
8 Ch, 20 bit DAC
Single Board Computer(Linux, EPICS IOC) Status Registers
8 bit DI
24 ch, 16 bit ADC
8 ch, 24 bit ADC(10 kHz Sampling)
Slow Access(~ 10 Hz)
Control and Status Registers
Ethernet Interface(Hardware UDP Stack)
96 pinDIN61412
Connectors x 2
+/- 15 V+ 5 V
4 ways,8 ch adder
~8 x 64 k x 32 bitWaveform Memory
Sequencer10 kHz clock
Waveform MemoryFree running
Or Pre/Post Trigger10 Hz rate data
Trigger (3 Hz) Precise digital temperature sensors
Individual Channel Enable/Disable?
Control and Status RegistersSlow Access (~ 10 Hz)
RxTx
FastSetting Port,
Through Port
(AURORA)
TxSFP Port
Up to 10 kHz (Fast Setting Clock)10 kHz Clock Generator
10 kHz rate waveform
Data AcquisitionTrigger input
Corrector Power Supply Controller (CPSC)SR corrector PS (fast + slow), skew quad, BR correctors
15EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Orbit Feedback Environment within for one Cell
To Cell N-1Group 14*Magnet output
repeater
Add XBPM in IOFB or local feedback are feasible.
To Cell N+1
I-Tech SolutionGroup 8*Magnet output
CPSC for Skew quad4 (or more)
Cell’s Edge Switch
CPSC for slow horizontal corrector
7 CPSC for slow
vertical corrector7
BPM Grouping Links(2.5~3.125 Gb/s)
AURORA
AURORA
CPSC for fast horizontal and vertical corrector
4 + 4
TPS Control Network
Fast Setting GbE link
16EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Storage ringFront-end
Beamline and Experimental StationHardwired handshake
Cell N+1 Vacuum SyustemcRIO PAC
Beamline N-1 front-endcRIO PAC
1. Vacuum and front-end: Vacuum gauge reading IP current Valves information Various status (pressure 、 temp 、 flow rate 、… )2. Limited setting functionality
CIA #N-1EPICS IOC
EPICSCA gateway
Ethernet
Accelerator Control System and Vacuum and Front-end PAC System
MachineProtection
System
Cell N Vacuum SystemcRIO PACCell N-1 Vacuum SystemcRIO PAC
Beamline N-1 Control System and Experimental Station
Front-end Status Fanout
EPICS CAChannel
MODBUS/TCP
Accelerator Control System
Vacuum & FrontendControl System
Beamline & End-Station
17EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
TPS Phase I ID Plans (10 IDs)
IU22 3 M x 3IU22 (1+1) x 2EPU48 (1+1) x 1(U50, EPU48 ?) x 1
18EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
TPS Control Ethernet
PowerSupplies
128 Bits DI/DIcPCI CPU boardCompactPCI
Insertion Devices IOC
(Linux,EPICS)
200 update/sec
IP DAC16 channels, 18 bits
IP ADC16 channels, 24 bits
Motor Drivers(Stepper (IU22) or Servo (EPU)
Encoders(SSI,
Incremental)
LimitSwitches
TemperatureRTD/TC
VacuumIon-Pump,BA Gauge
Global compensationUDP/IP (~ 200 update/sec)
Local compensation
EPICS OPI
Beamline monochromator synchronization link ?
Beamline control system
Wiring Adapters
MOXA RS-232/422/485 Serial Device Servers
RS-232/485 Based Devices Galil DM-404x Motion Controller
Ethernet Switch
EPICSGateway
ICPDAS RTD/TC(POE)
Interlock Logic
Insertion Devices Control Environment
19EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Motion Controller
EPICS IOC
Status update every 5 msec
EPICS CA access ~ 10 Hz rate
LocalCompensationPower Supplies
Setting update every 5 msec
Gap/Phase information broadcas
t every 5 msec
Clients(Global orbit/tune/coupling
correction,, …)
Fast SettingReal-time Ethernet(up to 10 kHz rate)
Soft real-time applications are supported (~ 5 msec)
StreamDevice
Quadrupole control ~ 10 update/sec(via standard EPICS channel)
Correctors & skew quads
ID Global Compensation Solution
20EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
EPICS IOCADLINK cPCI CPU
TEWS TCP201 IP Carrier
EPICS Ethernet(3 Hz rate)
Hytec IP ADC24 bits, 16 channels
IP-ADC-8417
Trigger3 Hz @ TZERO
Storage Ring DCCT
EVR (cPCI-EVR-300)
10 kHz sampled data averaged into 3 Hz rateLifetime calculation updated in 3 Hz rate
ITau
I x TauAccumulated I x Tau
Transfer efficiency form booster synchrotron to storage ring
HeartbeatDetector
ToMachine
ProtectionSystem
Beam Trip Detector
Orbit Interlock Threshold
Lock-in Amplifier
Hytec IP ADC24 bits, 16 channels
IP-ADC-8417
2 A, 5 kHzTone Loop
ThresholdRelay
Stop Injection Trigger:
Current achieve target valueDCCT failedEPICS IOC failed
BPM VLANSUM signals from
several BPM @ 10 Hz rate
For Beam Current Safety Check
2 A
Excitation OFFNPCT Power Loss
DCCT OK
DCCT Failed
TPS Storage Ring DCCT IOC
21EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Turnkey systems compliant with EPICS included:Linac (EPICS ready)RF transmitter
… etc.
Turnkey EPICS devices included:BPM electronics, feedback processor, oscilloscope, …
Measures to minimize amount of workload for integration supports and maintenance
Standard components should be chosen to get consistency of hardware
EPICS development environment and documentation on the TPS application development process
Turnkey System Interface
22EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
TPS Control Network
Lianc Timing and IOC(Timing, LTB PS, LTB Diagnostics, Oscilloscopes, GigE Vision
Camera,… etc.)
EPICSOPI
TPS Control Environment
Modulator #1
Linac ControlEthernet Switch
Modulator #3Gun
LocalController
(PLC, ..etc.)
LocalControlPanel
Power Supply
RFVacuumInterlock
…etc.
LocalController
(PLC, ..etc.)
LocalControlPanel
LocalController
(PLC, ..etc.)
LocalControlPanel
LocalController
(PLC, ..etc.)
LocalControlPanel
Linac RF, Diagnostic, …etc
LocalController
(PLC, ..etc.)
Timing Network
Event ReceiverEVR
CPCI-EVR-300,cPCI-EVRTG-300
cPCI CPU board
+
+
Linac Timing IOC (Linux)
cPCI IOC
Trig SignalGun grid pulser, Klystron Current/ Voltage, RF, Faraday Cup, Current Transfor
mer, … etc.
RI’s EPICSSoft-IOC
Gun Trigger
Optical Fiber
+
LTB Devices
RI’s Linac – EPICS Enable
23EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Vacuum system and Beamline Front-end (responsive by Vacuum Group) Connect to cRIO based PAC System via MODBUS/TCP links
DiagnosticsBPM electronics: Embedded EPICSImage: GigE Vision cameraMiscellaneous controls: Motor, BI, BO, AI, AO, counter
RF (responsible by RF group)=> Transmitter, LLRF, Cryogenic ElectronicsEPICS CA interface
Machine protection=> Dedicated PLC system with fast link PLC Embeded EPICS IOC
Safety system (responsible by Radiation Safety Group)Ethernet to control system.
Others Subsystem Interface
24EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Feedback system interface Orbit control – embedded with power supply controlBunch-by-bunch feedbackTune feedbackFiling pattern feedback
Environment monitoring: Vibration, Temperature, …Raw TCPLXIMODBUS/TCP
Post-mortem supportsMany devices support this functionalityTrigger by event system
…
Others Subsystem Interface – cont.
25EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
NPCTIOC(Beam current,Beam lifetime,…)
FillingPatternIOC(Bunch current,Bunch lifetime,…)
Timing Master IOCEVG
LinacEVR
Gun Timing,Linac Timing,
Timing DiagnosticInjection Control
IOC
CA accessCA access
Injection and ExtractionTiming IOC
EVR
Booster Main PSTiming IOC
EVR
GunEVR
UplinkEVR
Timing Fanout
Two injection control options: Matlab scripts running on control console (3 Hz injection rate tested)
EPICS record processing (in consider)
Injection Control
26EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Control system framework: EPICS toolkitDevelopment focus on V3V4 and extension are in study
High level physics framework (responsible by Beam Dynamic Group) :Matlab/Accelerator Toolkit/Matlab Middle Layer
Applications interface and Operation related applications:DefineImplementation
Many items are still in studyRDBE-logArchiver and retrieverDocumentation… etc.
Software Infrastructure
27EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Basic EPICS environment Subsystem control
Device supports and device driversUser interface (control and status monitoring)Cold start, warm up, shutdown, operation checkSave and restore
Subsystem application programsGun processing
Power supply performance checkBPM system diagnosticEPICS IOCs house keepingNetwork monitoring… etc.
High level applicationsBeam diagnostic related ….
Special operation applicationsEPICS IOC housekeepingNetwork trafficMagnet degaussingSybsystem warm-up, processingSave/restoreLattice management
Save, restore, …LTB, BTS, Booster Synchrotron, Storage Ring, …etc.
Booster synchrotron: ramping waveform managementInjection control
Bucket addressingInjectionTop-up injectionFilling pattern control and feedback
Multi-bunchSingle bunchMultiple single bunch (Isolated bunch)Exotic filling pattern - Camshaft mode, Repeat Camshaft mode, ….
Etc.Special operation applications – cont.
Timing controlPulse magnets current waveform monitoringAlarm checkingArchiver and browserMachine status web pageSafety system statusBeamline related applications
Feed-forward table managementOrbit feedback supportsMachine status web page
….
Commissioning and Operation Related Applications Check List (2012-2014)
Intensity monitorStorage ring DCCT
Current and lifetime stream dataBooster synchrotron DCCT
Current waveformLTB/BTS FCT
Stream dataInjection efficiency
Filling pattern monitorStorage ring
Bunch current (or charge)Bunch purity monitor for isolated bunch
Booster synchrotronBunch current
BPM relatedConfiguration toolsLTB/BTS single pass BPMBooster BPM display
Ramping orbitStorage ring BPM (A, B, C, D, X, Y, Q, SUM, I, Q)
First tune dataTurn-by-turn10 kHz steam data10 Hz stream dataOrbit (in waveform – array format)Spectrum for turn-by-turn dataSpectrum for 10 kHz dataSpectrum for 10 Hz data
Bunch-by-bunch dataBunch phase oscillation dataBunch oscillation data
TuneBooster ramping tuneStorage ring tune
….Real-time beam loss monitor Screen monitor
Actuator controlImage acquisitionImage analysis
Synchrotron radiation monitorBooster synchrotron
Optical controlTiming controlImage acquisitionImage analysis
Storage ringOptics controlImage acquisitionImage analysis
Bunch-by-bunch dataBunch phase oscillation dataBunch oscillation data
Waveform data….….….
Plan based on priority and delivery schedule
28EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
TPS Synoptic Page
TPS LTB GUI
E-Gun Trigger ModuleTiming Master Prototype
Test Screen Monitor
Single PS GUI
Developed Simple Applications
29EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
TPS Timing Modules Configuration PageProfile Analysis
TPS Timing Summary Control Page
Single Pass BPM
Kicker Pulser Control
FCT Waveform
Developed Simple Applications – cont.
30EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
To enable early testing of applications through the control system, a virtual accelerator has been implemented to give simulation of the accelerators though the intended EPICS PV interface. Prototype was set up by the help from DLS. Current version is on AT/MML environment.
TPS Storage Ring
(Lattice provided by BD Group)
Virtual TPS Storage Ring (EPICS)
Virtual Accelerator EPICS IOC
31EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Major procurements are in proceed. Plans for installation. Learn how to deal with EPICS system development and management. Infrastructure of the software system. TODO list for the software components. Familiar with subsystem for applications development. Explore EPICS new developments:
For middle layer applicationsFor API interface and another applications
Solutions for archiver and retriever, RDB, E-Log, … etc. Plan a realistic schedule and set priority.
Current Efforts
32EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Implementation of the TPS control system is under way.
Standard hardware are specified.
Standardization of software components and tools are the current focus.
High level applications and EPICS extensions will be the next focus issues.
Reinforce collaboration with EPICS community. Help from the EPICS community are essential!
Summary
33EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
34EPICS 2011 Spring Meeting, Hsinchu, June 13-17, 2011
Announcement
1. Name list for Taipei visit is posted on the bulletin board. Please check its correctness! If you name is missing, please contact information desk.
2. NSRRC offer to buy insurance for your stay in Taiwan this week. If you are still interest and not provide your information, please contact information desk.
3. The 3rd floor meeting room is available for your lunch also.
4. Tour of TPS Linac and TLS – please gather on the front gate of this building at 13:00.